Waste Site Cleanup & Reuse in New England
Atlas Tack Corporation Superfund Site
Weekly Demolition/Cleanup Activities Update
« Back to Atlas Tack Superfund Site Fact Sheet
Projected Activities for the Week of October 17 -- October 21
- Continue crushing concrete & brick
- Begin soil sampling program
- Continue dust control methods
- Continue air monitoring at all 4 stations & in neighborhood locations
Activities Performed During the Week of October 10 -- October 14
- Continue crushing concrete
- Remove / crush concrete pipe chase in slab area
- Survey layout of grid for soil sampling program
- Continue dust control methods
- Continue air monitoring at all 4 stations & in neighborhood locations
Air Monitoring Information
Charter Environmental continues to monitor the four sampling locations during the 8 -hour day for dust particulates.
The four perimeter sampling stations are set up in the following locations:
Station 1 -- Site fence gate on Pleasant Street
Station 2 -- Site fence on east end of Church Street
Station 3 -- Site fence on bike path at Tripp Street
Station 4 -- Site fence at bike path near Adams Street
The dust particulate and asbestos sampling results recorded at each station every hour in a monitoring log. These results are compared to the action levels established for each parameter. These action levels are concentrations at which it is deemed unsafe and work would have to stop.
Results of the air monitoring data has shown that exposure of unsafe conditions to workers in the exclusion zone and to the public is well below the actions levels.
Dust Particulate Monitoring -- The National Ambient Air Quality standard for particulates is 150 micrograms per cubic meter (µg/m3) over an average of 24 hours. This value will be used, however, for a one hour period. Heavy metal presence is factored into determination of this action level. The average levels recorded at these locations range from 0 to 0.697 (µg/m3), with most readings valued at zero. The maximum level for this week is also recorded and ranges from 0.001 to 15.410 (µg/m3).
Asbestos Monitoring - Asbestos monitoring has been discontinued. All abatement measures have been completed, therefore monitoring is no longer required.
Actual Data - Below are tables showing the average and maximum dust particulate readings taken at each sampling location during the week of October 6 through October 12.
Dust
Particulate Results |
|||||
Dust
Particulate Sampling Location 1 - Pleasant Street
Gate |
|||||
Readings are recorded as micrograms per cubic meter (µg/m3) |
|||||
| Time | Thursday, 10/6 |
Friday, 10/7 |
Monday, 10/10 |
Tuesday, 10/11 |
Wednesday, 10/12 |
| Average | 0.000 | 0.000 | 0* | 0.000 | 0* |
| Maximum | 0.553 | 0.334 | 0* | 0.292 | 0* |
Dust
Particulate Sampling Location 2 -
Site Fence at East End of Church Street |
|||||
Readings are recorded as micrograms per cubic meter (µg/m3) |
|||||
| Time | Thursday, 10/6 |
Friday, 10/7 |
Monday, 10/10 |
Tuesday, 10/11 |
Wednesday, 10/12 |
| Average | 0.000 | 0.009 | 0* | 0.000 | 0* |
| Maximum | 0.295 | 0.510 | 0* | 0.090 | 0* |
Dust
Particulate Sampling Location 3 - Site Fence at
Bike Path/Tripp Street |
|||||
Readings are recorded as micrograms per cubic meter (µg/m3) |
|||||
| Time | Thursday, 10/6 |
Friday, 10/7 |
Monday, 10/10 |
Tuesday, 10/11 |
Wednesday, 10/12 |
| Average | 0.019 | 0.015 | 0* | 0.000 | 0* |
| Maximum | 1.261 | 0.310 | 0* | 0.724 | 0* |
Dust
Particulate Sampling Location 4 - Site Fence at Bike Path/Adams Street |
|||||
Readings are recorded as micrograms per cubic meter (µg/m3) |
|||||
| Time | Thursday, 10/6 |
Friday, 10/7 |
Monday, 10/10 |
Tuesday, 10/11 |
Wednesday, 10/12 |
| Average | 0.697 | 0.195 | 0* | 0.004 | 0* |
| Maximum | 0.001 | 15.410 | 0* | 0.724 | 0* |
Note: 0* indicates monitoring not performed on October 10th & 12th due to heavy rains during hours of operation.
Samples for dust particulate were taken in the neighborhood on October 11 , 2005. Results are shown below. |
|||||
Readings are recorded as micrograms per cubic meter (µg/m3) |
|||||
| Sampling Location | 85 Pleasant St. | 2 Adams St. | 97 Center St @ Adams St. | 32 Adams At. @ Washington | 70 Church St. @ Pleasant St. |
| Value | 0.039 | 0.028 | 0.027 | 0.025 | 0.036 |