Atlas Tack Corporation Superfund Site
Weekly Demolition/Cleanup Activities Update

« Back to Atlas Tack Superfund Site Fact Sheet

Projected Activities for the Week of December 5 - December 9

  • Complete confirmation soil sampling program
  • Survey confirmatory sample locations
  • Continue cleanout of plating pit residual sludge
  • Continue shipment of pit sludge / debris off site for disposal

Activities Performed During the Week of November 28 – December 2

  • Complete crushing concrete & brick
  • Conduct soil confirmation sampling.
  • Ship two containers of wood debris off site for disposal
  • Ship two trailers of metal debris off site for disposal
  • Ship 7 containers of Plating Pit Sludge off site for disposal
  • Continue dust control methods
  • Continue air monitoring at all 4 stations & in neighborhood locations

Air Monitoring Information

Charter Environmental continues to monitor the four sampling locations during the 8 -hour day for dust particulates.

The four perimeter sampling stations are set up in the following locations:

Station 1 -- Site fence gate on Pleasant Street
Station 2 -- Site fence on east end of Church Street
Station 3 -- Site fence on bike path at Tripp Street
Station 4 -- Site fence at bike path near Adams Street

The dust particulate and asbestos sampling results recorded at each station every hour in a monitoring log. These results are compared to the action levels established for each parameter. These action levels are concentrations at which it is deemed unsafe and work would have to stop.

Results of the air monitoring data has shown that exposure of unsafe conditions to workers in the exclusion zone and to the public is well below the actions levels.

Dust Particulate Monitoring -- The National Ambient Air Quality standard for particulates is 150 micrograms per cubic meter (µg/m3) over an average of 24 hours. This value will be used, however, for a one hour period. Heavy metal presence is factored into determination of this action level. The average levels recorded at these locations range from 0 to 0.001 (µg/m3), with most readings valued at zero. The maximum level for this week is also recorded and ranges from 0.000 to 0.660 (µg/m3).

Asbestos Monitoring - Asbestos monitoring has been discontinued. All abatement measures have been completed, therefore monitoring is no longer required.

Actual Data - Below are tables showing the average and maximum dust particulate readings taken at each sampling location during the week of November 24 through November 30.

Dust Particulate Results
Dust Particulate Sampling Location 1 - Pleasant Street Gate

Readings are recorded as micrograms per cubic meter (µg/m3)

Time Thursday,
11/24
Friday,
11/25
Monday,
11/28
Tuesday,
11/29
Wednesday,
11/30
Average Holiday * Holiday * 0.000 0.000 0*
Maximum 0 0 0.344 0.660 0*
 
Dust Particulate Sampling Location 2 - Site Fence at East End of Church Street

Readings are recorded as micrograms per cubic meter (µg/m3)

Time Thursday,
11/24
Friday,
11/25
Monday,
11/28
Tuesday,
11/29
Wednesday,
11/30
Average Holiday * Holiday * 0.001 0.000 0*
Maximum 0 0 0.344 0.660 0*
 
Dust Particulate Sampling Location 3 - Site Fence at Bike Path/Tripp Street

Readings are recorded as micrograms per cubic meter (µg/m3)

Time Thursday,
11/24
Friday,
11/25
Monday,
11/28
Tuesday,
11/29
Wednesday,
11/30
Average Holiday * Holiday * 0.001 0.000 0*
Maximum 0.866 0.226 0.080 0.220 0*
 
Dust Particulate Sampling Location 4 - Site Fence at Bike Path/Adams Street

Readings are recorded as micrograms per cubic meter (µg/m3)

Time Thursday,
11/24
Friday,
11/25
Monday,
11/28
Tuesday,
11/29
Wednesday,
11/30
Average Holiday * Holiday * 0.000 0.001 0*
Maximum 0 0 0.022 0.020 0*

 

Samples for dust particulate were taken in the neighborhood on November 15, 2005. Results are shown below.

Readings are recorded as micrograms per cubic meter (µg/m3)

Sampling Location 85 Pleasant St. 2 Adams St. 97 Center St @ Adams St. 32 Adams At. @ Washington 70 Church St. @ Pleasant St.
Value 0.000 0.000 0.001 0.000 0.000
 
*Note: Sampling was not conducted on Thursday and Friday November 24, 25 due to the Thanksgiving Day Holiday. Sampling was not conducted on Wednesday, November 30, due to rain during hours of operations.