Eau Claire Municipal Well Field
Site Information
- Eau Claire, WI (Eau Claire County)
- EPA ID# WID980820054
- NPL Site Narrative
- NPL Factsheet
- Superfund Site Progress Profile
- Alias(es): N/A
- Map (Enviromapper)
Contact Information
Community Involvement Coordinator
Susan Pastor (pastor.susan@epa.gov)
312-353-1325 or 800-621-8431, ext. 31325
Remedial Project Manager
Howard Caine (caine.howard@epa.gov)
312-353-9685 or 800-621-8431, ext. 39685
Repositories
(where to view written records)
L.E. Phillips Memorial Public Library
400 Eau Claire Street
Eau Claire, WI 54701
Background
The Eau Claire Municipal Well Field, located in Eau Claire, Wisconsin, consists of 14 municipal ground-water wells. They provide drinking water to the 57,600 residents of Eau Claire County. In the mid-1980s, routine ground-water sampling by the state of Wisconsin indicated elevated levels of volatile organic compounds in the municipal water supply.
In 1985, EPA selected air stripping as an interim measure to address ground-water contamination at the well field. It was built in 1987. EPA's 1988 cleanup plan provided for continued operation of the two-column air stripper which was built in 1987. EPA also required other measures such as connection of private wells to the municipal water system and installation of additional extraction wells in the North Field and Plume 2 for direct discharge into the Chippewa River. During the cleanup, EPA concluded that the nearby National Presto Industries Superfund site was the source of the well field's ground-water contamination.
In 2009, EPA changed the ground water cleanup standards detailed in its 1988 cleanup plan, or record of decision. The Agency was legally required to issue an official document called "Explanation of Significant Differences" [Explanation of Significant Differences (PDF) (13pp, 570K) December 2009] which outlines the changes. Originally, the Target Cleanup Levels, or TCLs, were developed by EPA as its cleanup goals rather than the state's ground water quality standards described in Wisconsin Administrative Code NR 140. Wisconsin NR 140 also uses the Enforcement Standards as a compliance standard for human health and welfare concerns. The Enforcement Standards now serve as the ground water cleanup goals.
Site Updates || Technical Documents || Five-Year Reviews
You will need the free Adobe Reader to view some of the files on this page. See EPA's PDF page to learn more.
Site Updates
December 2011
The air stripper at the well field was shut down in November for about two weeks while EPA did some confirmation sampling from various points of the water plant. A report detailing the results will be available in early 2012. The air stripper was restarted after the sampling was completed.
The last five years of water data have been reviewed and it appears the individual production wells are meeting the Wisconsin enforcement standards cleanup levels. Blended water from these production wells also meets those standards.
In the meantime, EPA is doing a status review of the site's cleanup. This type of review is required at least every five years where the cleanup is complete but hazardous waste remains managed on-site. These reviews are done to ensure that the cleanup continues to protect people and the environment. This is the fourth five-year review for the well field. Contact the site community involvement coordinator and/or the remedial project manager to provide input on this review process.
The review will include:
- An evaluation of background information
- Cleanup requirements
- Effectiveness of the cleanup and any anticipated future actions
- An analysis of ways for EPA to operate more efficiently
A report, which will be available by July 2012, will detail the site's progress.
Technical Documents
- Explanation of Significant Differences (PDF) (13pp, 570K) December 2009
- Proposed Plan (PDF) (11pp, 606K) March 1988
- Record of Decision (PDF) (25pp, 51K) March 1988 or this larger version Record of Decision (PDF) (44 pp, 2.2MB) March 1988
- Record of Decision (PDF) (17pp, 38K) June 1985 or this larger version Record of Decision (PDF) (37 pp, 1.6MB) June 1985
- Feasibility Study (PDF) (101 pp, 3.7MB) April 1985
Five-Year Reviews
- Third five-year review (PDF) (183pp, 10.6MB) July 2007
- Second five year review (PDF) (201pp, 8.8MB) September 2002
- First five year review (PDF) (5 pp, 411K) September 1997
![[logo] US EPA](http://www.epa.gov/epafiles/images/logo_epaseal.gif)