Solutia Inc.
RCRA Site Information
- Sauget, IL (St. Clair County)
- EPA ID# ILD000802702
- Alias: Monsanto
Contact Information
Community Involvement Coordinator
Rafael P. Gonzalez (gonzalez.rafaelp@epa.gov)
312-886-0269 or 800-621-8431, ext. 0269
Site Manager
Kenneth Bardo (bardo.kenneth@epa.gov)
312-886-7566 or 800-621-8431, ext. 7566
Repositories
(where to view written records)
Cahokia Public Library
140 Cahokia Park Drive
Cahokia, IL 62206
618-332-1491
Background
Solutia is a chemical manufacturer that has operated at 500 Monsanto Avenue in Sauget, IL, for nearly 100 years. Solutia manufactured various organic chemicals derived from benzene, including PCBs. The Solutia W.G. Krummrich Plant was formerly operated by Monsanto, which spun-off its chemical business in 1997. It is located just east of the Mississippi River along Illinois Route 3 in the American Bottom.
EPA issued a RCRA 3008(h) Administrative Order on Consent (AOC) on May 3, 2000. On February 26, 2008, EPA issued a Final Decision to remediate soil and groundwater contamination. The $22 million remedy focuses on removing source areas of PCBs, benzene, chlorobenzenes, lead, and mercury potentially impacting workers, contaminating groundwater, and migrating to the Mississippi River.
In 2004, Solutia completed an interim remedy to contain, intercept, and collect contaminated groundwater discharging and causing environmental impacts to the Mississippi River. A groundwater migration control system was installed at the river's edge consisting of a slurry barrier wall keyed into bedrock and groundwater collection wells. Collected groundwater is treated at the American Bottom POTW.
Site Updates || Fact Sheets || Technical Documents || Public Meetings
You will need the free Adobe Reader to view some of the files on this page. See EPA's PDF page to learn more.
Site Updates
Fact Sheets
- Results Released for Homes and former Dead Creek Area Fact sheet (PDF) (2pp, 110KB) October 2012
- Environmental Cleanup at Solutia Krummrich Plant - Public Outreach Fact Sheet (PDF) (2pp, 127KB) October 2012
Technical Documents
Construction Completion Reports
- Soil Vapor Extraction System Construction Completion Report (PDF) (126pp, 7.7MB) June 2012
- Interim Remediation of PCBs in Soils (PDF) (256pp, 21MB) December 2009
- Addendum II to the Interim Construction Completion Report: Offsite Remediation of PCBs in Soil (IDOT Right-of-Way) (PDF) (283pp, 70.2MB) September 2011
- Remediation of Lead in Soils (PDF) (47pp, 3MB) February 2009
- Remediation of Mercury in Soils (PDF) (186pp, 12MB) February 2009
Groundwater Monitoring
- Long-Term Groundwater Monitoring Reports
- 2012
- 1st Quarter Data Report (PDF) (172pp, 18MB)
- 2011
- 1st Quarter Data Report (PDF) (182pp, 14MB)
- 2nd Quarter Data Report (PDF) (162pp, 17.9MB) Aug. 25, 2011
- 3rd Quarter Data Report (PDF) (168pp, 34MB)
- 4th Quarter Data Report (PDF) (145pp, 5.26MB)
- 2010
- 1st Quarter Data Report (PDF) (305pp, 11MB)
- 2nd Quarter Data Report (PDF) (275pp, 9MB)
- 3rd Quarter Data Report (PDF) (244pp, 15MB)
- 4th Quarter Data Report (PDF) (243pp, 14MB)
- 2009
- 1st Quarter Data Report (PDF) (193pp, 5MB)
- 3rd Quarter Data Report (PDF) (378pp, 9MB)
- 4th Quarter Data Report (PDF) (206pp, 8MB)
- 2008
- 3rd Quarter Data Report (PDF) (211pp, 23MB)
- 4th Quarter Data Report (PDF) (146pp, 6MB)
- 2012
- Supplemental Groundwater Monitoring
- 2012
- 1st Quarter Data Report (PDF) (172pp, 35.1MB)
- 2011
- 2012
- 3rd Quarter Data Report (PDF) (99pp, 20.6MB)
- 4th Quarter Data Report (PDF) (112pp, 4.53MB)
- Plume Stability Monitoring Program Data
- 2008
- 1st Quarter Data Report (PDF) (413pp, 14MB)
- 2nd Quarter Data Report (PDF) (376pp, 14MB)
- 2007
- 4th Quarter Data Report (PDF) (450pp, 27MB)
- 2008
- PCB Groundwater Quality Assessment Reports
- 2012
- 1st Quarter Data Report (PDF) (79pp, 12.9MB)
- 2011
- 1st Quarter Data Report (PDF) (86pp, 14MB)
- 2nd Quarter Data Report (PDF) (93pp, 13.3MB) Aug. 25, 2011
- 3rd Quarter Data Report (PDF) (87pp, 5.36MB)
- 4th Quarter Data Report (PDF) (79pp, 3.89MB)
- 2010
- 1st Quarter Data Report (PDF) (85pp, 4MB)
- 2nd Quarter Data Report (PDF) (81pp, 4MB)
- 3rd Quarter Data Report (PDF) (95pp, 12MB)
- 4th Quarter Data Report (PDF) (110pp, M)
- 2009
- 1st Quarter Data Report (PDF) (74pp, 4MB)
- 3rd Quarter Data Report (PDF) (106pp, 3MB)
- 4th Quarter Data Report (PDF) (98pp, 4MB)
- 2008
- 1st Quarter Mobility and Migration Investigation (PDF) (135pp, 7MB)
- 2nd Quarter Mobility and Migration Investigation (PDF) (143pp, 12MB)
- 3rd Quarter Data Report (PDF) (221pp, 9MB)
- 4th Quarter Data Report (PDF) (78pp, 4MB)
- 2007
- 4th Quarter Mobility and Migration Investigation (PDF) (155pp, 12MB)
- 2012
- Route 3 Drum Site Groundwater Monitoring Reports
- 2012
- 1st Quarter Data Report (PDF) (66pp, 5.75MB)
- 2011
- 1st Quarter Data Report (PDF) (80pp, 20MB)
- 2nd Quarter Data Report (PDF) (66pp, 9.94MB) Aug. 25, 2011
- 3rd Quarter Data Report (PDF) (70pp, 2.15MB) Aug. 25, 2011
- 4th Quarter Data Report (PDF) (64pp, 2.5MB) Aug. 25, 2011
- 2010
- 1st Quarter Data Report (PDF) (69pp, 2MB)
- 2nd Quarter Data Report (PDF) (73pp, 3MB)
- 3rd Quarter Data Report (PDF) (91pp, 10MB)
- 4th Quarter Data Report (PDF) (99pp, 12MB)
- 2009
- 1st Quarter Data Report (PDF) (50pp, 2MB)
- 2nd Quarter Data Report (PDF) (80pp, 3MB)
- 3rd Quarter Data Report (PDF) (81pp, 2MB)
- 4th Quarter Data Report (PDF) (74pp, 3MB)
- 2008
- 3rd Quarter Data Report (PDF) (59pp, 4MB)
- 4th Quarter Data Report (PDF) (49pp, 3MB)
- 2012
- Offsite Supplemental Groundwater Monitoring Program (PDF) (4pp, 99K) Aug. 16, 2011
Soil Vapor Extraction Remediation
- Response to EPA Comments dated March 29, 2012 (PDF) (126pp, 8.29MB)
- Soil Vapor Extraction System - Sampling and Analysis Plan (PDF) (256pp, 6.52MB)
- Operation, Maintenance, and Monitoring Manual (PDF) (1084pp, 102MB)
- Soil Vapor Extraction Pilot Testing Work Plan (PDF) (358pp, 8MB) December 2008
- Soil Vapor Extraction Pilot Testing Report (PDF) (66pp, 217K) November 2010
- Appendix A - Individual Well Parameter Evaluation Testing Data (PDF) (6pp, 125K)
- Appendix B - Multiwell Parameter Evaluation Testing Data (PDF) (6pp, 114K)
- Appendix C - Performance Evaluation Data Tables (PDF) (7pp, 148K)
- Appendix D - Laboratory Analytical Reports
Soil Data
- Basline A (PDF) (77pp, 1MB) January 2009
- Basline B (PDF) (74pp, 1MB) January 2009
- Interim Soil Data (PDF) (54pp, 807K) March 2010
- Sub Area Baseline (PDF) (29pp, 686K) May 2010
- Sub Area Final (PDF) (73pp, 813K) June 2010
- Appendix D - Laboratory Analytical Reports
Soil Vapor Data
- Basline Soil Vapor Lab Data (PDF) (31pp, 1MB) April 2009
- Appendix D - Laboratory Analytical Reports
Soil Data
- Basline A (PDF) (77pp, 1MB) January 2009
- Basline B (PDF) (74pp, 1MB) January 2009
- Interim Soil Data (PDF) (54pp, 807K) March 2010
- Sub Area Baseline (PDF) (29pp, 686K) May 2010
- Sub Area Final (PDF) (73pp, 813K) June 2010
- Appendix D - Laboratory Analytical Reports
Soil Vapor Data
- Basline Soil Vapor Lab Data (PDF) (31pp, 1MB) April 2009
- Appendix D - Laboratory Analytical Reports
Vapor Data
- Vapor Data (PDF) (35pp, 2MB) February 2010
- Vapor Data (PDF) (21pp, 1MB) March 2010
- Vapor Data (PDF) (21pp, 1MB) March 2010
- Vapor Data (PDF) (21pp, 1MB) April 2010
- Vapor Data (PDF) (21pp, 1MB) May 2010
- Vapor Data (PDF) (22pp, 4MB) May 2010
- Vapor Data (PDF) (21pp, 1MB) May 2010
- Vapor Data (PDF) (21pp, 1MB) May 2010
- Vapor Data (PDF) (22pp, 1MB) June 2010
- Vapor Data (PDF) (21pp, 1MB) June 2010
- Vapor Data (PDF) (25pp, 1MB) July 2010
- Vapor Data (PDF) (21pp, 1MB) July 2010
- Appendix E - Summary of Analytical Results Table (PDF) (2pp, 100K)
- Appendix F - Air Flow Modeling (PDF) (6pp, 439K)
- Figures 1 through 3a Executive Summary (PDF) (4pp, 370K)
- Figures 1 through 9b (PDF) (12pp, 1MB)
- 100% Soil Vapor Extraction System Design (PDF) (172pp, 4.86MB) Sept. 30, 2011
Former Chlorobenzene Process Area Remediation
- 100% Enhanced Aerobic Bioremediation System Design Nov. 9, 2011
- Cover Letter (PDF) (3pp, 49K)
- Text (PDF) (97pp, 510K)
- Figures (PDF) (29pp, 3.13MB)
- Tables (PDF) (18pp, 232K)
- Appendices (PDF) (37pp, 469K)
- 100% Thermally Enhanced Soil Vapor Extraction System Design Nov. 9, 2011
- Cover Letter (PDF) (3pp, 50K)
- Text (PDF) (112pp, 501K)
- Figures (PDF) (40pp, 4.75MB)
- Tables (PDF) (26pp, 126K)
- Appendices (PDF) (36pp, 968K)
Air Modeling of Potential Historical Releases at Solutia
- Air Modeling of Potential Historical Releases at Solutia, Inc. W.G. Krummrich Plant, Sauget, Illinois (PDF) (57pp, 2MB) January 2011
- Air Modeling Report Figures 1 to 11 (PDF) (11pp, 4MB) Map
- Air Modeling Report Figure 12 (PDF) (1pg, 421K) Map
- FCSA Dust Re-Suspension - Appendix A
- Soil Map-St Clair County (PDF) (3pp, 926K)
- Appendix A thru E (Metdata and AERMET Processing Files, Depostion Modeling Input and Output Files, Metdata Q/A Analysis, and Soil Concentration Parameters) are available at Region 5 only.
Public Meetings
- EPA accepted comments on the site from August 24 - October 9, 2007.
![[logo] US EPA](http://www.epa.gov/epafiles/images/logo_epaseal.gif)