November 2005

Excavation of impacted soils at Area 14.

Excavation of impacted soils at Area 14.

Brick catch basin uncovered along east side of Area 11.

Brick catch basin uncovered along east side of Area 11.

Excavation of impacted soils at Area 6.

Excavation of impacted soils at Area 6.

Excavation Area 6.

Excavation Area 6.

Backfilling excavation at Area 6.

Backfilling excavation at Area 6.

Tank found in underground vault at the FMB.

Tank found in underground vault at the FMB.

Tank found in underground vault at the FMB.

Tank found in underground vault at the FMB.

Tank found in underground vault at the FMB.

Tank found in underground vault at the FMB.

October 2005

excavator and pond 2

A long reach excavator solidifies sediments taken from Pond 2 (a former wastewater treatment plant pond located at the north side of the site).

manufacturing building demolition

Demolition of the manufacturing building begins by removing the exterior sheet metal.

sediments,vegetation removal pond3

Excavators remove sediments and vegetation from Pond 3.

backfill pond 3

Contractors backfill Pond 3 after removing sediments.

pond 2 backfill completion

Pond 2 has been backfilled after the solidification and removal of all sediments.

building being demolished

Bringing down a section of building using an excavator with a grappling attachment.

material removal

The roof and steel material has been removed from the high wall area of the building.

segregated debris

Piles of segregated demolition debris staged for later disposal.

demolition continued

Continued demolition of the former manufacturing building.

dust control with water

Wetting the area down for dust control purposes during demolition activities