July 27, 2015

EPA contractors entering the manhole

Completing sheet pile installation at M7179

7/27/15

EPA contractors entering the manhole

Installation of bracing (L1)

7/28/15

EPA contractors entering the manhole

Loading dump truck for disposal
7/28/15

EPA contractors entering the manhole

Saw cutting concrete at J01
7/28/15

July 13, 2015

EPA contractors entering the manhole

7179 Vaulted Manhole with two 12 inch catch basin connection. 7/13/15

EPA contractors entering the manhole

Sheet pile delivered to 7179.7/13/15

EPA contractors entering the manhole

Water diversion system from manhole 7178 to catch basin at intersection of Lakeland and Harper.
7/13/15

July 9, 2015

EPA contractors entering the manhole

EPA contractors entering the manhole – confined space entry. 7/9/15

EPA contractors entering the manhole

EPA contractors entering the manhole – confined space entry. 7/9/15

July 2, 2015

Air monitoring stations established 7/2/15

Fence installation around work area for manhole vault 7179 7/2/15

July 1, 2015

Chapoton Basin-Completed decontamination area 7/1/15

June 24-26, 2015

Work Area on Bon Brae St. west of Harper Ave

Laydown Area at Chapaton Basin 1

Traffic Signage approach to work area on Harper Ave

June 2015

Decon pad liner materials

 

Revere Street Canal

Time-Critical Removal Action in progress

Time-Critical Removal Action at completion

Taking a soft sediment thickness reading

Ponar being dropped into the water

Core sample before processing

 

Processing a core sample

EPA overseeing work.