Jump to main content.


Photo Archive 8 - Constructing the New Channel (2004)

Wood chipping in new channel area of Segment 3.

Wood chipping in new channel area of Segment 3. (June 2004)

surveyor checks the elevation of the new streambed

A surveyor checks the elevation of the new streambed during new channel excavation in Segment 3. (June 2004)

unloading excavated material

A hauler unloads excavated material from the new channel while a bulldozer pushes material to a transfer station in Segment 3. (June 2004)

erosion control mat and woody debris in new channel

An erosion control mat and woody debris have been placed in the new channel in Segment 3. (June 2004)

removing woody debris

A backhoe removes woody debris near the new channel in Segment 3. (July 2004)

Cleanup in Region 5 | EPA Cleanup Home | Search CERCLIS database | Search NPL database


Local Navigation


Jump to main content.