Photo Archive 9 - Fall 2004

Concrete barricades surround soil piled in the wetlands in segment 2.

Concrete barricades surround soil piled in the wetlands in Segment 2. These barricades, along with 10-15 feet of plastic, will keep the piles in place. A silt fence made of plastic has also been placed around the edge of the piles as an extra safety measure. (July 2004)

Completed new channel in Segment 3.

Completed new channel in Segment 3. (July 2004)

worker stirring sediment

A worker stirs sediment in segment 2 to find a sheen of PAH contamination north of Good Hope Road. (August 2004)

filling abandoned channel

A backhoe shovels clean soil into the abandoned channel while a bulldozer (in the background) levels the newly filled-in channel in segment 2. (September 2004)

excavating re-use section streambed

A backhoe digs out part of the old channel that will continue to be used due to the crossover of segments 2 and 3 north of the Calumet Bridge. (September 2004)