Sauget Area 1
Site Information
- Sauget, IL (St. Clair County)
- EPA ID# ILD980792006
- Alias(es): N/A
- Sauget Area 1 Map with names of companies
Contact Information
Community Involvement Coordinator
Patricia Krause (krause.patricia@epa.gov)
312-886-9506 or 800-621-8431, ext. 69506, 9 a.m. - 4:30 p.m. CST
Remedial Project Manager
Leah Evison(evison.leah@epa.gov)
312-886-2064 or 800-621-8431, ext. 62064
Repositories
(where to view written records)
Cahokia Public Library
140 Cahokia Park Drive
Cahokia, IL
Links
EPA Superfund Home Page
Region 5 Superfund
Superfund glossary
Superfund Frequent Questions:
Superfund Information Systems Frequent Questions
Background
Cleanup at the Sauget Area 1 site is being addressed by short-term removal actions and a long-term cleanup phase that focuses on cleaning up the entire site. The long-term cleanup phase requires a remedial investigation and feasibility study (RI/FS). This is a study of the nature and extent of contamination (RI) and a description of potential cleanup alternatives (FS). The RI/FS is being reviewed to include added studies and investigations and should be submitted to EPA for review in 2009.
Sauget Area 1 is made up of 12 contaminant sources that include Segments A-F of Dead Creek and adjacent sites G, H, I, L, M and N. Sites G, H, and I are inactive landfills or former disposal areas next to the creek. Site L was used by waste haulers to dispose wash water and sites M and N are former sand pits. Check out the map of Sauget Area 1 and 2 that highlights each source within the areas along with the names of companies that at one time operated in the areas.
Short-term cleanup performed at the sites included:
- Removing 22,000 cubic yards of contaminated creek sediment (mud) from Dead Creek.
- Consolidating waste and placing soil cover over the Site G landfill after an underground fire.
- Replacing certain culverts in Dead Creek that act as backup points for flood waters on the creek.
- Digging up 50,000 cubic yards of contaminated sediment from Dead Creek Segment B-F, Site M and the basin area.
- Pumping water in areas of Dead Creek to improve drainage and lessen standing water.
- Placing a liner in creek segment B.
Site Updates || Technical Documents || Legal Agreements |
You will need the free Adobe Reader to view some of the files on this page. See EPA's PDF page to learn more.
Site Updates
April 2009
Soil removal at Dead Creek is complete. The next step is for EPA to review and propose a cleanup plan based on the revised remedial investigation/feasibility study, a study of the nature and extent of contamination and an evaluation of cleanup options at the site. Before the proposed cleanup plan is final the public will have an opportunity to comment either at a public meeting, on the web, or in writing.
Technical Documents
- Dead Creek - final remedy (PDF) (223pp, 6.2MB) April 2006
- Engineering Evaluation/Cost Analysis, Remedial (PDF) (518pp, 27.6MB) July 2002
Legal Agreements
- Adminstrative Order directing compliance with request for access, May 7, 2004 (PDF) (28pp, 937K) May 2004
- Administrative Order on Consent, January 12, 1999 (PDF) (53pp, 2.9MB) January 1999