Site Description
The 80-acre Reilly Tar & Chemical Corporation/St. Louis Park Plant site, in Hennepin County, Minnesota, is an active facility that was used for coal tar distillation and wood preserving from 1917 to 1972. The site was sold and converted into recreational and residential areas in 1972. Wastes from site operations were disposed of on the site and in a network of ditches that discharged to an adjacent wetland. The wastes generated at the site were predominantly polynuclear aromatic hydrocarbons (PNAs). Soil and groundwater beneath the site are contaminated. Approximately 43,000 people use the groundwater from the aquifers, contaminated by the site. Portions of the northern end of the site have been developed as a residential complex. From 1978 to 1981, seven municipal wells were closed due to contamination.Site Responsibility
This site is being addressed through federal, state, municipal, and potentially responsible parties' actions.Threats and Contaminants
The wastes generated at the site were predominantly PNAs. Soil and groundwater beneath the site are contaminated.Cleanup Progress
In 1982, the United States Environmental Protection Agency (U.S. EPA) provided funds to the Minnesota Pollution Control Agency (MPCA) to clean out two contaminated wells which had been used for disposal of site wastes. In 1984, a consent order was issued, requiring Reilly Tar, the potentially responsible party (PRP) as owner and operator of the site, to
1) construct a granular-activated carbon treatment plant for two existing contaminated municipal wells,
2) restore drinking water, and
3) contain the contaminant plume from contaminating other municipal wells.
The granular activated carbon treatment plant was completed in 1986. A consent decree (CD) was subsequently signed by the PRPs, U.S. EPA, and MPCA in September 1986. In 1986 and 1987, a number of pumping wells were constructed in the various groundwater aquifers beneath the site to remove the contaminant sources and to contain the spread of the contaminant plume. Another granular activated carbon treatment plant was completed in 1993 to allow a municipal well to be used for containment of the contaminant plume. Two additional pumping wells were also completed in 1991 and 1995.
An additional pumping well was constructed in summer 1997. Construction at the site is now complete, and a preliminary close-out report was issued on June 30, 1997.
A five-year review was conducted in September 2001 to assure continued protectiveness of the remedial actions of the site. The five-year review concluded that the site remedy was currently protective of human health and the environment. The five-year review recommended that additional groundwater monitoring and groundwater modeling be performed to assure long-term protectiveness of the groundwater pumping wells in containing the contaminant plume. The effectiveness of the groundwater pumping wells was evaluated in the third five year review for the site which was completed on September 28, 2006.
A major park improvement project was completed at the site by the city of St. Louis Park in summer 2002.
Property Reuse
Several townhomes and apartment buildings were constructed on-site in the 1970's. More recently, a major park improvement project was completed in 2002, a commercial building was constructed in 2004 and a road improvement project was completed in 2004. A construction plan for each project was reviewed by the Agencies to assure that activities were conducted in a safe and environmentally appropriate manner.Contacts
Remedial Project Manager, U.S. EPAmatthew ohl (ohl.matthew@epa.gov)
(312) 886-4442
Community Involvement Coordinator, U.S. EPA
stuart hill
(312) 886-0689
Aliases
REILLY TAR & CHEM ST LOUIS PARKREILLY TAR & CHEM REPUBLIC CREOSOTING CO
REILLY TAR&CHEM (ST. LOUIS PARK PLANT)
![[logo] US EPA](http://www.epa.gov/epafiles/images/logo_epaseal.gif)