Site Description

The Old American Zinc Plant Site is a 132-acre inactive industrial facility in Fairmont City, Illinois, located along Kingshighway, just north of East St. Louis. Areas near the site are industrial and residential.  Except for a few large slag piles, a soil stockpile, and a creek, most of the on-site property is flat.  Crushed limestone has been placed over the slag (a waste product of smelting furnaces previously operating on-site) in many locations to construct roadways and parking areas.  Sparse vegetation over most of the property consists mainly of moss patches, but wetland plants grow along the course of a creek and in a poorly drained, low lying area in the southeast corner of the property.

From 1913 until 1967, American Zinc operated a zinc smelter facility on the site. In 1967, American Zinc moved to Sauget, Illinois.  At this time, all structures were either moved, or torn down and disposed of off-site.  The site remained vacant until XTRA Intermodal, Inc. leased it in 1976 from American Zinc to use the site for a truck semi-trailer leasing and storage operation.  XTRA then purchased the site property in 1979.  In 2003, the company discontinued its operations, and the site is currently vacant.  In early 2007, XTRA plans to demolish its remaining buildings on the site and remove the debris.

In 1994, U.S. EPA tasked the Illinois Environmental Protection Agency (IL EPA) to conduct an Integrated Site Assessment (ISA).  Groundwater migration was not thought to be a concern because most drinking water wells are located more than three miles from the contamination and are upgradient.  Site surface water flows through small drainageways into a large wetland area.  No contaminant airborne release was observed during the ISA, although residents complained of particulates blowing off-site.  IL EPA took numerous soil samples from residential and other surrounding areas, and analyzed the samples.  Many of these samples showed arsenic, cadmium, lead, and zinc at elevated levels.  IL EPA also took waste samples on-site and sediment samples on and near the site. The on-site waste samples indicated methylene-chloride, semi-volatile, inorganic, and pesticide contamination.  Sediment samples from creeks and wetlands indicated mostly inorganic contamination.

Site Responsibility

U.S. EPA has successfully negotiated with potentially responsible parties ((PRP) parties whom EPA has determined may be legally responsible for the site's contamination) for them to perform a Remedial Investigation (a study of the nature and extent of site contamination) and Feasibility Study (an evaluation of site cleanup alternatives) (RI/FS) of the site and surrounding areas.

Threats and Contaminants

Soil within the 132-acre site contains semi-volatile, inorganic, and pesticide contaminants.  Sediments from nearby creeks and wetlands contain mostly inorganic contamination.  The threats related to groundwater, surface water, and soil pathways have not yet been quantified.

Cleanup Progress

At the end of 1998, U.S. EPA agreed to accept cleanup authority for the site from IL EPA.  In November 1999, U.S. EPA and its removal contractor took on-site slag samples, creek sediment samples, and nearby, residential soil samples.  The sediment sampling results showed high levels of arsenic, cadmium, lead, mercury, and zinc.  The on-site slag sampling results showed high levels of arsenic, zinc, cadmium, and lead.  A residential soil sampling result showed high levels of cadmium and lead.

On March 22, 2002 , U.S. EPA and a PRP agreed to an Administrative Order on Consent ((AOC) a legal agreement ) for the PRP to perform a non-time-critical Removal Action of contaminated soils of residential, commercial, and industrial properties near the 132-acre property.  The PRP contractor mobilized at the site in June 2002 and completed the activities by June 2004.

The contractor sampled soils from 462 properties near the 132-acre site, of which 339 were residential properties.  The contractor excavated contaminated soil from 152 properties, backfilled the properties with clean soil, and revegetated the properties.  The contractor placed the contaminated soils onto a soil stockpile within the 132-acre site, and stabilized and vegetated the pile to eliminate human health risks due to dermal contact, ingestion, and inhalation.

U.S. EPA and PRPs entered into an AOC on June 6, 2005 for the PRPs to perform an RI/FS of the site and surrounding areas.  The PRP has completed the majority of the RI field sampling, with a final round to occur no later than early 2008.  The RI will include a risk assessment to identify exposure pathways and evaluate human health and ecological risks from site contamination.  The FS will evaluate alternatives to cleanup the 132 acres (including the soil stockpile) and surrounding areas that are contaminated.  On the same day that U.S. EPA issued the AOC, U.S. EPA issued a Unilateral Administrative Order to another PRP to perform and/or finance the RI/FS.  The PRP has given its written notice of intent to comply.

Congressional Interest

U.S. EPA has been working with Congressman Costello's office and the Village of Fairmont City to keep communication open between the Village and U.S. EPA, and answer concerns expressed by the Village about cleanup activities to date. 

Contacts

Remedial Project Manager, U.S. EPA
ronald murawski (murawski.ronald@epa.gov)
(312) 886-2940

 

 