Quarterly Reports
Quarterly Progress Report RCRA Docket No. VII-89-H-0028 Sugar
Creek, Missouri July 2, 2002. This document summarizes the
quarterly ground-water sampling and other interim-measures monitoring
conducted at the site during the previous quarter. 1 CD set
Quarterly Progress Report RCRA Docket No. VII-89-H-0028 Sugar
Creek, Missouri October 8, 2002. This document summarizes
the quarterly ground-water sampling and other interim-measures
monitoring conducted at the site during the previous quarter.
1 CD set
Quarterly Progress Report RCRA Docket No.VII-89-H-0028 Sugar
Creek, Missouri, January 9, 2003. This document summarizes
the quarterly ground-water sampling and other interim-measures
monitoring conducted at the site during the previous quarter.
1 CD set
Quarterly Progress Report RCRA Docket No. VII-89-H-0028, Sugar
Creek, Missouri, April 4, 2003. This document summarizes the
quarterly ground-water sampling and other interim-measures monitoring
conducted at the site during the previous quarter. 1CD set.
Quarterly Progress Report RCRA Docket No.VII-89-H-0028 Sugar
Creek, Missouri, July 7, 2003. This document summarizes the
quarterly ground-water sampling and other interim-measures monitoring
conducted at the site during the previous quarter. 1 CD set
Work Plans
West Hills Tank Area Investigation Work Plan, Sugar Creek,
Missouri, June 5, 2002.
This document has been approved. This draft document presents
the proposed sampling and analyses to be conducted during the
investigation of the West Hills Tank Area. 1 CD set
Norgaard Tank Area Investigation Work Plan, Sugar Creek,
Missouri, March 22, 2002. This document has been approved
based upon the response to agency comments. This draft document
presents the proposed sampling and analyses to be conducted
during the investigation of the Norgaard Tank Area. 1 CD set
Sugar Creek Area Investigation Work Plan, Sugar Creek, Missouri,
May 18, 2001. This document has been reviewed and approved
This draft document presents the proposed sampling and analyses
to be conducted during the investigation of the Sugar Creek
Corridor Area. 1 CD set
West Plant Process Area Work Plan, Sugar Creek, Missouri, November
22, 2002. This document is under review. This draft document
presents the proposed sampling and analyses to be conducted during
investigation of the West Plant Process Area. 1 CD set
Lower Refinery & East Bluffs Area Investigation Work Plan,
Sugar Creek, MO March 7, 2003. This document is being reviewed.
This draft document presents the proposed sampling and analyses
to be conducted during the investigation of the Lower Refinery
and East Bluffs areas. 1CD set.
RFI Reports
Volume 3 Crawford Area RCRA Facility Investigation Report, Sugar
Creek, Missouri, December 19, 2001.
This document has been reviewed. This draft document summarizes the results of the investigation in the Crawford Area.
The investigation included the collection of groundwater and soil samples and an investigation of the subsurface piping in the Crawford
Area. Also included in the document is a risk assessment for the Crawford Area. Set of 4 CD's
Revised Volume 3 Crawford Area RCRA Facility Investigation
Report, Sugar Creek, Missouri, October 28, 2002.
This document is under review. This document has been revised
based on MDNR and EPA comments and has been resubmitted for review
and approval. 1 CD set
Volume 4 Sugar Creek Area RCRA Facility Investigation Report, Sugar Creek, Missouri, February 22, 2002.
This document has been reviewed. This draft document summarizes
the results of the investigation along the Sugar Creek (creek)
corridor from it's confluence with the Missouri River to just
south of where Sugar Creek (creek) enters the site at Norledge
Avenue. The document also summarizes data from the construction
debris landfill which was included as part of this investigation.
Also included in the document are human and ecological risk assessments.
1 CD set
Volume 4 Sugar Creek Area RCRA Facility Investigation Report,
Sugar Creek, Missouri March 3, 2003 - Revised This
document is under review. This document summarizes the results
of the investigation in the Sugar Creek Area and is a revision
of the original document. The revision is based on comments developed
by the Missouri Department of Natural Resources. 1CD set.
Volume 5 West Bluffs Area RCRA Facility Investigation Report, Sugar Creek, Missouri, May 13, 2002.
This document is under review. This draft document summarizes the results of the investigation in the
West Bluffs Area. The investigation included the collection of groundwater and soil samples and an investigation of the subsurface piping in the
West Bluffs Area. Also included in the document are risk assessments for human and ecological risk in the West Bluffs Area. 1 CD set
Volume 5 West Bluffs Area RCRA Facility Investigation Report,
Sugar Creek, Missouri February 14, 2003 - Revised This
document is under review. This document summarizes the results
of the investigation in the West Bluffs Area and is a revision
of the original document. The revision is based on comments developed
by the Missouri Department of Natural Resources. 1CD set.
Volume 6 Norgaard Tank Area RCRA Facility Investigation
Report, Sugar Creek, Missouri, December 20, 2002
This document is under review. This draft document summarizes
the results of the investigation in the Norgaard Tank Area. The
investigation included the collection of ground-water and soil
samples and an investigation of the subsurface piping in the Norgaard
Tank Area. Also included in the document are risk assessment for
human and ecological risk. 1 CD set.
Volume 7 West Hills Tank Area RCRA Facility Investigation Report, Sugar Creek, Missouri April 22, 2003
This document is under review. This draft document summarizes
the results of the investigation in the West Hills Tank Area.
The investigation included the collection of ground-water and
soil samples and an investigation of the subsurface piping in
the West Bluffs Area. Also included in the document is a risk
assessment for human health. 1CD set.
Corrective Measures Studies
Corrective Measures Study for the Crawford and Sugar Creek
Areas August 26, 2002 This document is under review. This
draft document presents the proposed corrective measures for the
Crawford and Sugar Creek Areas on the former refinery site. 1
CD set
Corrective Measures Study Norledge Area Addendum Phase 2 Redesign, Sugar Creek, Missouri, May 31, 2002.
This document is under review. This draft document summarizes
the corrective measures proposed for the off-site Norledge Area.
This document represents an addendum to the original corrective
measures study.1 CD set
Interim Measures Reports
Annual Interim Measures Performance Monitoring Summary - 2001,
Sugar Creek, Missouri, April 19, 2002. This document summarizes
the historical performance of the existing Interim Measures (IM)
which are implemented at the site. The document includes maps
which show the location of the IM's and summaries of performance
data. 1 CD set
Phase 1 Performance Monitoring Report Total Fluids Extraction System, Norledge Area, Sugar Creek, Missouri
June 30, 2003
This document summarizes the results of monitoring of the Phase 1 Total Fluids Extraction System in the Norledge
area. 1 CD set.