Draft Title V Permit to Operate: Deseret Power Electric Cooperative Bonanza Power Plant
This page contains the draft operating permit, Statement of Basis, public notice, supporting documentation, and substantive public comments received on the draft permit for the Deseret Power Electric Cooperative Bonanza Power Plant, located within the exterior boundaries of the Uintah and Ouray Indian Reservation in Uintah County, Utah. The public comment period for this draft permit ended at 5:00 PM MST on June 16, 2014. A public hearing was held on June 3, 2014 at the Ute Tribal Auditorium in Fort Duchesne, Utah (see public notice for more information). In addition to the comments posted below, we received more than 2,000 comments from individuals and other entities. We have included below an example of a form email for which we received over 1,800 identical emails.
The final permit was issued on December 5, 2014. This page is being maintained for informational purposes only.
- Public Notice (pdf)
- Statement of Basis (pdf)
- Draft Permit (pdf)
- Supporting Information (56 documents) (pdf)
- Comments from Deseret Generation & Transmission Co-operative (pdf)
- Comments from Wild Earth Guardians (pdf)
- Comments from the Ute Indian Tribe (pdf)
- Comments from Sierra Club (pdf)
- Comments from Earth Justice (pdf)
- Comments from US National Park Service (pdf)
- June 3, 2014 Public Hearing Transcripts (pdf)
- Example Form Comment from Wild Earth Guardians Supporters (over 1,800 identical comments received) (pdf)
- Comments Hand Delivered at June 3, 2014 Public Hearing (pdf)
- Comments Submitted by Fax (pdf)
- Comments Submitted by Mail (pdf)
- Comments Submitted by Email from Business, Organization, or Government Entities (pdf)