Army Corps of Engineers
The Corps of Engineers
manages the planning, designing, building and operating water resources and other civil works projects (Navigation, Flood Control, Environmental Protection, Disaster Response, etc.). The Corps of Engineers is also in charge of the Clean Water Act (CWA) Section 404 permits for authorized discharge of sediment into waters of the U.S., including wetlands. In addition to our commenting role, EPA has oversight of the CWA, Section 404 program. For additional information on Region 9's review of Corps projects, contact Carol Sachs at (415) 972-3860 or sachs.carol@epa.gov.
You will need Adobe Reader to view some of the files on this page. See EPA's PDF page to learn more about PDF, and for a link to the free Adobe Reader.
- Berths 97-109 Terminal Improvement Project, Port of Los Angeles DEIS (PDF), 10/16/06 (5 pp, 27K)
- Berths 136-147 (Tra-Pac) Terminal Improvement Project in the Port of Los Angeles DEIS (PDF), 9/26/07 (7 pp, 37K)
- Berths 136-147 (Tra-Pac) Terminal Improvement Project in the Port of Los Angeles FEIS (PDF), 12/28/07 (7 pp, 41K)
- American River Watershed Project & Folsom Dam Raise, 3rd Draft Supplement (PDF), 6/21/06 (2 pp, 24K)
- Cajon Third Main Track DEIS (PDF), 1/4/07 (13 pp, 72K)
- Cajon Third Main Track FEIS (PDF), 4/6/07 (6 pp, 34K)
- Feather River Levee Repair Project, DEIS (PDF), 8/25/08 (5 pp, 31K)
- Hemet/San Jacinto Integrated Recharge and Recovery Program DEIS (PDF), 11/2/06 (12 pp, 67K)
- Hemet/San Jacinto Integrated Recharge and Recovery Program FEIS (PDF), 5/9/07 (3 pp, 28K)
- Los Angeles River Revitalization Master Plan DEIS (PDF) 3/26/07 (6 pp, 42K)
No formal letter was sent to the preparing agency on the FEIS because the DEIS was rated LO, the preferred alternative did not change, and our comments were adequately addressed. - Los Banos Bypass Project, CA-152 FEIS (PDF) 9/4/07 (3 pp, 33K)
- Master Plan for Deep-Draft Wharf and Fill Improvements at Apra Harbor, Guam, Mariana Islands DEIS (PDF) 10/15/07 (8 pp, 58K)
- Mayhew Levee Raise, Lower American River Common Features Project DEIS (PDF) 12/22/05 (4 pp, 25K)
No formal comment letter was sent to the preparing agency on the FEIS.
- Natomas Levee Improvement Project, DEIS (PDF) 8/4/08 (7 pp, 50K)
- Pacific L.A. Marine Terminal LLC Pier 400, Berth 408 Project, SDEIS (PDF), 8/20/08 (13 pp, 83K)
- Port of Long Beach Middle Harbor Redevelopment Project, DEIS (PDF), 8/8/08 (14 pp, 86K)
- Port of Los Angeles Channel Deepening Project, DEIS (PDF), 8/29/08 (11 pp, 68K)
- Prado Flood Control Basin Master Plan Project DEIS (PDF), 1/27/06 (3 pp, 20K)
- Rio del Oro Specific Plan Project DEIS (PDF), 2/15/07 (10 pp, 66K)
- Rio del Oro Specific Plan Project SDEIS (PDF), 7/11/08 (8 pp, 51K)
- Rio Salado Oeste Feasibility Study Report DEIS (PDF), 6/9/06 (2 pp, 18K)
No formal letter was sent to the preparing agency on the FEIS because [1] the DEIS was rated LO, [2] the preferred alternative did not change, and [3] our comments were adequately addressed. 12/20/06
- San Clemente Dam Seismic Retrofit Project DEIS
(PDF) 6/28/06 (24 pp, 25K)
No formal letter was sent to the preparing agency on the FEIS because the DEIS was rated LO, the preferred alternative did not change, and our comments were adequately addressed.
- San Diego Creek Special Area Management Plan DEIS (PDF), 4/21/08 (5 pp, 31K)
- San Juan Creek and Western San Mateo Creek Watershed Special Area Management Plan DEIS (PDF), 1/27/06 (12 pp, 57K)
San Juan Creek and Western San Mateo Creek Watershed Special Area Management Plan FEIS (PDF), 2/12/07 (5 pp, 77K)
- San Luis Obispo Creek Watershed Waterway Management Plan FEIS (PDF), 8/13/07 (1 pp, 55K)
- San Luis Rey Flood Control Project, Operation and Maintenance of the Vegetation and Sediment Management DSEIS (PDF), 12/18/06 (7 pp, 34K)
No formal comment letter was sent to the preparing agency on the FEIS.
- San Vicente Dam Raise Project & Carryover Storage DEIS (PDF), 10/9/07 (6 pp, 35K)
San Vicente Dam Raise Project & Carryover Storage FEIS (PDF), 5/19/08 (7 pp, 45K)
- Santa Ana River Interceptor Protection/Relocation Project DEIS (PDF), 4/28/08 (7pp, 45K)
- Success Dam Seismic Remediation Dam Safety Project DEIS (PDF), 1/5/07 (3 pp, 28K)