Satellite Training
Stage 1 Disinfectants & Disinfection Byproducts Rule
Training by Satellite Broadcast - May 18, 2004 The Environmental Protection
Agency conducted a training of the Stage 1 Disinfectants and Disinfection
Byproducts Rule (Stage 1 DBPR) transmitted by satellite broadcast to designated
downlink sites throughout the nation. The broadcast took place on May
18th, 2004.
This broadcast was developed for state, tribal, local water utility personnel, and technical assistance providers active in the drinking water program. If you have any questions regarding the satellite training, please contact Holly Fleming at (202) 564-9909 or fleming.holly@epa.gov.
Training Overview
The training session presented a quick overview of how to comply with
the chlorine, chloramines, Total Trihalomethanes (TTHM), and Haloacetic
Acids (HAA5) requirements of the Stage 1 DBPR. The training session also
included a discussion of the Step 1 requirements for DBPPs.
The training covered:
- The rule and the reasons for it.
- Monitoring plans.
- Reporting requirements.
- Relevant simultaneous compliance issues.
- Compliance with the disinfection byproduct precursor Step 1 TOC removal requirements.
- Compliance through alternative compliance criteria.
The training did not cover:
- Step 2 TOC removal requirements.
- Requirements of the Stage 1 DBPR relating to the use of ozone.
- Requirements of the Stage 1 DBPR relating to the use of chlorine dioxide.
The training session was followed by an expert panel discussion. Panelists discussed questions submitted by the audience at the downlink sites (44 KB PDF File, 6pgs) . See below for the training materials.
Training agenda and materials:
All materials are provided in Adobe Acrobat fomat .
- Agenda (25 K PDF File, 1pg)
- Introduction (1850 K PDF File, 2pgs)
- Chlorine & Chloramines (270 K PDF File, 3pgs)
- Chlorine & Chloramines Workshop (221 K PDF File, 2pgs)
- TTHM & HAA5 (1040 K PDF File, 6pgs)
- TTHM & HAA5 Workshop (216 K PDF File, 4pgs)
- Reporting and Planning (107 K PDF File, 2pgs)
- Reporting and Planning Workshop (299 K PDF File, 2pgs)
- DBP Precursors (285 K PDF File, 7pgs)
- DBP Precursors Workshop (112 K PDF File, 1pg)
- Other Compliance Issues (1400 K PDF File, 2pgs)
- Conclusion (1160 K PDF File, 2pgs)
Click on the links below for more information about the rule:
![[logo] US EPA](http://www.epa.gov/epafiles/images/logo_epaseal.gif)