Jump to main content.


Federal Register Notice

15594 - 15598 Federal Register / Vol. 62, No. 62 / Tuesday, April 1, 1997 / Proposed Rules

horizontal navy line

15594 - 15598 Federal Register / Vol. 62, No. 62 / Tuesday, April 1, 1997 / Proposed Rules

ENVIRONMENTAL PROTECTION AGENCY

40 CFR Part 300
[FRL-5805-3]

National Priorities List for Uncontrolled Hazardous Waste Sites, Proposed Rule No. 22

AGENCY: Environmental Protection Agency.
ACTION:  Proposed rule.

SUMMARY:

The Comprehensive Environmental Response, Compensation, and Liability Act of 1980 ("CERCLA" or "the Act"), as amended, requires that the National Oil and Hazardous Substances Pollution Contingency Plan ("NCP") include a list of national priorities among the known releases or threatened releases of hazardous substances, pollutants, or contaminants throughout the United States. The National Priorities List ("NPL") constitutes this list.

This rule proposes to add 6 new sites to the NPL, 5 to the General Superfund Section and 1 to the Federal Facilities section. This rule also withdraws one site from proposal to the NPL. The NPL is intended primarily to guide the Environmental Protection Agency ("EPA" or "the Agency") in determining which sites warrant further investigation to assess the nature and extent of public health and environmental risks associated with the site and to determine what CERCLA-financed remedial action(s), if any, may be appropriate.

DATES:

Comments must be submitted (postmarked) on or before June 2, 1997.

[Return to Table of Contents]

ADDRESSES:

By Mail: Mail original and three copies of comments (no facsimiles or tapes) to:

Docket Coordinator
Headquarters, U.S. EPA
CERCLA Docket Office, (Mail Code 5201G)
401 M Street, SW.
Washington, DC 20460
703/603-8917

By Federal Express: Send original and three copies of comments (no facsimiles or tapes) to:

Docket Coordinator
Headquarters, U.S. EPA
CERCLA Docket Office
1235 Jefferson Davis Highway
Crystal Gateway #1, First Floor
Arlington, VA 22202

By E-Mail: Comments in ASCII format only may be mailed directly to:

superfund.docket@epamail.epa.gov.

E-mailed comments must be followed up by an original and three copies sent by mail or Federal Express.

For additional Docket addresses and further details on their contents, see Section I of the "SUPPLEMENTARY INFORMATION" portion of this preamble.

FOR FURTHER INFORMATION CONTACT:

Terry Keidan
State and Site Identification Center
Office of Superfund Remediation Technology Innovation (Mail Code 5204G)
U.S. Environmental Protection Agency
401 M Street, SW.
Washington, DC 20460
or the Superfund Hotline, Phone (800) 424-9346 or (703) 412-9810 in the Washington, DC metropolitan area.

SUPPLEMENTARY INFORMATION:

I. Introduction
II. Pupose and Implementation of the NPL
III. Executive Order 12866
IV. Unfunded Mandates
V. Effect on Small Businesses

[Return to Table of Contents]

I. Introduction

Background

In 1980, Congress enacted the Comprehensive Environmental Response, Compensation, and Liability Act, 42 U.S.C. 9601-9675 ("CERCLA" or "the Act"), in response to the dangers of uncontrolled hazardous waste sites. CERCLA was amended on October 17, 1986, by the Superfund Amendments and Reauthorization Act ("SARA"), Public Law No. 99-499, 100, Stat. 1613 et seq. To implement CERCLA, EPA promulgated the revised National Oil and Hazardous Substances Pollution Contingency Plan ("NCP"), 40 CFR Part 300, on July 16, 1982 (47 FR 31180), pursuant to CERCLA section 105 and Executive Order 12316 (46 FR 42237, August 20, 1981). The NCP sets forth the guidelines and procedures needed to respond under CERCLA to releases and threatened releases of hazardous substances, pollutants, or contaminants. EPA has revised the NCP on several occasions. The most recent comprehensive revision was on March 8, 1990 (55 FR 8666).

Section 105(a)(8)(A) of CERCLA requires that the NCP include "criteria for determining priorities among releases or threatened releases throughout the United States for the purpose of taking remedial action and, to the extent practicable taking into account the potential urgency of such action, for the purpose of taking removal action." "Removal" actions are defined broadly and include a wide range of actions taken to study, clean up, prevent or otherwise address releases and threatened releases. 42 U.S.C. 9601(23). "Remedial actions" are those "consistent with permanent remedy, taken instead of or in addition to removal actions * * *." 42 U.S.C. 9601(24).

Pursuant to section 105(a)(8)(B) of CERCLA, as amended by SARA, EPA has promulgated a list of national priorities among the known or threatened releases of hazardous substances, pollutants, or contaminants throughout the United States. That list, which is Appendix B of 40 CFR Part 300, is the National Priorities List ("NPL").

CERCLA section 105(a)(8)(B) defines the NPL as a list of "releases" and as a list of the highest priority "facilities." CERCLA section 105(a)(8)(B) also requires that the NPL be revised at least annually. A site may undergo remedial action financed by the Trust Fund established under CERCLA (commonly referred to as the "Superfund") only after it is placed on the NPL, as provided in the NCP at 40 CFR 300.425(b)(1). However, under 40 CFR 300.425(b)(2) placing a site on the NPL "does not imply that monies will be expended". EPA may pursue other appropriate authorities to remedy the releases, including enforcement action under CERCLA and other laws. Further, the NPL is only of limited significance, as it does not assign liability to any party or to the owner of any specific property. See Report of the Senate Committee on Environment and Public Works, Senate Rep. No. 96-848, 96th Cong., 2d Sess. 60 (1980), 48 FR 40659 (September 8, 1983).

Three mechanisms for placing sites on the NPL for possible remedial action are included in the NCP at 40 CFR 300.425(c). Under 40 CFR 300.425(c)(1), a site may be included on the NPL if it scores sufficiently high on the Hazard Ranking System ("HRS"), which EPA promulgated as Appendix A of 40 CFR Part 300. On December 14, 1990 (55 FR 51532), EPA promulgated revisions to the HRS partly in response to CERCLA section 105(c), added by SARA. The revised HRS evaluates four pathways: Ground water, surface water, soil exposure, and air. The HRS serves as a screening device to evaluate the relative potential of uncontrolled hazardous substances to pose a threat to human health or the environment. As a matter of Agency policy, those sites that score 28.50 or greater on the HRS are eligible for the NPL.

Under a second mechanism for adding sites to the NPL, each State may designate a single site as its top priority, regardless of the HRS score. This mechanism, provided by the NCP at 40 CFR 300.425(c)(2) requires that, to the extent practicable, the NPL include within the 100 highest priorities, one facility designated by each State representing the greatest danger to public health, welfare, or the environment among known facilities in the State (see 42 U.S.C. 9605(a)(8)(B)).

The third mechanism for listing, included in the NCP at 40 CFR 300.425(c)(3), allows certain sites to be listed regardless of their HRS score, if all of the following conditions are met:

EPA promulgated an original NPL of 406 sites on September 8, 1983 (48 FR 40658). The NPL has been expanded since then, most recently on December 23, 1996 (61 FR 67656).

The NPL includes two sections, one of sites that are evaluated and cleaned up by EPA (the "General Superfund Section"), and one of sites being addressed generally by other Federal agencies (the "Federal Facilities Section"). Under Executive Order 12580 (52 FR 2923, January 29, 1987) and CERCLA section 120, each Federal agency is responsible for carrying out most response actions at facilities under its own jurisdiction, custody, or control, although EPA is responsible for preparing an HRS score and determining whether the facility is placed on the NPL. EPA generally is not the lead agency at Federal Facilities Section sites, and its role at such sites is accordingly less extensive than at other sites.

Site Boundaries

The NPL does not describe releases in precise geographical terms; it would be neither feasible nor consistent with the limited purpose of the NPL (as the mere identification of releases), for it to do so.

CERCLA section 105(a)(8)(B) mandates listing of national priorities among the known "releases or threatened releases." The purpose of the NPL is merely to identify releases that are priorities for further evaluation. Although a CERCLA "facility"is broadly defined to include any area where a hazardous substance release has "come to be located" (CERCLA section 101(9)), the listing process itself is not intended to define or reflect the boundaries of such facilities or releases. Of course, HRS data upon which the NPL placement was based will, to some extent, describe which release is at issue. That is, the NPL site would include all releases evaluated as part of that HRS analysis.

When a site is listed, it is necessary to define the release (or releases) encompassed by the listing. The approach generally used is to delineate a geographical area (usually the area within an installation or plant boundaries) and identify the site by reference to that area. As a legal matter, the site is not coextensive with that area, and the boundaries of the installation or plant are not the "boundaries" of the site. Rather, the site consists of all contaminated areas within the area used to identify the site, as well as any other location to which contamination from that area has come to be located, or from which that contamination came.

In other words, while geographic terms are often used to designate the site (e.g., the "Jones Co. plant site") in terms of the property owned by a particular party, the site properly understood is not limited to that property (e.g., it may extend beyond the property due to contaminant migration), and conversely may not occupy the full extent of the property (e.g., where there are uncontaminated parts of the identified property, they may not be, strictly speaking, part of the "site"). The "site" is thus neither equal to nor confined by the boundaries of any specific property that may give the site its name, and the name itself should not be read to imply that this site is coextensive with the entire area within the property boundary of the installation or plant. The precise nature and extent of the site are typically not known at the time of listing. Also, the site name is merely used to help identify the geographic location of the contamination. For example, the "Jones Co. plant site," does not imply that the Jones company is responsible for the contamination located on the plant site.

EPA regulations provide that the "nature and extent of the threat presented by a release" will be determined by a Remedial Investigation/Feasibility Study (RI/FS) as more information is developed on site contamination (40 CFR 300.430(d)). During the RI/FS process, the release may be found to be larger or smaller than was originally thought, as more is learned about the source(s) and the migration of the contamination. However, this inquiry focuses on an evaluation of the threat posed; the boundaries of the release need not be exactly defined. Moreover, it generally is impossible to discover the full extent of where the contamination "has come to be located" before all necessary studies and remedial work are completed at a site. Indeed, the boundaries of the contamination can be expected to change over time. Thus, in most cases, it may be impossible to describe the boundaries of a release with absolute certainty.

Further, as noted above, NPL listing does not assign liability to any party or to the owner of any specific property. Thus, if a party does not believe it is liable for releases on discrete parcels of property, supporting information can be submitted to the Agency at any time after a party receives notice it is a potentially responsible party.

For these reasons, the NPL need not be amended as further research reveals more information about the location of the contamination or release.

Deletions/Cleanups

EPA may delete sites from the NPL where no further response is appropriate under Superfund, as explained in the NCP at 40 CFR 300.425(e). This section also provides that EPA shall consult with states on proposed deletions and shall consider whether any of the following criteria have been met:

To date, the Agency has deleted 139 sites from the NPL.

In November 1995, EPA initiated a new policy to delete portions of NPL sites where cleanup is complete (60 FR 55465, November 1, 1995). Total site cleanup may take many years, while portions of the site may have been cleaned up and available for productive use. As of March 1997, EPA has partially deleted 4 sites.

EPA also has developed an NPL construction completion list ("CCL") to simplify its system of categorizing sites and to better communicate the successful completion of cleanup activities (58 FR 12142, March 2, 1993). Sites qualify for the CCL when:

Inclusion of a site on the CCL Has No Legal Significance

In addition to the 132 sites that have been deleted from the NPL because they have been cleaned up (7 sites have been deleted based on deferral to other authorities and are not considered cleaned up), an additional 291 sites are also on the NPL CCL. Thus, as of March 1997, the CCL consists of 423 sites.

Public Comment Period

The documents that form the basis for EPA's evaluation and scoring of sites in this rule are contained in dockets located both at EPA Headquarters and in the appropriate Regional offices. The dockets are available for viewing, by appointment only, after the appearance of this rule. The hours of operation for the Headquarters docket are from 9:00 a.m. to 4:00 p.m., Monday through Friday excluding Federal holidays. Please contact individual Regional dockets for hours.

Docket Coordinator
Headquarters, U.S. EPA
CERCLA Docket Office
Crystal Gateway #1, 1st Floor
1235 Jefferson Davis Highway
Arlington, VA 22202
703/603-8917

(Please note this is a visiting address only. Mail comments to address listed in Addresses section above.)

Jim Kyed
Region 1
U.S. EPA Waste Management Records Center,HRC-CAN-7
J.F. Kennedy Federal Building
Boston, MA 02203-2211
617/573-9656

Ben Conetta
Region 2
U.S. EPA
290 Broadway
New York, NY 10007-1866
212/637-4435

Diane McCreary
Region 3
U.S. EPA Library, 3rd Floor
841 Chestnut Building
9th & Chestnut Streets
Philadelphia, PA 19107
215/566-5250

Kathy Piselli
Region 4
U.S. EPA
100 Alabama Street, SW
Atlanta, GA 30303
404/562-8190

Cathy Freeman
Region 5
U.S. EPA, Records Center, Waste Management Division 7-J
Metcalfe Federal Building
77 West Jackson Boulevard
Chicago, IL 60604
312/886-6214

Bart Canellas
Region 6
U.S. EPA
1445 Ross Avenue, Mail Code 6H1MA
Dallas, TX 75202-2733
214/655-6740

Carole Long
Region 7
U.S. EPA
726 Minnesota Avenue
Kansas City, KS 66101
913/551-7224

Pat Smith
Region 8
U.S. EPA
999 l8th Street, Suite 500
Denver, CO 80202-2466
303/312-6082

Carolyn Douglas
Region 9
U.S. EPA
75 Hawthorne Street
San Francisco, CA 94105
415/744-2343

David Bennett
Region 10
U.S. EPA, 11th Floor
1200 6th Avenue, Mail Stop HW-114
Seattle, WA 98101
206/553-2103

The Headquarters docket for this rule contains: HRS score sheets for each proposed site; a Documentation Record for each site describing the information used to compute the score; information for any site affected by particular statutory requirements or EPA listing policies; and a list of documents referenced in the Documentation Record.

The Headquarters docket also contains an "Additional Information" document which provides a general discussion of the statutory requirements affecting NPL listing, the purpose and implementation of the NPL, and the economic impacts of NPL listing.

Each Regional docket for this rule contains all of the information in the Headquarters docket for sites in that Region, plus, the actual reference documents containing the data principally relied upon and cited by EPA in calculating or evaluating the HRS scores for sites in that Region. These reference documents are available only in the Regional dockets. Interested parties may view documents, by appointment only, in the Headquarters or the appropriate Regional docket or copies may be requested from the Headquarters or appropriate Regional docket. An informal request, rather than a formal written request under the Freedom of Information Act, should be the ordinary procedure for obtaining copies of any of these documents.

EPA considers all comments received during the comment period. During the comment period, comments are placed in the Headquarters docket and are available to the public on an " as received" basis. A complete set of comments will be available for viewing in the Regional docket approximately one week after the formal comment period closes. Comments received after the comment period closes will be available in the Headquarters docket and in the Regional docket on an " as received" basis. Comments that include complex or voluminous reports, or materials prepared for purposes other than HRS scoring, should point out the specific information that EPA should consider and how it affects individual HRS factor values. See Northside Sanitary Landfill v. Thomas, 849 F.2d 1516 (D.C. Cir. 1988). EPA will make final listing decisions after considering the relevant comments received during the comment period.

In past rules, EPA has attempted to respond to late comments, or when that was not practicable, to read all late comments and address those that brought to the Agency's attention a fundamental error in the scoring of a site. Although EPA intends to pursue the same policy with sites in this rule, EPA can guarantee that it will consider only those comments postmarked by the close of the formal comment period. EPA has a policy of not delaying a final listing decision solely to accommodate consideration of late comments.

In certain instances, interested parties have written to EPA concerning sites which were not at that time proposed to the NPL. If those sites are later proposed to the NPL, parties should review their earlier concerns and, if still appropriate, resubmit those concerns for consideration during the formal comment period. Site-specific correspondence received prior to the period of formal proposal and comment will not generally be included in the docket.

[Return to Table of Contents]

II. Contents of This Proposed Rule

Table 1 identifies the 5 sites in the General Superfund section being proposed to the NPL in this rule. Table 2 identifies the 1 site in the Federal Facility section being proposed to the NPL in this rule. These tables follow this preamble. All sites are proposed based on HRS scores of 28.50 or above. The sites in Table 1 and Table 2 are listed alphabetically by State, for ease of identification, with group number identified to provide an indication of relative ranking. To determine group number, sites on the NPL are placed in groups of 50; for example, a site in Group 4 of this proposal has a score that falls within the range of scores covered by the fourth group of 50 sites on the NPL.

Withdrawal of Annie Creek Mine Tailings

EPA is hereby withdrawing the proposal of Annie Creek Mine Tailings, located in Lead, South Dakota. This withdrawal was proposed on December 23, 1996 (61 FR 67656). EPA received no comments regarding the proposal to withdraw this site.

These actions along with a final rule published elsewhere in today's Federal Register, results in an NPL of 1,206 sites, 1,055 in the General Superfund Section and 151 in the Federal Facilities Section. With this proposal of 6 new sites, there are now 49 sites proposed and awaiting final agency action, 43 in the General Superfund Section and 6 in the Federal Facilities Section. Final and proposed sites now total 1,255.

[Return to Table of Contents]

III. Executive Order 12866

The Office of Management and Budget (OMB) has exempted this regulatory action from Executive Order 12866 review.

[Return to Table of Contents]

IV. Unfunded Mandates

Title II of the Unfunded Mandates Reform Act of 1995 (UMRA), Public Law 104-4, establishes requirements for Federal agencies to assess the effects of their regulatory actions on State, local, and tribal governments and the private sector. Under section 202 of the UMRA, EPA generally must prepare a written statement, including a cost-benefit analysis, for proposed and final rules with "Federal mandates" that may result in expenditures to State, local, and tribal governments, in the aggregate, or to the private sector, of $100 million or more in any one year. When a written statement is needed for an EPA rule, section 205 of the UMRA generally requires EPA to identify and consider a reasonable number of regulatory alternatives and adopt the least costly, most cost-effective or least burdensome alternative that achieves the objectives of the rule. The provisions of section 205 do not apply when they are inconsistent with applicable law. Moreover, section 205 allows EPA to adopt an alternative other than the least costly, most cost-effective or least burdensome alternative if the Administrator publishes with the final rule an explanation of why that alternative was not adopted. Before EPA establishes any regulatory requirements that may significantly or uniquely affect small governments, including tribal governments, it must have developed under section 203 of the UMRA a small government agency plan. The plan must provide for notifying potentially affected small governments, giving them meaningful and timely input in the development of EPA regulatory proposals with significant Federal intergovernmental mandates, and informing, educating, and advising small governments on compliance with the regulatory requirements.

Today's rule contains no Federal mandates (within the meaning of Title II of the UMRA) for State, local, or tribal governments or the private sector. Nor does it contain any regulatory requirements that might significantly or uniquely affect small governments. This is because today's listing decision does not impose any enforceable duties upon any of these governmental entities or the private sector. Inclusion of a site on the NPL does not itself impose any costs. It does not establish that EPA necessarily will undertake remedial action, nor does it require any action by a private party or determine its liability for site response costs. Costs that arise out of site responses result from site-by-site decisions about what actions to take, not directly from the act of listing itself. Therefore, today's rulemaking is not subject to the requirements of section 202, 203 or 205 of the Unfunded Mandates Reform Act.

[Return to Table of Contents]

V. Effect on Small Businesses

The Regulatory Flexibility Act of 1980 requires EPA to review the impacts of this action on small entities, or certify that the action will not have a significant impact on a substantial number of small entities. By small entities, the Act refers to small businesses, small government jurisdictions, and nonprofit organizations.

While this rule proposes to revise the NPL, an NPL revision is not a typical regulatory change since it does not automatically impose costs. As stated above, adding sites to the NPL does not in itself require any action by any party, nor does it determine the liability of any party for the cost of cleanup at the site. Further, no identifiable groups are affected as a whole. As a consequence, impacts on any group are hard to predict. A site's inclusion on the NPL could increase the likelihood of adverse impacts on responsible parties (in the form of cleanup costs), but at this time EPA cannot identify the potentially affected businesses or estimate the number of small businesses that might also be affected.

The Agency does expect that placing the sites in this proposed rule on the NPL could significantly affect certain industries, or firms within industries, that have caused a proportionately high percentage of waste site problems. However, EPA does not expect the listing of these sites to have a significant economic impact on a substantial number of small businesses.

In any case, economic impacts would occur only through enforcement and cost-recovery actions, which EPA takes at its discretion on a site-by-site basis. EPA considers many factors when determining enforcement actions, including not only a firm's contribution to the problem, but also its ability to pay. The impacts (from cost recovery) on small governments and nonprofit organizations would be determined on a similar case-by-case basis.

For the foregoing reasons, I hereby certify that this proposed rule, if promulgated, will not have a significant economic impact on a substantial number of small entities. Therefore, this proposed regulation does not require a regulatory flexibility analysis.

Table 1
National Priorities List - Proposed Rule #22 - General Superfund Section

State Site name City/county Group
FL Florida Petroleum Reprocessors Fort Lauderdale 5/6
GA Terry Creek Dredge Spoil Areas/Hercules Outfall Brunswick 5
IL DePue/New Jersey Zinc/Mobil Chemical Corp Village of DePue 1
PA Salford Quarry Lower Salford Township 5/6
TX Sprague Road Ground Water Plume Odessa 10
Number of Sites Proposed to General Superfund Section: 5.

Table 2
National Priorities List - Proposed Rule #22 - Federal Facilities Section

State Site name City/county Group
MD Fort George G. Meade Odenton 4
Number of Sites Proposed to Federal Facilities Section: 1.


List of Subjects in 40 CFR Part 300

Environmental protection, Air pollution control, Chemicals, Hazardous materials, Intergovernmental relations, Natural resources, Oil pollution, Reporting and recordkeeping requirements, Superfund, Waste treatment and disposal, Water pollution control, Water supply.

Authority: 33 U.S.C. 1321(c)(2); 42 U.S.C. 9601-9657; E.O. 12777, 56 FR 54757, 3 CFR, 1991 Comp., p. 351; E.O. 12580, 52 FR 2923, 3 CFR, 1987 Comp., p. 193.

Dated: March 25, 1997.

Timothy Fields, Jr.,
Acting Assistant Administrator, Office of Solid Waste and Emergency Response.

[FR Doc. 97-8087 Filed 3-31-97; 8:45 am]

BILLING CODE 6560-50-P

Top of page

OSWER Home | Superfund Home | Innovative Technologies Home


Local Navigation


Jump to main content.