ICCR Archives - Boilers
From the listing below, find the file you would like to download.
File Description |
File Date |
File Types |
||
| EPA Inventory Database v4.1 - Boilers (Access 97) |
2-26-99
|
|||
| Description of Changes incorporated into Boiler Inventory v4.1 |
2-26-99
|
|||
| EPA Inventory Database v.4 - Boilers (Access 2.0) - Includes additional sources/data from DOD and AMSA submitted after v.3 release but does not include specific data corrections made by BWG members and submitted to EPA by the CC as a data/information item at the Sept 1998 CC meeting after the official EPA Inventory Database v.3 release |
11-13-98
|
|||
| Third Supplemental Emission Test Database - Boilers (Access 2.0) |
9-23-98
|
|||
| Inventory Database v.3 - Boilers (Access 2.0) - with corrections made by BWG members and submitted to EPA by the CC as a data/information item at the Sept 1998 CC meeting after the official EPA Inventory Database v.3 release |
9-08-98
|
|||
| Second Supplemental Emission Test Database - Boilers |
8-06-98
|
|||
| Presentation by Boiler Work Group to CC on Preliminary MACT Floor Determinations for Gas, Distillate Oil and Residual Oil. |
7-17-98
|
|||
| Boiler Phase 2 Presentation to be given at July 1998 Coordinating Committee Meeting |
7-17-98
|
|||
| Boiler Test Report |
7-17-98
|
|||
| Supplemental Emission Test Database - Boilers |
6-30-98
|
|||
| ICCR Emission Test Database v.3 - Boilers |
4-28-98
|
|||
| Summary information for Boiler databases |
3-20-98
|
|||
| ICCR Boiler Inventory database v.3 |
3-11-98
|
|||
| ICCR Inventory Database Correction tables - Boilers |
3-10-98
|
|||
| ICCR Emission Database v.2 - Boilers |
3-10-98
|
|||
| Boiler Work Group Members |
09-08-98
|
|||
| Boiler WG Meeting 6/09/98 Final Minutes |
11-20-98
|
|||
| Boiler WG Meeting 9/15/98 Complete Minutes |
11-13-98
|
|||
| Boiler WG Meeting 8/18/98 Complete Minutes |
11-13-98
|
|||
| Boiler WG Meeting 3/24/98 Complete Minutes |
11-13-98
|
|||
| Boiler WG Mtg. 4/30/98 Final minutes |
7-15-98
|
|||
| Boiler Testing Task Group Mtg. 5/19/98 minutes |
6-11-98
|
|||
| Boiler WG Mtg. 2/26/98 complete minutes |
5-14-98
|
|||
| Boiler WG Mtg. 1/13/98 complete minutes |
4-14-98
|
|||
| Draft Version 2 RAP |
5-27-98
|
|||
| Coordinating Committee guidance to Work Groups on Operator Training |
5-27-98
|
|||
| Coordinating Committee guidance to Work Groups on Pollution Prevention Metrics |
5-27-98
|
|||
| Coordinating Committee guidance to Work Groups on Pollution Prevention Regulatory Approaches |
5-27-98
|
|||
| Good Combustion Practice (GCP) guidance | 5-27-98 | |||
| Agenda for 7/30/98 Meeting |
7-16-98
|
|||
| Presentation by Boiler Work Group on Preliminary MACT Floor Determinations for Gas, Distillate Oil and Residual Oil. |
7-17-98
|
|||
| Boiler Work Group Phase 1 Test Plan Presentation to CC |
7-16-98
|
|||
| Boiler Work Group Phase 2 Test Plan Presentation to CC |
7-17-98
|
|||
| Boiler Work Group Test Report |
7-17-98
|
|||
| Milestone Tracking Committee Report |
7-16-98
|
|||
| Upcoming Boiler Work Group meetings and teleconferences from 10/97 through 12/98 | ||||
| Boiler Economic Task Group screening of control technologies |
4-24-98
|
|||
| Tables showing fossil fuel model boilers(presented in section V.A of the 3/24 meeting packet). This is the same information as tables V.A-1 through V.A-9 in the 3/24 meeting packet - no revisions have been made. |
4-23-98
|
|||
| Tables showing wood model boilers(presented in section V.B of the 3/24/98 meeting packet). This replaces the information in tables V.B-1 through V.B-5 in the 3/24 meeting packet. |
4-23-98
|
|||
| Distribution of boilers by SIC code, to be inserted into section VI of the 3/24/98 packet |
4-23-98
|
|||
| Table IV.B-6 listing wood boilers that fire a majority of fossil fuel, to be inserted into section IV.B of the 3/24/98 packet |
4-23-98
|
|||
| Level of control analysis for fossil fuel boilers, Table IV.A-1 section IV.A of the 3/24/98 packet |
4-23-98
|
|||
| Level of control analysis for wood boilers, Tables IV.B-1 to IV.B-5 in section IV.B of the 3/24/98 packet. |
4-23-98
|
|||
| Subcategories for boilers intended to replace II-1 of the 3/24/98 packet |
4-23-98
|
|||
| Fact sheet/templates for fossil fuel subcategories to replace fact sheets/templates in II.A of the 3/24/98 packet |
4-23-98
|
|||
| Fact sheet/templates for wood subcategories to replace fact sheets/templates in II.B of the 3/24/98 packet |
4-23-98
|
|||
| Fact sheet/templates for non-fossil subcategories to replace fact sheets/templates in II.C of the 3/24/98 packet |
4-23-98
|
|||
| Self-extracting files containing the level of control analyses for non-fossil boilers in Excel format |
4-23-98
|
|||
| Non-fossil model boilers - self-extracting Excel files |
4-23-98
|
|||
| Schedule of Boiler Work Group Work and Task Groups Responsible |
4-23-98
|
|||
| Flow diagram of tasks for the Boiler Work Group |
4-23-98
|
|||
| Agenda for 2/26/98 Meeting |
2-16-98
|
|||
| Boiler WG Mtg. 1/13/98 brief min. |
2-5-98
|
|||
| Boiler WG Mtg. 11/20/97 brief minutes |
12-2-97
|
|||
| Status of ICR survey database |
12-18-97
|
|||
| Explanation of survey database tables(1-8) and how to use them |
11-20-97
|
|||
| Table 1: Combustion Unit Design Capacity Gaps |
11-24-97
|
|||
| Table 2: Boiler Description Data Gaps |
11-24-97
|
|||
| Table 3: Process Heater Description Data Gaps |
11-24-97
|
|||
| Table 4: Incinerator Description Data Gaps |
11-24-97
|
|||
| Table 5: Landfill Gas Flare Description Data Gaps |
11-24-97
|
|||
| Table 8: Facilities with No SIC Data |
11-24-97
|
|||
| Boiler WG Mtg. 10/30/97 complete min. |
1-8-98
|
|||
| Boiler WG Mtg. 10/30/97 brief min. |
11-11-97
|
|||
| Boiler WG Presentation to the 9/16-17/97 Coordinating Committee on NOx NSPS revision |
9-8-97
|
|||
| Boiler WG Mtg. 9/18/97 complete min. |
1-6-98
|
|||
| Boiler WG Mtg. 9/18/97 brief min. |
9-24-97
|
|||
| Boiler WG Mtg. 8/19/97 complete min. |
11-13-97
|
|||
| Boiler WG Mtg. 8/19/97 brief min. |
8-26-97
|
|||
| Boiler WG Mtg. 7/24/97 complete min. |
8-28-97
|
|||
| Boiler WG Mtg. 7/24/97 brief min. |
8-7-97
|
|||
| Complete Mtg. minutes for 6/19/97 |
12-16-97
|
|||
| Brief Mtg. minutes for 6/19/97 |
12-16-97
|
|||
| Agenda for 6/19/97 Mtg. |
12-16-97
|
|||
| Agenda for 5/22/97 Mtg. |
12-16-97
|
|||
| Complete Mtg. minutes for 5/22/97 |
12-16-97
|
|||
| Brief Mtg. minutes for 5/22/97 |
12-16-97
|
|||
| Agenda for 5/1/97 Mtg. |
12-16-97
|
|||
| Memo and draft agenda for 5/1/97 |
12-16-97
|
|||
| Brief Mtg. minutes for 4/4/97 |
12-16-97
|
|||
| Brief Mtg. minutes for 3/26/97 |
12-16-97
|
|||
| Complete Mtg. minutes for 3/18/97 |
12-16-97
|
|||
| Brief Mtg. minutes for 3/18/97 |
12-16-97
|
|||
| Agenda for 3/18/97 Mtg. |
12-16-97
|
|||
| WP6.1 Attachment to 2/13/97 minutes |
12-16-97
|
|||
| Excel Attachment to 2/13/97 minutes |
12-16-97
|
|||
| Flash min. for 2/13/97 Task Group Mtg. |
12-16-97
|
|||
| Complete Mtg. minutes for 1/7/97 |
12-16-97
|
|||
| Brief Mtg. minutes for 1/7/97 |
12-16-97
|
|||
| Agenda for Boiler WG Meeting 1/7/97 |
12-16-97
|
|||
| Info. for October 1996 Mtg. |
12-16-97
|
|||
| Work Group and the Relationship to the Source Work Groups |
10-24-96
|
|||
| Graphics to accompany timeline.wpd |
12-16-97
|
|||
| Timeline for information collection |
12-16-97
|
|||
![[logo] US EPA](http://www.epa.gov/epafiles/images/logo_epaseal.gif)