US/CANADA AIR QUALITY AGREEMENT - PERMITTING INFORMATION 1. Facility Information: Sumas Energy 2, Inc. 2. Location: City of Sumas, Whatcom County, Washington, USA 3. Distance from U.S./Canada border: 0.5 mile 4. Type and size of Facility: 710 MW combined cycle power plant 5. Source of Emissions: Natural gas fired turbines 6. Type of fuel: Natural gas Pollutant 7. Type and Quantity of 8. Emission Control Emissions Technology Tons per year @ Pounds In addition to good expected permit per hour combustion practice level NOx 341 78 Low NOx burners with selective catalytic reduction (SCR) CO 92 184 @ Catalytic oxidation part load PM10 179 42 Pipeline natural gas SO2 12 2.8 Pipeline natural gas O3 (VOC) 53 76 @ part Pipeline natural gas load Pb 0.35 0.16 Pipeline natural gas Fluoride None None Pipeline natural gas H2SO4 Mist 3 1.4 Pipeline natural gas Ammonia 64 280 SCR operation control Hazardous and toxic 3.9 17 Pipeline natural gas air pollutants ex. NH3 9. Application Received: Submitted to EFSEC approx. January 4, 1999. Forwarded to Ecology AQP early February. Preliminary review deemed application incomplete (February 17, 1999) due to incomplete RACT analysis. Applicant in process of submitting required supplementary material. 10. Stack: height: 125 feet diameter: 20.5 feet 11. Permitting Authority: Washington Department of Ecology Air Quality Program Engineering and Technical Services P.O. Box 47600 Olympia, WA, 98504-7600 Ph: 360 407 6802 Contact: Bernard Brady Data entered : 03-12-99