1. Name of facility: DaimlerChrysler Corporation 2. Location (city, county, state): Auburn Hills, Oakland County, Michigan 3. Distance from the US/Canada border: about 50 km 4. Type and size of facility: automotive manufacturing plant; the permit application is for an increase in fuel use for the existing eighty engine test cells (cells used to conduct various tests on vehicle engines); 50 cells are controlled and 30 are not controlled. 5. Source of emissions: test cells 6. Type of fuel : leaded and unleaded gasoline 7. Type/quantity of emissions: Emission limits are as following; Pollutant Controlled cells (TPY) Uncontrolled Cells (TPY) NOx 218.2 32.1 CO 20.8 501 VOC 12.5 25.7 Lead 0.58 0.37 8. Emission control technology: the controlled test cells will use thermal oxidizers and catalytic converters to control NOx, CO, and VOC. 9. Date permit application received: MDEQ received the application on February 11, 2002, and USEPA received the proposed permit on October 22, 2002. 10. Stack height and diameter: • uncontrolled cells: two stacks 56 ft height/10 in diameter, one 56 ft height/16 in diameter, • controlled cells: three stacks 59 ft height/24 in diameter, one 56 ft height/16in diameter 11. Permit agency's contact name: Lori L. Peacock Michigan Department of Environmental Quality - Air Quality Division PO Box 30260 Lansing MI 48909 Tel. 517-373-7082