File Description
|
Posting Date
|
Creation Date
|
File Types
|
| Final rpt. other bene.& costs 6/19/97 |
6-23-97 |
xx-xx-xx |

225 kb |
| Non-Utility pt recommen. 6/12/97 |
6-13-97 |
xx-xx-xx |

4 kb |
| Cost tables relating to Lopez's tables |
6-13-97 |
xx-xx-xx |

933 kb |
| revised drft matrix "other bene. & costs" |
6-11-97 |
xx-xx-xx |

89 kb |
| rev. drft refer.list other bene.&costs |
6-11-97 |
xx-xx-xx |

97 kb |
| EPA's 6/97 Cost Analysis/Compare to Lopez |
6-11-97 |
xx-xx-xx |

182 kb |
| Latest Non-utility point recommendation |
6-11-97 |
xx-xx-xx |

4 kb |
| drt sum. Other Bene.&$.KAHAGGX0@WCC.COM |
6-4-97 |
xx-xx-xx |

30 kb |
| value-only spreadsheets |
6-4-97 |
xx-xx-xx |

268 kb |
| cost summary memo |
6-4-97 |
xx-xx-xx |

39 kb |
| cost summary report |
6-4-97 |
xx-xx-xx |

37 kb |
| Table #3 |
6-4-97 |
xx-xx-xx |

8 kb |

13 kb |
| Table #4 |
6-4-97 |
xx-xx-xx |

8 kb |

13 kb |
| Table #5 |
6-4-97 |
xx-xx-xx |

8 kb |

13 kb |
| Table #6 |
6-4-97 |
xx-xx-xx |

9 kb |

13 kb |
| Non-Utility Point source prop. |
6-2-97 |
xx-xx-xx |

18 kb |
| Non-Util. costs 5/29 fin.rept Pechan f/OTAG |
6-2-97 |
xx-xx-xx |

354 kb |
| memo from co-chairs on Prop. for Util. |
5-30-97 |
xx-xx-xx |

24 kb |
| Non-Utility Point Source Proposal |
5-29-97 |
xx-xx-xx |

38 kb |
| State of IN recommendations |
5-21-97 |
xx-xx-xx |

17 kb |
| Proposals for 6/2-3 mtg.Cleveland, OH |
5-27-97 |
xx-xx-xx |

5 kb |
| OTAG other bene.&Costs of Ref.&Abst. |
6-11-97 |
xx-xx-xx |

97 kb |
| matrix of above ref. present.at Chicago |
6-11-97 |
xx-xx-xx |

89 kb |
| Culp.memo from J.Underhill |
5-20-97 |
xx-xx-xx |

2 kb |
| culpability plots |
5-20-97 |
xx-xx-xx |

211 kb |
| memo "Proc for submis.of prop Utility con" |
5-15-97 |
xx-xx-xx |

8 kb |
| drft Cost Para.applied to reduce trans |
5-8-97 |
xx-xx-xx |

440 kb |
| Pro.for coarse grid states 4/30/97 |
5-5-97 |
xx-xx-xx |

23 kb |
| D. Thornton coarse grid prop. 4/28/97 |
5-5-97 |
xx-xx-xx |

28 kb |
| Lopez's Utility Cost Matrices |
4-23-97 |
xx-xx-xx |

1771 kb |
| Announcement for ISI 3/27 call at 11 |
3-26-97 |
xx-xx-xx |

1 kb |
| Criteria for eval runs memo |
3-24-97 |
xx-xx-xx |

257 kb |
| Outline for Criteria Report |
3-19-97 |
xx-xx-xx |

2 kb |
| Final Draft Criteria Memo--Theiler |
3-19-97 |
xx-xx-xx |

289 kb |
| Agenda for 3/19/97 ISI call |
3-19-97 |
xx-xx-xx |

1 kb |
| Backgrd info on ICF's model pres. 2/26/97 |
3-4-97 |
xx-xx-xx |

56 kb |
| Proposed Costing Methodology |
2-25-97 |
xx-xx-xx |

104 kb |
| Table fo Round 3 control strategies |
2-12-97 |
xx-xx-xx |

3 kb |
| Proposed costing method. prepared by Pechan |
2-25-97 |
xx-xx-xx |

104 kb |
| Matrix of Round 3 proposals |
1-8-97 |
xx-xx-xx |

78 kb |
| ZIPPED version of part II |
1-6-97 |
xx-xx-xx |

151 kb |
| Round 3 proposals--part II |
1-6-97 |
xx-xx-xx |

303 kb |
| Not zipped file |
1-3-97 |
xx-xx-xx |

308 kb |
| Round 3 proposals--first batch |
1-3-97 |
xx-xx-xx |

118 kb |
| Localized ozone inc. dur to NOx control |
12-16-96 |
xx-xx-xx |

70 kb |
| Critera for eval results of OTAG runs |
12-16-96 |
xx-xx-xx |

252 kb |
| EPA's draft nitrogen oxides impacts document |
12-12-96 |
xx-xx-xx |

849 kb |
| Strat. Eval. Worksheet Add. Cont. meas. |
12-11-96 |
xx-xx-xx |

6 kb |
| Memo on steering committee for cost |
12-10-96 |
xx-xx-xx |

1 kb |
| Group A memo and document for 12/10 call |
12-10-96 |
xx-xx-xx |

109 kb |
| Crit. for eval. results of OTAG run |
12-3-96 |
xx-xx-xx |

10 kb |
| Group C issue:Sequenece of Controls |
11-22-96 |
xx-xx-xx |

28 kb |
| Implem.issue: I/M:Thresholds & Variations |
11-19-96 |
xx-xx-xx |

15 kb |
| Implem. issue: fuel sel., distri, & standard. |
11-19-96 |
xx-xx-xx |

34 kb |
| Brady memo Ozone Attain. Coal. |
11-15-96 |
xx-xx-xx |

25 kb |
| EPA comments on Round 2 |
11-6-96 |
xx-xx-xx |

19 kb |
| Revised Group A paper--11/5 |
11-6-96 |
xx-xx-xx |

6 kb |
| Draft 10/11 call summary |
11-6-96 |
xx-xx-xx |

25 kb |
| Revised Group A paper from Bret |
10-29-96 |
xx-xx-xx |

5 kb |
| 6 round 2 strategy proposals and memo from Koerber |
10-29-96 |
xx-xx-xx |

44 kb |
| memo Ozone Attain. Coal. position |
11-15-96 |
xx-xx-xx |

25 kb |
| Grp. B-fuel sel. distri. & Standard. |
10-29-96 |
xx-xx-xx |

35 kb |
| Group A paper for 10/22 call |
10-18-96 |
xx-xx-xx |

4 kb |
| Final 9/20 ISI call minutes |
10-18-96 |
xx-xx-xx |

10 kb |
| Final 8/20 ISI call minutes |
10-18-96 |
xx-xx-xx |

18 kb |
| NESCAUM Round 2 proposal--for 10/11 |
10-11-96 |
xx-xx-xx |

1 kb |
| Flux/Criteria--Memo from Theiler 10/11 |
10-11-96 |
xx-xx-xx |

7 kb |
| Draft disbenefit criteria-Theiler |
10-10-96 |
xx-xx-xx |

1 kb |
| Draft minutes from 9/20 call |
10-10-96 |
xx-xx-xx |

10 kb |
| Agenda for 10/11/96 ISI call |
10-8-96 |
xx-xx-xx |

2 kb |
| Attachment A to packets |
10-8-96 |
xx-xx-xx |

21 kb |
| Final Control Strategy Packets--8/23/96 |
10-8-96 |
xx-xx-xx |

73 kb |
| Emissions for Strategy Runs 1-4 |
10-4-96 |
xx-xx-xx |

8 kb |
| Memo from Koerber-Dev't of Round 2 strategies |
10-3-96 |
xx-xx-xx |

3 kb |
| Options for geog. eval. of strategies |
10-3-96 |
xx-xx-xx |

4 kb |
| Group C implementation issues paper |
9-24-96 |
xx-xx-xx |

61 kb |
| Minutes of 8/29 Group A call |
9-24-96 |
xx-xx-xx |

9 kb |
| Group A implementation issues paper |
9-24-96 |
xx-xx-xx |

8 kb |
| Inv. coordination taskforce material |
9-23-96 |
xx-xx-xx |

6 kb |
| Attachment to letter from API |
9-23-96 |
xx-xx-xx |

22 kb |
| Ltr. from API on MOG comments-Word 6.0 |
9-23-96 |
xx-xx-xx |

40 kb |
| Group D implementation issues paper |
9-21-96 |
xx-xx-xx |

8 kb |
| Group B implementation issues paper |
9-21-96 |
xx-xx-xx |

11 kb |
| Draft minutes of 8/20 ISI WG call |
9-19-96 |
xx-xx-xx |

19 kb |
| Agenda for 9/20 ISI WG call |
9-19-96 |
xx-xx-xx |

1 kb |
| Attachment to letter from API |
9-16-96 |
xx-xx-xx |

14 kb |
| Letter to ISI WG from API |
9-16-96 |
xx-xx-xx |

24 kb |
| Minutes of 8/19 ISI WG conf. call |
9-16-96 |
xx-xx-xx |

24 kb |
| Minutes of 8/9 ISI WG conf. call |
9-16-96 |
xx-xx-xx |

19 kb |
| Set 2 eval. criteria & initial strat. |
8-28-96 |
xx-xx-xx |

6 kb |
| Memo on control factors for utilities |
8-27-96 |
xx-xx-xx |

41 kb |
| Attachment C to Packets |
8-21-96 |
xx-xx-xx |

14 kb |
| Revised Strategy Packets from Brock |
8-21-96 |
xx-xx-xx |

32 kb |
| 7/26 memo from D. Parks on sens. tests |
8-20-96 |
xx-xx-xx |

1 kb |
| Minutes of 7/31 Broad Approaches call |
8-20-96 |
xx-xx-xx |

21 kb |
| Memo from S. Gerritson on proposal 2 |
8-20-96 |
xx-xx-xx |

5 kb |
| Set 2 evaluation criteria |
8-19-96 |
xx-xx-xx |

4 kb |
| Straw proposals for control strat. mod. |
8-16-96 |
xx-xx-xx |

14 kb |
| Summary of 8/8 Impl. Issues call |
8-15-96 |
xx-xx-xx |

2 kb |
| Announcement of 8/16 Impl. Issues Group A |
10-18-96 |
xx-xx-xx |

4 kb |
| Announcement of 8/14 Impl. Issues Group C |
8-13-96 |
xx-xx-xx |

1 kb |
| Revised schedule of Aug. ISI WG calls |
8-12-96 |
xx-xx-xx |

1 kb |
| Memo on 8/7 Implem. Issues call |
8-6-96 |
xx-xx-xx |

2 kb |
| Memo from Mike Koerber and David Parks |
7-31-96 |
xx-xx-xx |

59 kb |
| Announcement of 7/31 3:00 B/A miniwg call |
7-31-96 |
xx-xx-xx |

1 kb |
| Minutes of 6/21 ISI WG call |
7-22-96 |
xx-xx-xx |

15 kb |
| Attachment to NOx control packet table |
10-8-96 |
xx-xx-xx |

21 kb |
| Control packet tables (WP 5.1/5.2) |
7-22-96 |
xx-xx-xx |

26 kb |
| Control packet tables (WP 6.0) |
7-22-96 |
xx-xx-xx |

36 kb |
| 2/28 memo on criteria ratings |
7-9-96 |
xx-xx-xx |

12 kb |
| Memo on 6/21 ISI & RUSM WG's call |
6-20-96 |
xx-xx-xx |

4 kb |
| Utility optim. matrix w/alt. limits |
6-11-96 |
xx-xx-xx |

294 kb |
| Utility optim. matrix, version 8L |
6-11-96 |
xx-xx-xx |

200 kb |
| Utility optim. matrix, version 8L |
6-11-96 |
xx-xx-xx |

45 kb |
| Utility optim. matrix, version 8L |
6-11-96 |
xx-xx-xx |

191 kb |
| Utility optim. matrix, version 8L |
6-11-96 |
xx-xx-xx |

191 kb |
| Utility optim. matrix, version 8L |
6-11-96 |
xx-xx-xx |

23 kb |
| Utility optim. martix, version 8H |
6-7-96 |
xx-xx-xx |

200 kb |
| Utility optim. matrix, version 8H |
6-7-96 |
xx-xx-xx |

45 kb |
| Utility optim. matrix, version 8H |
6-7-96 |
xx-xx-xx |

192 kb |
| Utility optim. matrix, version 8H |
6-7-96 |
xx-xx-xx |

192 kb |
| Utility optim. matrix, version 8H matrices |
6-7-96 |
xx-xx-xx |

23 kb |
| Please read BEFORE downloading utility |
6-13-96 |
xx-xx-xx |

1 kb |
| Minutes of 5/10 ISI WG call |
6-6-96 |
xx-xx-xx |

20 kb |
| Attachment to growth factor memo |
5-31-96 |
xx-xx-xx |

41 kb |
| Memo on default growth & control factors |
5-31-96 |
xx-xx-xx |

1 kb |
| Minutes of 4/24 ISI WG conf. call |
5-22-96 |
xx-xx-xx |

26 kb |
| Revised memo on 5/10 ISI WG call |
5-10-96 |
xx-xx-xx |

1 kb |
| Minutes of 4/9 ISI WG conf. call |
5-7-96 |
xx-xx-xx |

35 kb |
| Memo on matrix for utilities |
5-2-96 |
xx-xx-xx |

6 kb |
| Minutes of 4/4 ISI WG conf. call |
4-30-96 |
xx-xx-xx |

13 kb |
| Matrix for utilities (Quatro Pro 6) |
4-24-96 |
xx-xx-xx |

164 kb |
| Memo on 4/24 conf. call |
4-23-96 |
xx-xx-xx |

1 kb |
| Summary of 3/27 ISI call |
4-10-96 |
xx-xx-xx |

19 kb |
| 3/22 conf. call summary |
4-5-96 |
xx-xx-xx |

10 kb |
| Memo on sensitivity run explanation |
3-28-96 |
xx-xx-xx |

1 kb |
| Directions to 4/1 ISI WG meeting |
3-28-96 |
xx-xx-xx |

1 kb |
| Memo on cost effectiveness |
3-26-96 |
xx-xx-xx |

3 kb |
| Announcement for 3/22 conference call |
3-21-96 |
xx-xx-xx |

1 kb |
| Memo on baseline modeling assumptions |
3-21-96 |
xx-xx-xx |

2 kb |
| Announcement for 3/20 call |
3-13-96 |
xx-xx-xx |

1 kb |
| Memo from RUSM WG on sensitivity tests |
3-8-96 |
xx-xx-xx |

4 kb |
| Minutes from 2/23 conf. call |
3-8-96 |
xx-xx-xx |

12 kb |
| Handouts from 3/1 meeting (WP 5.1/5.2) |
3-7-96 |
xx-xx-xx |

23 kb |
| Recommended Definition of Relative CE |
2-21-96 |
xx-xx-xx |

2 kb |
| Info for 2/23 ISI conf. call |
2-20-96 |
xx-xx-xx |

1 kb |
| Issue Paper for Joint ISI and T/I call |
12-12-95 |
xx-xx-xx |

5 kb |
| Minutes from 11/28/95 call |
12-11-95 |
xx-xx-xx |

13 kb |
| Info. for ISI calls on 12/11/95 |
12-11-95 |
xx-xx-xx |

8 kb |
| Revised mission and goal--10/3/95 |
10-4-95 |
xx-xx-xx |

1 kb |
| Proposed workgroup goal statement |
9-25-95 |
xx-xx-xx |

1 kb |