From the listing below, find the file you would like to download.
The document may be available in one or more file formats, as represented
by the icons on the righthand side of the listing. Click on the
icon that represents the format you wish to receive.
File Description
|
Posting Date
|
Creation Date
|
File Types
|
| contrasts cap sys.with rate sys. |
5-27-97 |
xx-xx-xx |

57 kb |
| combines table1 by UARG with eval. framework |
5-27-97 |
xx-xx-xx |

79 kb |
| flow charts |
5-21-97 |
xx-xx-xx |

217 kb |
| flow charts |
5-21-97 |
xx-xx-xx |

87 kb |
| key policy issues |
5-27-97 |
xx-xx-xx |

56 kb |
| Eval. framework for del. of desired resul |
5-21-97 |
xx-xx-xx |

65 kb |
| market system types comparative analyses |
5-27-97 |
xx-xx-xx |

79 kb |
| draft workshop agenda for 5/29/97 |
5-21-97 |
xx-xx-xx |

29 kb |
| memo from J.Rue final design prop.papers |
5-20-97 |
xx-xx-xx |

32 kb |
| design prop.for emis.assign. final 5/15 |
5-20-97 |
xx-xx-xx |

65 kb |
| design prop.for emis.banking final 5/15 |
5-20-97 |
xx-xx-xx |

118 kb |
| design prop.for emis.currenty final 5/15 |
5-20-97 |
xx-xx-xx |

66 kb |
| design prop.for inter-sector trans.fn5/15 |
5-20-97 |
xx-xx-xx |

65 kb |
| design prop.for perf.account. final 5/15 |
5-20-97 |
xx-xx-xx |

70 kb |
| design prop.formark.sys.perfor rev.5/15 |
5-20-97 |
xx-xx-xx |

61 kb |
| design prop.for part.stat.sources fnl5/15 |
5-20-97 |
xx-xx-xx |

81 kb |
| cover memo from R. Kanerva |
5-7-97 |
xx-xx-xx |

32 kb |
| Likelihood chart [one page] |
5-7-97 |
xx-xx-xx |

21 kb |
| Explanation of risk ratings chart |
5-7-97 |
xx-xx-xx |

31 kb |
| design prop for part.sources 5/5/97 |
5-7-97 |
xx-xx-xx |

84 kb |
| design prop. for emis assign 5/5/97 |
5-7-97 |
xx-xx-xx |

66 kb |
| design prop. for emiss. banking 5/5/97 |
5-7-97 |
xx-xx-xx |

118 kb |
| design prop for emiss. currency 5/5/97 |
5-7-97 |
xx-xx-xx |

69 kb |
| design prop for perf account. 5/597 |
5-7-97 |
xx-xx-xx |

73 kb |
| design prop for inter sector trans.4/21 |
5-7-97 |
xx-xx-xx |

66 kb |
| design prop for mark.sys.perf.rev. 4/21 |
5-7-97 |
xx-xx-xx |

64 kb |
| drft outline for T/I work grp. report |
4-29-97 |
xx-xx-xx |

60 kb |
| flowchart "St.NOx Bud. vs Target level" |
4-29-97 |
xx-xx-xx |

58 kb |
| design prop. for inter-sect 4/25 |
4-29-97 |
xx-xx-xx |

64 kb |
| design prop. for perf. acct. 4/25 |
4-29-97 |
xx-xx-xx |

76 kb |
| design prop. for emis. curr. 4/25 |
4-29-97 |
xx-xx-xx |

73 kb |
| Mike Sklar's comments on Inter-sec trans. |
4-29-97 |
xx-xx-xx |

39 kb |
| design prop. for part.sources 4/21 |
4-22-97 |
xx-xx-xx |

79 kb |
| design prop. for emiss. assign. 4/21 |
4-22-97 |
xx-xx-xx |

63 kb |
| design prop. for emiss. banking 4/21 |
4-22-97 |
xx-xx-xx |

116 kb |
| design prop. for emiss. currency 4/21 |
4-22-97 |
xx-xx-xx |

69 kb |
| design prop. for perf. account. 4/21 |
4-22-97 |
xx-xx-xx |

78 kb |
| design prop. for inter-sec. trans. 4/21 |
4-22-97 |
xx-xx-xx |

62 kb |
| design pro.mark.sys.perf.rev. 4/21 |
4-22-97 |
xx-xx-xx |

63 kb |
| design prop. for perf. account. 4/7 |
4-15-97 |
xx-xx-xx |

63 kb |
| design prop. mark.sys.perf.rev. 4/11/97 |
4-15-97 |
xx-xx-xx |

54 kb |
| design prop. emiss. currency 4/10 |
4-15-97 |
xx-xx-xx |

62 kb |
| design prop. for emiss. banking 4/10 |
4-15-97 |
xx-xx-xx |

92 kb |
| design prop. for part.sources 4/10 |
4-15-97 |
xx-xx-xx |

158 kb |
| Design prop. inter-sector trans 4/10 |
4-14-97 |
xx-xx-xx |

61 kb |
| design prop. emis. assign. 4/10 |
4-14-97 |
xx-xx-xx |

64 kb |
| interface trad.w/attin plans&ROP 4/9 |
4-14-97 |
xx-xx-xx |

26 kb |
| Design Prop. for emiss. curr. 4/7/97 |
4-10-97 |
xx-xx-xx |

58 kb |
| Design prop. for emiss. assign. 4/7 |
4-10-97 |
xx-xx-xx |

59 kb |
| Design prop. for part. sources 4/7 |
4-10-97 |
xx-xx-xx |

153 kb |
| Design prop. for emiss. banking 4/7 |
4-10-97 |
xx-xx-xx |

89 kb |
| Design prop. for Perf. Account. 4/7 |
4-15-97 |
xx-xx-xx |

63 kb |
| Design Proposal for emiss. curr. 3/31 |
4-2-97 |
xx-xx-xx |

20 kb |
| Design Pop. for emiss. assign. 3/31 |
4-2-97 |
xx-xx-xx |

21 kb |
| Design prop. for part. sources 3/31 |
4-2-97 |
xx-xx-xx |

112 kb |
| Design prop. for emiss. banking 3/31 |
4-2-97 |
xx-xx-xx |

50 kb |
| Design Prop. for Partici. sources |
3-25-97 |
xx-xx-xx |

36 kb |
| Design Prop. for Emis.Respon. Deter. |
3-25-97 |
xx-xx-xx |

27 kb |
| Design Proposal for Emissions Banking |
3-24-97 |
xx-xx-xx |

47 kb |
| NOx Emis. Trad.in the OTAG Reg. paper |
3-20-97 |
xx-xx-xx |

17 kb |
| revised 3/13 version Comp.of Mar. Sys. |
3-20-97 |
xx-xx-xx |

29 kb |
| Kozak'ss com. on 3/11 draft design pro. |
3-20-97 |
xx-xx-xx |

13 kb |
| Analy. of NOx Strat.for Elec.pow.gen.sum |
3-19-97 |
xx-xx-xx |

66 kb |
| draft rept. on Inter.trad. w/attain.plan,RFP |
3-12-97 |
xx-xx-xx |

19 kb |
| paper to be discussed on 3/12 conf.call |
3-12-97 |
xx-xx-xx |

23 kb |
| memo from Koepke to ISI T/I re trad. model. |
3-12-97 |
xx-xx-xx |

37 kb |
| Attach. to design prop. for part. sources |
3-12-97 |
xx-xx-xx |

73 kb |
| revised Compar. of Market Sys. Types |
3-11-97 |
xx-xx-xx |

33 kb |
| revised design pro. for part. sources |
3-11-97 |
xx-xx-xx |

58 kb |
| Comparisons of Market System Types |
3-7-97 |
xx-xx-xx |

32 kb |
| Design propos. for part. sources |
3-6-97 |
xx-xx-xx |

49 kb |
| Rue memo w/cc sched. for Pol & Trad WG |
3-6-97 |
xx-xx-xx |

8 kb |
| Outline for workgroup report |
2-27-97 |
xx-xx-xx |

24 kb |
| Prop. for devel. of NOx Market Systems |
2-27-97 |
xx-xx-xx |

41 kb |
| report geo.,analy.,discus.,Grano com. |
2-27-97 |
xx-xx-xx |

24 kb |
| Trading WG policy paper for 3/11. |
2-21-97 |
xx-xx-xx |

26 kb |
| MA NOx allow. Reg. Tech. Sup. summary |
2-5-97 |
xx-xx-xx |

71 kb |
| Maines proposed rule for NOx Allow. |
1-30-97 |
xx-xx-xx |

121 kb |
| table attach. to Maines propos. rule |
1-30-97 |
xx-xx-xx |

21 kb |
| EmissionsMarket Systems Workshop brief. |
1-29-97 |
xx-xx-xx |

2.3 M |
| Attachment to EMS mtg. briefing |
1-29-97 |
xx-xx-xx |

204 kb |
| L. Sicuranza's overheads present. at EMS Mtg. |
1-29-97 |
xx-xx-xx |

18 kb |
| Role of Mobile Sources in emiss. trad. prog |
12-23-96 |
xx-xx-xx |

52 kb |
| Rev. Kanerva's paper Alloc. Nox E Allot |
12-11-96 |
xx-xx-xx |

66 kb |
| 11/15/96 letter from Cowan to Jim Rue |
12-3-96 |
xx-xx-xx |

7 kb |
| memo from Grano to Rue/Baker-Util. NOx |
12-3-96 |
xx-xx-xx |

6 kb |
| Anal. of NOx Strat. for Elec. Poser Gen |
11-6-96 |
xx-xx-xx |

54 kb |
| Kozak's comments on Kanerva's paper |
11-6-96 |
xx-xx-xx |

23 kb |
| Cover memo for policy paper |
11-6-96 |
xx-xx-xx |

6 kb |
| Kanerva's policy paper for 11/7 |
11-6-96 |
xx-xx-xx |

32 kb |
| Analy. of utility NOx trad. scen. 10-96. |
11-6-96 |
xx-xx-xx |

38 kb |
| Final Pol. Pap. "Design..." |
10-4-96 |
xx-xx-xx |

9 kb |
| Section 2 of Brownstein's document |
10-3-96 |
xx-xx-xx |

69 kb |
| Sect. 1 of "Implementing..."Brownstein |
10-3-96 |
xx-xx-xx |

54 kb |
| Memo on market price considerations |
9-24-96 |
xx-xx-xx |

7 kb |
| 9/19 policy paper |
9-24-96 |
xx-xx-xx |

22 kb |
| Memo on 9/19 policy paper |
9-24-96 |
xx-xx-xx |

1 kb |
| Minutes of 9/12 Area/Mobile group call |
9-24-96 |
xx-xx-xx |

17 kb |
| 9/18 memo on Mobile/Area trading |
9-24-96 |
xx-xx-xx |

32 kb |
| Minutes of 8/12 T/I task group call |
8-19-96 |
xx-xx-xx |

19 kb |
| Urgent note to T/I WG about 8/22 mtg. |
8-16-96 |
xx-xx-xx |

1 kb |
| Minutes of 8/2 Area/Mobile task group call |
8-12-96 |
xx-xx-xx |

15 kb |
| Minutes of 7/19 T/I task group call |
8-12-96 |
xx-xx-xx |

10 kb |
| Memo from J. Goffman on OTC NOx budget |
7-29-96 |
xx-xx-xx |

32 kb |
| Memo from J. Goffman on command/control |
7-29-96 |
xx-xx-xx |

11 kb |
| Minutes of 7/12 Mobile/Area Task Group call |
7-23-96 |
xx-xx-xx |

16 kb |
| Memo on def. of surplus reductions |
7-23-96 |
xx-xx-xx |

10 kb |
| Memo on def. of emission reductions |
7-23-96 |
xx-xx-xx |

10 kb |
| Memo on Banking |
7-23-96 |
xx-xx-xx |

10 kb |
| Revised memo on design features |
7-23-96 |
xx-xx-xx |

8 kb |
| Status of Area/Mobile Sources Task Group |
7-11-96 |
xx-xx-xx |

3 kb |
| Minutes of 6/27 Area/Mobile Group call |
7-9-96 |
xx-xx-xx |

10 kb |
| Minutes of 5/31 Area/Mobile Group call |
6-20-96 |
xx-xx-xx |

12 kb |
| Minutes of 5/31 Banking Task Group call |
6-18-96 |
xx-xx-xx |

20 kb |
| Participant list-Area/Mobile group |
6-17-96 |
xx-xx-xx |

5 kb |
| Area/Mobile task group |
6-17-96 |
xx-xx-xx |

50 kb |
| Area/Mobile task group |
6-17-96 |
xx-xx-xx |

53 kb |
| File for Area/Mobile task group |
6-17-96 |
xx-xx-xx |

11 kb |
| Charts for Area/Mobile task group |
6-17-96 |
xx-xx-xx |

31 kb |
| June files from Area/Mobile task group |
6-17-96 |
xx-xx-xx |

202 kb |
| May memos etc. from Area/Mobile group |
6-17-96 |
xx-xx-xx |

39 kb |
| April memos/mins. from Area/Mobile group |
6-17-96 |
xx-xx-xx |

25 kb |
| Agenda for 4/25 Area/Mobile call |
4-24-96 |
xx-xx-xx |

1 kb |
| summary of T/I Banking Group 4/2 call |
4-10-96 |
xx-xx-xx |

14 kb |
| Banking graphics |
4-8-96 |
xx-xx-xx |

72 kb |
| Banking graphics |
4-8-96 |
xx-xx-xx |

80 kb |
| Summary of Banking call on 3/25 |
4-8-96 |
xx-xx-xx |

16 kb |
| Model Rule/Banking |
4-8-96 |
xx-xx-xx |

17 kb |
| Policy paper for 2/29 mtg. |
3-5-96 |
xx-xx-xx |

6 kb |
| Information paper for 1/24 |
1-12-96 |
xx-xx-xx |

8 kb |
| Directionality and NOx Budget Trading |
12-14-95 |
xx-xx-xx |

6 kb |
| Issue Paper for Joint ISI and T/I call |
12-12-95 |
xx-xx-xx |

5 kb |
| Paper for 12/4 meeting |
12-1-95 |
xx-xx-xx |

7 kb |
| Formal Cancellation of 12/1 call |
12-1-95 |
xx-xx-xx |

1 kb |
| Source Categoriesp |
11-29-95 |
xx-xx-xx |

1 kb |
| Materials for 11/13 mtg. from V. Brisini |
11-6-95 |
xx-xx-xx |

1 kb |
| Materials for 11/13 mtg. from M. Bradley |
11-6-95 |
xx-xx-xx |

2 kb |
| Materials for 11/13 mtg. from J. Belanger |
11-6-95 |
xx-xx-xx |

5 kb |
| Descriptions of groups/chairs |
10-20-95 |
xx-xx-xx |

4 kb |
| Will trading occur b/t multi or single sec.? |
10-20-95 |
xx-xx-xx |

3 kb |
| Overheads from presentation to S&C sub. |
10-26-95 |
xx-xx-xx |

3 kb |
| Memo from Jim Rue on Key Criteria |
9-7-95 |
xx-xx-xx |

26 kb |
| Trading & Incentives WG mission |
9-7-95 |
xx-xx-xx |

6 kb |