Jump to main content.


OAR Policy and Guidance Metarecord

Document Title/Subject:
Integrated Iron and Steel Manufacturing: Air Toxics Requirements: Final Rule
Related Documents:
Signed by: Administrator Christine Todd Whitman

Signature Date: 02/28/2003

Contact:
Phil Mulrine
(919)541-5289

Filename(s):
http://www.epa.gov/ttn/oarpg/t3/fr_notices/iism_fr.pdf
URL(s):



 

Regulatory Authority:
Title 3
Division/Director:
Emission Standards Division (OAQPS) / Sally Shaver
Submitted By:
mulrine.phil
OGC Contact:
Patrice Simms
OGC Phone#:
(202)564-5593
Internet Contact:
Jeff Clark
Document Type:
Proposed & Final Preambles & Rules,
EPA Document Number:

Federal Register:
Supersedes:
Subject Category:
ENVIRONMENTAL PROTECTION AGENCY
Keywords:
Hazardous air pollutants
HAPs

Terms:
Clean Air Act
CAA
Abstract:
The EPA is promulgating NESHAP for integrated iron and steel manufacturing facilities. The final standards establish emission limitations for HAP emitted from new and existing sinter plants, blast furnaces, and basic oxygen process furnace (BOPF) shops. This file is the text of the final rule.

Site Index | File Utilities


Local Navigation


Jump to main content.