Table of Contents
Table 1-1. Petroleum Refinery NESHAP General Requirements
|
Item
|
Requirement
|
Section
|
Frequency
|
| Testing | Notify the regulatory authority 30 days prior to conducting a performance test (if a test is required - see process vent tables). | 63.642(d)(2) | Once |
| Conduct tests at representative operating conditions that result in the lowest emission reduction. | 63.642(d)(3) | N/A | |
| Monitoring | See tables for each kind of emission point. | ||
| Reporting | Permit Application An owner or operator subject to the provisions of the petroleum refinery NESHAP must apply for a part 70 or part 71 permit. |
63.642(a) | Once (and as directed by the permit) |
| Application for Approval of Construction or Reconstruction
Applies to new or reconstructed sources only, general application requirements include the following: |
63.5(d) | Once | |
|
|||
| Notification of Compliance Status (NCS) Information required in a NCS report may be submitted in an operating permit application, in an amendment to an operating permit application, or as a separate submittal. |
63.654(f) | Once | |
| The following information is required: | 63.654(f)(1) and (f)(3) | ||
|
|||
|
63.654(f)(2) | ||
|
63.654(f)(4) | ||
|
Requirement |
|||
|
63.654(h)(6)(i) | ||
|
63.654(h)(6)(ii) | ||
|
63.654(h)(6)(iii) | ||
| Periodic Report If no compliance exceptions occur in the 6 month reporting period, a periodic report is not necessary, unless (1) emissions averaging is used, (2) a Group 1 emission point becomes a Group 2 emission point, (3) a new Group 1 emission point is added, or (4) a floating roof storage vessel is brought into compliance.a |
63.654(g) | Semi-annual (if there is a compliance exception). Quarterly for points in emissions averages. | |
| Periodic reports must include information on compliance exceptions (see tables for each kind of emission point). | |||
| If a performance test is done for an emission point that is added or changed from Group 2 to Group 1, include the results (e.g., percent emissions reduction or concentration) in the next periodic report. | 63.654(g)(7) | Once | |
| If a Group 2 emission point becomes a Group 1 emission point or a new Group 1 emission point is added, include the Notification of Compliance Status report in the next periodic report.a Refer to tables 2 through 7 for the type of information that is to be included for each kind of emission point. | 63.654(f)(6) | ||
| If a floating roof storage vessel is brought into compliance, include the Notification of Compliance Status report for the vessel in the next periodic report. Include the method of compliance, a list of storage vessels subject to control requirements, and the anticipated and actual compliance dates. | 63.654(f)(6) 63.654(f)(1)(i)(A) |
||
| Startup, Shutdown, and Malfunction Report A startup, shutdown, and malfunction report is not required if a malfunction does not occur during a reporting period. If a malfunction occurs and corrective actions are consistent with the startup, shutdown, and malfunction plan (SSMP) include a statement to that effect in the next periodic report. |
63.654(h)(1), 63.10(d)(5)(i) |
Semi-annual (if a malfunction has occurred | |
|
If a malfunction occurs and corrective actions are not consistent with the SSMP, submit in the next periodic report: - circumstances of the event; |
63.10(d)(5)(ii) | Semi-annual (if a malfunction has occurred and the actions taken are not consistent with the SSMP) | |
| Other Reports Required for Special Situations
The following information, if applicable, must be submitted with the Notification of Compliance Status report for existing sources or with the application for approval of construction for new sources: |
Once (if applicable) | ||
|
63.654(h)(4) | ||
|
The following information, if applicable, must be submitted 18 months before the compliance date for existing sources or with the application for approval of construction for new sources: |
63.654(h)(4) | ||
|
|||
|
63.654(h)(5) | ||
|
63.654(h)(5)(iv) and 63.8(f)(4)(ii) | ||
| A request may be submitted to establish an alternative emission standard. A test plan or results of testing and monitoring must be submitted. (If the EPA finds that the alternative standard is equivalent to the NESHAP, the EPA will request public comment and publish a Federal Register notice allowing its use.) | 63.6(g)(2) | ||
| Request for Extension of Compliance Such requests are allowed only for existing sources and must be submitted at least 12 months before the compliance date (18 months if emissions averaging is used). The request must include: |
63.6(i)(3) | Once (not required unless an extension of compliance is sought) | |
|
|||
| Application for a Performance Test Waiver An application for a waiver shall include information justifying the request (e.g., technical or economic infeasibility). |
63.7(h)(3)(iii) | Once (not required unless a performance test waiver is sought) | |
| Recordkeeping | Records must be maintained for at least 5 years. Records must be accessible within 24 hours of request in either hard copy or computer-readable form. | 63.642(e) and 63.654(i)(4) |
N/A |
| Maintain records of the occurrence and duration of each startup, shutdown, or malfunction of operation and each air pollution control equipment malfunction. | 63.10(b)(2)(i-ii) | During each malfunction | |
| Maintain records of any actions that are inconsistent with the startup, shutdown, and malfunction plan; and records that demonstrate the plan has been followed. | 63.10(b)(2)(iv-v) | During each malfunction | |
| Maintain records of continuous monitoring system calibration checks (if continuous monitoring is required). | 63.10(b)(x) | After each calibration check |
aThis requirement represents a recent amendment
(63 FR 44135, August 18, 1999) to the petroleum refineries NESHAP.
bNot required unless a source wishes to use monitoring procedures
different from those specified in the NESHAP.
Table 2-1. Requirements for Group 1 Miscellaneous Process Vents Routed to a Flare
|
Item
|
Requirement
|
Section
|
Frequency
|
| Testing | An initial test showing compliance with Section 63.11(b), including measurement/determination of the following: | 63.643(a)(1) 63.116(a) |
once
|
|
63.11(b) | ||
| Monitoring | Monitor the presence of a pilot flame.a | 63.644(a)(2) |
once/hr
|
| If vent stream could be diverted from control device by a bypass line: | |||
|
63.644(c)(1) 63.644(c)(2) |
once/hr
once/month |
|
| Reporting | Notification of Compliance Status (NCS) | ||
| Identification of vent and method of compliance | 63.654(f)(1)(ii) |
once
|
|
| Report results of initial test, including: | 63.654(f)(1)(iv) |
once
|
|
|
|||
| If parameter other than presence of pilot flame is monitored, acceptable range for parameter and rationale for range. | 63.654(f)(3)(ii) |
once
|
|
| Times at which an operating day begins and ends | 63.654(f)(3)(iii) |
once
|
|
| Semi-Annual Reports Report periods of excess emissions, including: |
63.654(g)(6)(i) |
Every 6 Months |
|
|
|||
| Recordkeeping | Complete test report for initial test results | 63.654(i)(2) | |
| Each pilot flame presence determination | 63.654(i)(3)(ii)(A) | ||
| Times and durations of periods when monitoring device is not operating | 63.654(i)(3)(v) | ||
| Retain all information required to be reported for five years. | 63.654(i)(4) |
bIf all values of monitored parameter are within range reported in the NCS, may record that all values were within range instead of daily average values [63.654(i)(3)(iv)].
Table 2-2. Requirements for Group
1 Miscellaneous Process Vents Routed to an Incinerator
|
Item
|
Requirement
|
Section
|
Frequency
|
| Testing | Initial performance test to show compliance with requirement to reduce organic HAP by 98% or to a concentration 20 ppmv | 63.645, 63.116 except (d) and (e) |
once
|
| Monitoring | Monitor the firebox temperature.a,b | 63.644(a)(1)(i) |
once/hr
|
| If vent stream could be diverted from control device by a bypass line: | |||
|
63.644(c)(1) | once/hr | |
|
63.644(c)(2) |
once/month
|
|
| Reporting | Notification of Compliance Status (NCS) | ||
| Identification of vent and method of compliance. | 63.654(f)(1)(ii) |
once
|
|
| Report results of performance test, including: | 63.654(f)(1)(iii) |
once
|
|
|
|||
| Acceptable range for daily average firebox temperaturea and rationale for range Times at which an operating day begins and ends | 63.654(f)(3)(iii) |
once
|
|
| Semi-Annual Reports Report periods of excess emissions, including: |
63.654(g)(6) |
Every 6 Months
|
|
|
|||
| Recordkeeping | Complete test report for initial performance test results | 63.654(i)(2) | |
| Each value of firebox temperaturea or a block average of values for periods <= 1 hour | 63.654(i)(3)(ii) | ||
| Daily average of firebox temperature,a,c | 63.654(i)(3)(iii) | ||
| Times and durations of periods when monitoring device is not operating | 63.654(i)(3)(v) | ||
| Retain all information required to be reported for five years. | 63.654(i)(4) |
aFor Catalytic Incinerators, monitor the
gas stream temperature immediately before and after the catalyst bed and
calculate temperature difference across the bed.
bA request may be made to monitor an alternate parameter.
cIf all values of monitored temperatures are within range reported
in the NCS, may record that all values were within range instead of daily
average values [63.654(i)(3)(iv)].
Table 2-3. Requirements
for Group 1 Miscellaneous Process Vents Routed to a < 44 MW Boiler
or Process Heater and not Introduced into the Flame Zone
|
Item
|
Requirement
|
Section
|
Frequency
|
| Testing | Initial performance test to show compliance with requirement to reduce organic HAP by 98% or to a concentration <= 20 ppmv | 63.645, 63.116 except (d) and (e) |
once
|
| Monitoring | Monitor firebox temperature.a | 63.644(a)(4) |
once/hr
|
| If vent stream could be diverted from control device by a bypass line: |
|
||
|
63.644(c)(1) |
once/hr |
|
|
63.644(c)(2) | once/month | |
| Reporting | Notification of Compliance Status (NCS) | ||
| Identification of vent and method of compliance. | 63.654(f)(1)(ii) |
once
|
|
Report results of performance test, including:
|
63.654(f)(1)(iii) |
once
|
|
| Acceptable range for daily average firebox temperature and rationale for range. Times at which an operating day begins and ends. | 63.654(f)(3)(iii) |
once
|
|
| Semi-Annual Reports | |||
|
Report periods of excess emissions, including: |
63.654(g)(6) |
Every 6 Months
|
|
|
|||
| Recordkeeping | Complete test report for initial performance test results | 63.654(i)(2) | |
| Each firebox temperature or a block average of values for periods <= 1 hour | 63.654(i)(3)(ii) | ||
| Daily average firebox temperatureb | 63.654(i)(3)(iii) | ||
| Times and durations of periods when monitoring device is not operating | 63.654(i)(3)(v) | ||
| Retain all information required to be reported for five years. | 63.654(i)(4) |
aA request may be made to monitor an alternate
parameter.
bIf all values of firebox temperature are within range reported
in the NCS, may record that all values were within range instead of daily
average values [63.654(i)(3)(iv)].
Table 2-4. Requirements for Group 1 Miscellaneous Process Vents Introduced into the Flame Zone of a Boiler or Process Heater or Routed to a > 44 MW Boiler or Process Heater
|
Item
|
Requirement
|
Section
|
Frequency
|
| Testing | Initial performance test is not required | 63.645(d) | |
| Monitoring | Monitoring of process heater/boiler is not required. | 63.644(a)(3) | |
| For vent systems with a bypass line that could divert a vent stream away from the control device, monitor presence of flow in bypass line OR | 63.644(c)(1) |
once/hr
|
|
| Inspect closure mechanism on valve to bypass line to ensure that it is maintained in the closed position. | 63.644(c)(2) |
once/month
|
|
| Reporting | Notification of Compliance Status (NCS) Identification of vent and method of compliance |
63.654(f)(1)(ii) |
once
|
| Semi-Annual Reports Periods when vent stream is diverted from the boiler or when monthly inspections show bypass line valve has been open |
|||
| Recordkeeping | Retain all information required to be reported for five years. | 63.654(i)(4) |
Table 3-1. Requirements
for Group 1 Storage Vessels Equipped With a Closed Vent System Routed
to a Flare
|
Item
|
Requirement
|
Section
|
Frequency
|
| Testing | A compliance determination, as specified in 63.11(b), is required for the flare. Include measurement/determination of the following: | 63.11(b) |
once
|
|
|||
| Inspection | Inspect closed vent system as specified in 63.148. | 63.148(c) |
once/year
|
| Reporting | Notification of Compliance Status (NCS) | ||
| Identification of vessel and method of compliance. | 63.654(f)(1)(i)(A) |
once
|
|
| Report results of performance test, including: | 63.654(f)(1)(i)(D) |
once
|
|
|
|||
| Periodic Reports | |||
|
Every 6 months |
||
|
63.654(g)(5)(i)(B) | Every 6 months | |
|
63.654(g)(5)(iii) | Every 6 months | |
| Notify Administer 30 days in advance of refilling storage vessel that has been emptied and degassed.a | 63.654(h)(2)(i) |
not specified
|
|
| Notify Administrator 30 days in advance of refilling storage vessel that has been emptied and degassed.a | 63.654(h)(2)(i) |
not specified
|
|
| Recordkeeping | Group 1 determination, vessel dimensions, analysis of capacity | 63.123(a) | |
|
Complete test report for initial test results |
63.654(i)(3)(ii) | ||
| Planned routine maintenance performed, including: | 63.123(f)(2) | ||
|
|
|||
|
63.654(i)(3)(iii) | ||
| Retain all information required to be reported for five years. | 63.654(i)(4) |
Table 3-2. Requirements
for Group 1 Storage Vessels Equipped With Closed Vent System Routed to
a Control Device Other Than a Flare
|
Item
|
Requirement
|
Section
|
Frequency
|
| Testing | For control device, design evaluation specified in 63.120(d)(1)(i) OR results of initial performance test described in 63.120(d)(1)(ii) | 63.120(d)(1) |
once
|
| Inspection | Inspect closed vent system as specified in 63.148. | 63.120(e)(5) |
Every 12 months
|
| Monitoring | Monitor parameter(s) proposed in the NCS to ensure that control device is being properly operated and maintained. | 63.120(d)(2) |
proposed in NCS
|
| Reporting | Notification of Compliance Status (NCS) | ||
| Identification of vessel and method of compliance | 63.654(f)(1)(i)(A) |
once
|
|
| Description of parameter(s) to be monitored to ensure proper operation and maintenance of control device; explanation of parameter selection; frequency of monitoring | 63.654(f)(1)(i)(B) |
once
|
|
| Design evaluation documentation specified in 63.120(d)(1)(i) OR | 63.654(f)(1)(i)(B) |
once
|
|
| Results of performance test, including: | 63.654(f)(1)(i)(B) |
once
|
|
|
|||
| Periodic Reports | |||
|
Every 6 Months |
||
|
63.654(g)(5)(i)(B) | Every 6 Months | |
|
63.654(g)(5)(ii) | Every 6 Months | |
| Notify Administrator 30 days in advance of refilling storage vessel that has been emptied and degassed.a | 63.654(h)(2)(i) |
not specified
|
|
| Recordkeeping | Group 1 determination, vessel dimensions, analysis of capacity | 63.123(a) | |
| Complete test report for initial performance test results | 63.654(i)(3)(ii) | ||
| Measured values of monitored parameters | 63.123(f)(1) | ||
|
Planned routine maintenance performed, including: |
63.123(f)(2) | ||
|
|||
|
63.654(i)(3)(iii) | ||
| Retain all information required to be reported for five years. | 63.654(i)(4) |
aNotification may be made less than 30 days
prior to inspection if inspection is unplanned [63.654(h)(2)(i)(B)]; State
or local permitting authority can waive notification requirement or grant
permission to refill sooner than 30 days after submission of notification
[63.654(h)(2)(i)(C)].
Table 3-3. Requirements
for Group 1 Storage Vessels Equipped With a Fixed Roof and an Internal
Floating Roof
|
Item
|
Requirement
|
Section
|
Frequency
|
| Inspection | Single seal system |
||
| Visually inspect internal floating roof and primary seal through hatches. | 63.120(a)(2)(i) | Every 12 months | |
| Double seal system | |||
| Visually inspect internal floating roof, primary and secondary seal each time vessel is emptied and degassed and at least every five years OR | 63.120(a)(3)(i) | Every 5 years | |
| Visually inspect internal floating roof and secondary seal through hatches AND | 63.120(a)(3)(ii) | Every 12 months | |
| Visually inspect internal floating roof, primary and secondary seal each time vessel is emptied and degassed and at least every 10 years. | 63.120(a)(3)(iii) | Every 10 years | |
| Monitoring | No monitoring requirements apply to these vessels. |
once/month
|
|
| Reporting | Notification of Compliance Status (NCS) | ||
| Identification of vessel and method of compliance | 63.654(f)(1)(i)(A) |
once
|
|
| Periodic Reports | |||
| Results of each inspection in which a failure is detected. For annual inspections, a failure is as defined in 63.654(g)(2)(i)(A). For internal inspections, a failure is as defined in 63.654(g)(2)(ii)(A). Include the following: | 63.654(g)(2) |
Every 6 Months
|
|
|
|||
| If extension is utilized, identify vessel, nature and date of repair or date storage vessel was emptied. | 63.654(g)(2)(i)(C) |
Every 6 Months
|
|
| Notify Administrator 30 days in advance of refilling storage vessel that has been emptied and degassed.a | 63.654(h)(2)(i) |
not specified
|
|
| Recordkeeping | Group 1 determination, vessel dimensions, analysis of capacity | 63.123(a) | |
| Retain record of each inspection performed. | 63.123(c) | ||
| If an extension is used, retain records required by 63.120(a)(4). | 63.123(g) | ||
| Retain all information required to be reported for five years. | 63.654(i)(4) |
Table 3-4. Requirements
for Group 1 Storage Vessels Equipped With an External Floating Roof
|
Item
|
Requirement
|
Section
|
Frequency
|
| Inspection | Single seal system: measure gaps between vessel wall and primary seal. | 63.120(b)(1)(ii) |
Once/year
|
| Double seal system: measure gaps between vessel wall and primary seal during hydrostatic testing. | 63.120(b)(1)(i) |
Every 5 years
|
|
| Double seal system: measure gaps between vessel wall and secondary seal. | 63.120(b)(1)(iii) |
once/year
|
|
| Visually inspect external floating roof, primary and secondary seals and fittings each time vessel is emptied and degassed. | 63.120(b)(10) |
none specified
|
|
| Monitoring | No monitoring requirements apply to these vessels. | ||
| Reporting | Notification of Compliance Status (NCS) | ||
| Identification of vessel and method of compliance | 63.654(f)(1)(i)(A) |
once
|
|
| Periodic Reports | |||
| Results of each seal gap measurement in which the requirements of 63.120(b)(3),(4),(5)or(6) are not met. Include the following: | 63.654(g)(3)(i) |
Every 6 Months
|
|
|
|||
| If extension is utilized, identify vessel, nature and date of repair or date storage vessel was emptied. | 63.654(g)(3)(ii) |
Every 6 Months
|
|
| Documentation of any failures, as defined in 63.654(g)(3)(iii)(A), identified during a visual inspection. Include the following: | 63.654(g)(3)(iii) |
Every 6 Months
|
|
|
|||
| Notify Administrator 30 days in advance of any gap measurement. | 63.120(b)(9) |
See Inspection
|
|
| Notify Administrator 30 days in advance of refilling storage vessel that has been emptied and degassed.a | |||
| Recordkeeping | Group 1 determination, vessel dimensions, analysis of capacity | 63.123(a) | |
| Retain record of each seal gap measurement, including date, raw data and calculations. | 63.123(d) | ||
| If an extension is used, retain records required by 63.120(a)(4). | 63.123(g) | ||
| Retain all information required to be reported for five years. | 63.654(i)(4) |
Table 4-1. Requirements
for Group 1 Wastewater Streams
|
Item
|
Requirement
|
Section
|
Frequency
|
| Testing | Comply with testing requirements found in 61.340 through 61.355 of 40 CFR part 61, subpart FF. If required, perform periodic measurement of benzene concentration in wastewater. There are no additional testing requirements. | 63.647(c) |
see 61.340 through 61.355
|
| Monitoring | Comply with the monitoring requirements found in 61.340 through 61.355 of 40 CFR part 61, subpart FF. If required, monitor process or control device operating parameters. There are no additional monitoring requirements.a | 63.647(c) |
see 61.340 through 61.355
|
| Reporting and Recordkeeping | Comply with provisions in 61.356 and 61.357 of 40 CFR part 61, subpart FF. There are no additional reporting or recordkeeping requirements.a | 63.654(a) |
see 61.340 through 61.355
|
| Retain all information required to be reported for five years. | 63.654(i)(4) |
Table 5-1. Requirements
For Refineries Complying with the Equipment Leaks Standards in § 63.648
by Implementing 40 CFR Part 60, Subpart VVa
|
Item
|
Requirement
|
Section
|
Frequency
|
| Testing | Method 21 shall be used to determine if equipment are leaking (leak definition = 10,000 ppmv THC for valves, pumps, heavy liquid leaks, and 500 ppmv THC for pressure relief valves and closed vent systems) and non-detectable emissions. | 60.485(b), (c) | |
| Monitoring | Using Method 21 | ||
|
1/month |
||
|
60.482-7(a), (b) | 1/monthc | |
|
60.482-4(a), (b) | after an overpressure release | |
|
60.482-8 | annually |
|
|
after a leak is observedd | ||
|
Visual |
60.482-2(a)(2) |
1/week
|
|
|
|
|||
|
Other |
60.482-3(d) and (e) |
check daily or equip sensor with an alarm |
|
|
|||
|
60.482-10(e) and (f) | no frequency specified | |
| Reporting | Initial Semi-Annual Report | 60.487(a) and (b) |
initially, and as changes are made
|
|
|||
|
Semi-Annual Reports |
60.487(c)(1) through (3) |
2 times/year
|
|
|
|
|||
|
Other reports |
|||
|
|
60.487(e) | as needed | |
|
60.487(e) | as needed | |
|
60.487(d) | as needed | |
| Recordkeeping |
|
initially & as changes made |
|
|
60.486(e)(2) | initially & as changes made | |
|
60.486(e)(3) | initially & as changes made | |
|
60.486(e)(4) | initially & as changes made | |
|
60.486(e)(5) | initially & as changes made | |
|
60.486(f)(1) and (2) | initially & as changes made | |
|
60.486(g)(1) and (2) | initially & as changes made | |
|
60.486(h)(1) and (2) | initially & as changes made | |
|
63.654(d)(3) | initially & as changes made | |
|
60.486(i)(1) | initially & as changes made | |
|
60.486(i)(2) | initially & as changes made | |
|
60.486(i)(2) | initially & as changes made | |
|
|||
|
60.486(d) | initially & as changes made | |
|
60.486(b) and (c) | during each monitoring period |
bDoes not apply if pump, valve, or compressor is demonstrated by Method 21 to operate at <500 ppm above background. Also, compressors in hydrogen service are exempt.
cMonitoring frequency is reduced with good performance.
dThere is no specified monitoring frequency, but if a leak is observed by visual, audible, olfactory, or other means, it must be monitored and repaired.
eThis requirement reflects a recent amendment (63 FR 44135) to the petroleum refineries NESHAP.
Table 5-2. Requirements
For Refineries Complying with the Equipment Leaks Standards in § 63.648
by Implementing 40 CFR Part 63, Subpart H
|
Item
|
Requirement
|
Section
|
Frequency
|
| Testing | Method 21 shall be used to determine if equipment are leaking. Leak definitions for valves and pumps are listed in table 2 of subpart CC. In phase I the leak definition is 10,000 ppmv. Lower leak definitions phase in over time, to a level of 2,000 ppmv for pumps and 1,000 ppmv for valves. Leak definitions are 2,000 ppmv for heavy liquid pumps, 1,000 ppmv for heavy liquid valves, connectors, and instrumentation systems and 500 ppmv for closed-vent systems and pressure relief devices. | 63.169, 63.165, 63.172, 63.180(b), (c); 63.648(c)(1) | |
| Monitoring |
Using Method 21 |
||
|
63.163(a) and (b) | once/monthb | |
|
63.648(c)(2) | once/monthb | |
|
63.165(a) and (b) | after overpressure release | |
|
63.172(f) | annuallyc | |
|
63.169 and 63.648(c)(5) | after a leak is observedd |
|
| Visual | 63.163(b)(3) |
once/week
|
|
|
|||
Other
|
|
check daily or equip sensor with an alarm
|
|
|
63.172 | no frequency specified | |
| Reporting | Notification of Compliance Status Report
|
63.182(c)(1) and 63.654(d) |
initially
|
| Semi-Annual Reports | 63.182(d)(1) and (2) |
twice/year
|
|
|
|||
|
63.182(d)(2)(xiv) |
||
|
63.182(d)(4) | ||
| Recordkeeping |
|
initially, and as changes are made |
|
|
63.181(b)(1)(ii) | initially, and as changes are made | |
|
63.181(b)(2)(i) | initially, and as changes are made | |
|
63.181(b)(2)(ii) | initially, and as changes are made | |
|
63.181(b)(3) | initially, and as changes are made | |
|
63.181(b)(4) | initially, and as changes are made | |
|
63.181(b)(6) | initially, and as changes are made | |
|
63.181(b)(7) | initially, and as changes are made | |
|
63.181(b)(8) | during each monitoring period | |
|
63.181(c) | during each monitoring period | |
|
63.181(d) and 63.162(f) | during each monitoring period | |
|
63.181(f) | as needed | |
|
63.181(g) | initially, and as changes are made | |
|
63.181(h) | during each monitoring period | |
|
63.181(i) | initially, and as changes are made | |
|
63.181(j) | initially, and as changes are made | |
|
63.654(d)(3) | initially, and as changes are made | |
|
63.654(d)(4) | initially, and as changes are made | |
|
63.654(d)(6) | initially, and as changes are made |
aDoes not apply if pump or valve is designated
as leakless or if pump, valve, or compressor is demonstrated by Method 21
to operate at <500 ppm above background. Also, compressors in
hydrogen service are exempt.
bMonitoring frequency is reduced with good performance.
cIf closed vent system is constructed of hard-piping, monitor
by Method 21 initially, and perform visual monitoring annually.
dThere is no specified monitoring frequency, but if a leak
is observed by visual, audible, olfactory, or other means, it must be
monitored and/or repaired.
Table 6-1. Requirements for Gasoline Loading Racks
| Item | Requirement | Section | Frequency |
| Testing and Monitoring | Comply with testing and monitoring requirements found in sections 63.421, 63.422(a) through (d), 63.425(a) through (c), 63.425(e) through (h), 63.427(a) and (b), and 63.428(b), (c), (g)(1) or (h)(1) through (h)(3) of 40 CFR part 63, subpart R. There are no additional testing or monitoring requirements. | 63.650(a) |
see referenced sections
|
| Reporting and Recordkeeping | Comply with reporting and recordkeeping requirements in 63.428(b) and (c), (g)(1), and (h)(1) through (h)(3) of 40 CFR part 63, subpart R. There are no additional reporting or recordkeeping requirements. | 63.654(b) |
see referenced sections
|
| Submit the initial notification report required in 63.428(a) with the Notification of Compliance Status for the refinery 150 days after the compliance date.a | 63.654(f) |
Once
|
|
| Retain all information required to be reported for five years. | 63.654(i)(4) |
Table 7-1. Requirements
for Marine Vessel Loading Operations
| Item | Requirement | Section | Frequency |
| Testing and Monitoring | Comply with testing and monitoring requirements found in sections 63.560 through 63.657 of 40 CFR part 63, subpart Y. There are no additional testing or monitoring requirements. | 63.651(a) |
see referenced sections
|
| Reporting and Recordkeeping | Comply with recordkeeping and reporting requirements sections 63.566 and 63.567(a) and 63.567(c) through (i) 40 CFR part 63, subpart Y. There are no additional reporting or recordkeeping requirements. | 63.654(c) |
see referenced sections
|
| The Initial Notification Report under section 63.567(b) is not required. | 63.651(c) | ||
| Retain all information required to be reported for five years. | 63.654(i)(4) |
![[logo] US EPA](http://www.epa.gov/epafiles/images/logo_epaseal.gif)