Jump to main content.


Tijuana Parallel Conveyance System Project

Finding of No Significant Impact
and
Final Environmental Assessment

EPA Region 9 is proposing to authorize the use of North American Development Bank funds to: (a) construct a wastewater conveyance system parallel to the existing system in Tijuana; (b) expand the San Antonio de los Buenos Wastewater Treatment Plant at Punta Bandera (Baja California); and (c) provide a connection from the International Wastewater Treatment Plant in San Diego to the conveyance system in Tijuana.

After considering comments received on the draft EA prepared for the project, the EPA has determined that the project will not have significant, unmitigable impacts on the environment and has issued a Finding of No Significant Impact (FNSI) for the project. The EPA has also issued a final Environmental Assessment (EA) that includes the EPA's response to comments received on the draft EA.


Local Navigation


Jump to main content.