Jump to main content.


Phase II—Large existing electric generating plants

Note: EPA no longer updates this information, but it may be useful as a reference or resource.


Proposed Rule

Case Study Analysis for the Proposed Section 316(b) Phase II Existing Facilities Rule

The Case Study Analysis for the Final Rule is available.

You will need Adobe Reader to view some of the files on this page. See EPA's PDF page to learn more.

Part A: Evaluation Methods

Part B: The Delaware Estuary Watershed Case Study

Part C: The Ohio River Watershed Case Study

Part D: The Tampa Bay Watershed Case Study

Part E: San Francisco Bay/Delta Estuary Case Study

Part F: Brayton Point Station Facility Case Study

Part G: Seabrook and Pilgrim Facilities Case Study

Part H: J.R. Whiting Facility Case Study

Part I: Monroe Facility Case Study

Glossary and References (PDF) (324 K, 63 pp.)

Effluent Guidelines | Analytical Methods


Local Navigation


Jump to main content.