Jump to main content.

130 Cedar Street

130 Cedar Street is a 12-story building located at the corner of Cedar and Washington Streets, just south of the World Trade Center site. The work on the 145,428 square foot building will consist of abatement, limited deconstruction/demolition of portions of the building, and exterior/interior construction.

Any current information made available electronically by the owner regarding the activities to be conducted at 130 Ce

dar Street can be found below

Community Monitoring Results for the 130 Cedar Street Project

Date Document
August 2007 Revised Appendices F through L [PDF 6 MB, 103 pp]
August 2007

Revised Specifications for the Abatement and Selective Demolition [PDF 348 KB, 27 pp]
Amendment 1 [PDF 787K, 8 pp]
Amendment 2 [PDF 1K, 1 pp]
NewAmendment 3 [PDF 517K, 8 pp]

Amendment 6 [PDF 360K, 5 pp]
Amendment 7 [PDF 150K, 4 pp]
Amendment 8 [PDF 183K, 5 pp]

August 2007 Revised Quality Assurance Program Plan [PDF 1.6 MB, 91 pp]
August 2007

Revised Specifications for the Community Air Monitoring [PDF 470 KB, 18 pp]
Amendment 1
[PDF 100K, 2 pp]

August 2007 Acceptance Letter for Revisions to the Specifications for the Abatement and Selective Demolition and the Community Air Monitoring [PDF 34 KB, 2 pp]
August 2007 Comments on Draft Revisions to the Specifications for the Abatement and Selective Demolition [PDF 98 KB, 7 pp]
July 2007 Comments on Draft Revisions to the Specifications for the Community Air Monitoring [PDF 242 KB, 6 pp]
July 2007 Comments on Draft Revisions to the Specifications for the Abatement and Selective Demolition [PDF 250 KB, 9 pp]
June 2007 Revised Appendices A through E [PDF 3.1 MB, 36 pp]
April 2007 Approval of Variance Application [PDF 109 KB, 1 pp]
April 2007 Acceptance Letter [PDF 555 KB, 3 pp]
March 2007 Specification for the Removal of the Building from Containment [PDF 160 KB, 4 pp]
March 2007 Specification for Community Air Monitoring [PDF 384 KB, 14 pp]
March 2007 Health and Safety Plan [PDF 183 KB, 16 pp]
March 2007 Emergency Action Plan [PDF 135 KB, 7 pp]
March 2007 Waste Sampling and Management Plan [PDF 184 KB, 19 pp]
March 2007 Quality Assurance Program Plan [PDF 1.8 MB, 66 pp]
April 2007 Specification for Abatement and Selective Demolition [PDF 352 KB, 30 pp]
March 2007 Appendices A through E: Exterior Hard Wall Containment Barrier Option 1 [PDF3.4 MB, 34 pp]
April 2007 Appendices F through K: Site Logistics Plan [PDF6.7 MB, 94 pp]
January, 2007 Comments on Draft Plan for Abatement and Selective Demolition of 130 Cedar Street [PDF 265 KB, 30 pp]
October/December 2006 Draft Plan for Abatement and Selective Demolition of 130 Cedar Street [PDF 4.8 MB, 167 pp]
May 2005 EPA Letter to JLC Environmental Consultants, Inc. [PDF 132 KB, 12 pp]
January 2005 Air Sampling and Monitoring Protocol [PDF 111 KB, 8 pp]
December 2004 JLC's Asbestos Inspection at 130 Cedar Street [PDF 76 KB, 2 pp]
July, 2004 Asbestos and Lead-Based Paint Survey Report [PDF 288 KB, 50 pp]
July 2004 Asbestos Abatement Technical Specifications [PDF 252 KB, 71 pp]
June 2004 Façade Demo [PDF 81 KB, 1 pp]
May 2004 Lead Based Paint Removal Specifications [PDF 140 KB, 22 pp]
-- 130 Cedar Street Façade Area [PDF 49 KB, 2 pp]


Jump to main content.