The building at 30 West Broadway, known as Fiterman Hall, was used as
a classroom building by the City University of New York (CUNY) Borough
of Manhattan Community College (BMCC) classroom building prior to September
11, 2001. The building was undergoing a gut-rehab that was nearly complete
on September 11, 2001. It is a 1950s-era 370,000 square foot, fifteen
story steel and concrete structure. The building is currently vacant.
It is the intent of CUNY and the Dormitory Authority of the State of
New York to first abate and decontaminate the building and then demolish
it. The plan is to replace the building with a new classroom building
similar in size to Fiterman Hall.
Any current information made available electronically by the owner regarding
the activities to be conducted at the building can be found on the Borough of Manhattan Community College Web site
.
| Date |
Document |
March 2008 |
Final EPA Acceptance of “Remediation Phase” Documents for Fiterman Hall at 30 West Broadway, New York, NY [PDF 310K, 2 pp]
Final DOL Acceptance of “Remediation Phase” Documents for Fiterman Hall at 30 West Broadway, New York, NY [PDF 32K, 1 pp] |
| February 2008 |
Comments on Draft January 2008 “Remediation Phase” Documents for Fiterman Hall at 30 West Broadway, New York, NY [PDF 356K, 17 pp] |
| December 2007 |
Comments on Draft November 2007 “Remediation Phase” Documents for Fiterman Hall at 30 West Broadway, New York, NY [PDF 2.8 MB, 14 pp]
Comments on Asbestos/WTC Dust Portion of
Regulatory Submittal Part I(R) Remediation Work Plan [PDF 84K, 5 pp] |
| October 2007 |
Comments on Draft “Remediation Phase” for
Fiterman Hall at 30 West Broadway, New York, NY [PDF 318K, 18 pp] |
| May 2007 |
Comments on Draft “Remediation Phase” for
Fiterman Hall at 30 West Broadway, New York, NY [PDF 298K, 26 pp] |
| March 2007 |
Fiterman Hall: Final Scaffold Erection Operation Acceptance [PDF 132K, 4 pp]
The final scaffold erection operation documents can be found on the Borough of Manhattan Community College Web site.
|
| December 2006 |
Fiterman Hall Comment Letter - Scaffold Erection Operation (SEO [PDF 349K, 31 pp]
The draft Scaffold Erection Operation documents can be found on the Lower Manhattan Web site
|
| April 2006 |
Fiterman Hall Comment Letter [PDF 374K, 36 pp] |
| August 2005 |
CUNY Letter to EPA [PDF 5.5 MB, 2 pp] |
| January 2006 |
January 2006 Draft Submittal
- Fiterman Cover Letter [PDF 66K, 2 pp] (January 12, 2006)
- Facade Characterization Report [PDF 541K, 18 pp] (January 10, 2006)
- Environmental Characterization Report [PDF 4.72 MB, 56 pp] (January 10, 2006)
- Part I - Work Plan [PDF 460K, 22 pp] (January 10, 2006)
- Part II - Environmental Community Air Monitoring Program [PDF 478K, 15 pp] (January 10, 2006)
- Part III - Health & Safety Plan [PDF 462K, 53 pp] (January 10, 2006)
- Part IV - Waste Sampling and Management Plan [PDF 857K, 25 pp] (January 10, 2006)
|
All of the aforementioned electronic documents are also available for
viewing at EPA's New York Library on the 16th floor.