Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 32
- Asbestos Total results: 141
- Coronavirus (COVID-19) Total results: 125
- Emergency Planning and Community Right-to-Know Total results: 303
- Fuel Program Total results: 804
- Lead Total results: 351
- MOVES Total results: 56
- Norwood Landfill Site Total results: 30
-
Oil Regulations
Total results: 107
- 40 CFR Part 110 Discharge of Oil Regulation Total results: 9
-
40 CFR Part 112 Spill Prevention, Control, and Countermeasure Rule
Total results: 75
- 112.7 General Requirements Total results: 17
- 112.8 Specific Onshore Requirements (Excluding Production) Total results: 3
- 112.1 Applicability Total results: 26
- 112.2 Definitions Total results: 13
- 112.3 Requirement to Prepare an SPCC Plan Total results: 3
- 112.6 Qualified Facilities Total results: 5
- Miscellaneous SPCC Total results: 8
- 40 CFR Part 112.20 Facility Response Plans Total results: 19
- 40 CFR Part 300 Subpart J Total results: 1
- Miscellaneous Oil Total results: 3
- Radiation Total results: 120
- RadNet Total results: 33
- Risk Management Program (RMP) Total results: 286
Active filters:
Remove all filtersDisplaying 1 - 15 of 20 results
-
Secondary containment for oil-filled operation equipment under SPCC
On December 26, 2006, EPA provided an optional alternative to the general secondary containment requirements in 40 CFR §112.7(c) for qualified oil-filled operational equipment (71 FR 77266). Because the alternative is optional, an owner or operator could choose to comply with the existing SPCC
- Last published:
-
How do the changes in the 2006 Amendments apply to mobile refuelers?
Mobile refuelers are now exempt from the following sized secondary containment provisions that still apply to all other bulk storage containers and mobile/portable bulk storage containers: • Sections 112.8(c)(2) and (11) for petroleum oils • Sections 112.12(c)(2) and (11) for animal fats and
- Last published:
-
SPCC requirements for transfer areas associated with exempt USTs
Gas stations typically are not subject to the SPCC Rule because completely buried storage tanks subject to 40 CFR Part 280 or 281 are exempt per §112.1(d)(4). However, a gas station would be subject to the SPCC Rule if it has more than 1,320 gallons of oil in aggregate above ground storage capacity
- Last published:
-
Do the changes in the 2006 Amendments apply to oil-filled manufacturing equipment?
No. The amendment does not change any requirements for oil-filled manufacturing equipment. Oil-filled manufacturing equipment remains subject to the SPCC requirements (including those for containment), but an owner/operator may determine that secondary containment is impracticable and comply with
- Last published:
-
SPCC Rule schedules for inspections, tests, and evaluations
The SPCC rule requires inspections, tests, and evaluations of above ground containers (40 CFR §112.8(c)(6)). Does the rule set schedules for how often these need to be conducted? The SPCC Rule does not prescribe a specific frequency or methodology for performing the required inspections, evaluations
- Last published:
-
What is an oil spill contingency plan?
Instead of providing secondary containment for qualified oil-filled operational equipment, an owner or operator may prepare an oil spill contingency plan and a written commitment of manpower, equipment, and materials to quickly control and remove discharged oil. He/she must also have an inspection
- Last published:
-
Secondary containment requirements for mobile refuelers
What secondary containment requirements apply to mobile refuelers? General secondary containment requirements in §112.7(c) still apply to mobile refuelers at SPCC regulated facilities. General secondary containment should be designed to address the most likely discharge from the container and from
- Last published:
-
Are mobile refuelers exempt from integrity testing requirements?
Pursuant to 40 CFR §112.8(c)(2), mobile refuelers are exempt from the secondary containment requirements for bulk storage containers. Are mobile refuelers also exempt from the requirements for integrity testing in §112.8(c)(6)? Since mobile refuelers are mobile or portable bulk storage containers
- Last published:
-
Can qualified facilities also use the alternative requirements for qualified oil-filled operational equipment?
Yes. Facilities that meet the criteria for qualified facilities and qualified oil-filled operational equipment may benefit from both of the alternative approaches. Since an impracticability determination is not necessary for qualified oil-filled operational equipment, the owner/operator can self
- Last published:
-
Eligibility for qualified oil-filled operational equipment in event of a discharge
Does a facility automatically lose eligibility for the option for qualified oil-filled operational equipment if the equipment has an oil discharge? No. Facilities that choose this alternative and later have a reportable oil discharge from qualified oil-filled operational equipment do not
- Last published:
-
Secondary containment calculations in SPCC Plan
The SPCC regulations in 40 CFR §112.7(c) require facilities to provide appropriate containment or diversionary structures or equipment to prevent discharges as described in §112.1(b). Does a facility's SPCC Plan have to include calculations to demonstrate compliance with the §112.7(c) general
- Last published:
-
What are the specifications for bulk storage secondary containment systems?
For purposes of the SPCC requirements, "secondary containment for bulk storage facilities must be constructed to at least provide for the capacity of the largest single tank with sufficient freeboard for precipitation. EPA believes that the proper standard of "sufficient freeboard" to contain
- Last published:
-
What are the amended requirements for oil-filled operational equipment?
Instead of providing secondary containment for qualified oil-filled operational equipment, an owner or operator may prepare an oil spill contingency plan and a written commitment of manpower, equipment, and materials to quickly control and remove discharged oil. He/she must also have an inspection
- Last published:
-
Inspection or monitoring program requirements when using alternative secondary containment for oil-filled operational equipment
Instead of providing secondary containment for qualified oil-filled operational equipment, an owner or operator may prepare an oil spill contingency plan and a written commitment of manpower, equipment, and materials to quickly control and remove discharged oil. He/she must also have an inspection
- Last published:
-
Are facilities required to use the option for qualified oil-filled operational equipment?
No. This is an alternative way to comply with the SPCC requirements. An owner or operator can choose to comply with the general requirements to provide secondary containment for each piece of oil-filled operational equipment.