Frequent Questions
Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 32
- Asbestos Total results: 141
- Coronavirus (COVID-19) Total results: 125
- Emergency Planning and Community Right-to-Know Total results: 304
- Fuel Program Total results: 804
- Lead Total results: 351
- MOVES Total results: 56
- Norwood Landfill Site Total results: 30
-
Oil Regulations
Total results: 107
- 40 CFR Part 110 Discharge of Oil Regulation Total results: 9
-
40 CFR Part 112 Spill Prevention, Control, and Countermeasure Rule
Total results: 75
- 112.7 General Requirements Total results: 17
- 112.1 Applicability Total results: 26
- 112.2 Definitions Total results: 13
- 112.3 Requirement to Prepare an SPCC Plan Total results: 3
- 112.6 Qualified Facilities Total results: 5
- 112.8 Specific Onshore Requirements (Excluding Production) Total results: 3
- Miscellaneous SPCC Total results: 8
- 40 CFR Part 112.20 Facility Response Plans Total results: 19
- 40 CFR Part 300 Subpart J Total results: 1
- Miscellaneous Oil Total results: 3
- Radiation Total results: 120
- RadNet Total results: 33
- Risk Management Program (RMP) Total results: 286
Displaying 16 - 17 of 17 results
-
What is included in the written commitment of resources?
Instead of providing secondary containment for qualified oil-filled operational equipment, an owner or operator may prepare an oil spill contingency plan and a written commitment of manpower, equipment, and materials to quickly control and remove discharged oil. He/she must also have an inspection
- Last published:
-
When could active containment measures be appropriate for mobile refuelers?
Active containment measures require deployment or other specific action by the owner or operator. For discharges that occur only during manned activities, such as transfers, an active measure may be appropriate, as long as the measure can contain the volume and rate of oil, is properly constructed
- Last published: