Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 32
- Asbestos Total results: 141
- Coronavirus (COVID-19) Total results: 125
- Emergency Planning and Community Right-to-Know Total results: 304
- Fuel Program Total results: 804
- Lead Total results: 351
- MOVES Total results: 56
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 107
- Radiation Total results: 120
- RadNet Total results: 33
- Risk Management Program (RMP) Total results: 286
Displaying 1 - 15 of 2635 results
-
If your farm does not have fuel storage that will flow into US waters by a ditch, river, stream, or lake, do you have to prepare a SPCC Plan?
No. EPA suggests you use a common sense approach. If one of your oil storage tanks leaks, and the spilled oil would not flow into navigable waters or adjoining shorelines, you do not have to prepare a Plan. Remember that you still have the responsibility to clean up any spilled oil and a containment
- Last published:
-
Oil-filled equipment capacity
When counting against the 1,320 aboveground storage capacity threshold, would operational storage of oil (such as in a hydraulic press) be used? Oil which is contained in equipment is required to be factored into the storage capacity for the facility even though the oil may be only used for
- Last published:
-
Underground Storage Tanks in SPCC Plans
If a gas station that has less than 42,000 gallons completely buried oil storage capacity and no aboveground oil storage capacity installs a new aboveground tank with a capacity greater than 1,320 gallons, must the facility’s Spill Prevention, Control, and Countermeasure (SPCC) Plan address the
- Last published:
-
Examples of an agent of a Professional Engineer
Except as provided in 40 CFR §112.6 for qualified facilities, a Professional Engineer (PE) or an agent of the PE must visit and examine the facility before the PE certifies an SPCC Plan (40 CFR §112.3(d)). What are some examples of an agent of a PE? An agent of a PE might include an engineering
- Last published:
-
What is a farm for purposes of the SPCC Rule?
In the December 2006 amendments to the SPCC Rule, EPA defined a farm as "a facility on a tract of land devoted to the production of crops or raising of animals, including fish, which produced and sold, or normally would have produced and sold, 1,000 or more of agricultural products during a year."
- Last published:
-
Secondary containment for oil-filled operation equipment under SPCC
On December 26, 2006, EPA provided an optional alternative to the general secondary containment requirements in 40 CFR §112.7(c) for qualified oil-filled operational equipment (71 FR 77266). Because the alternative is optional, an owner or operator could choose to comply with the existing SPCC
- Last published:
-
Visit and examination requirements for SPCC self-certification
Pursuant to 40 CFR §112.6, the owner or operator of a facility that meets the criteria in §112.3(g) for either a Tier I or Tier II qualified facility may self-certify the facility's SPCC Plan. As part of the self-certification, the owner or operator must certify that he or she has visited and
- Last published:
-
How often does a facility need to complete an oil spill response training under the FRP requirements?
Facilities subject to the Facility Response Plan (FRP) regulations in 40 CFR Part 112, Subpart D are required to develop a facility response training program to train those personnel involved in oil spill response activities (§112.21(b)). How often does a facility need to complete an oil spill
- Last published:
-
When must I report an oil discharge to NRC?
Any person in charge of a vessel or an onshore or offshore facility must notify the National Response Center (NRC) immediately after he or she has knowledge of the discharge.
- Last published:
-
Process identification and distance between vessels
How far apart do separate vessels have to be to be considered different processes? There is no hard and fast rule for how great this distance should be before you do not need to consider the vessels as part of one process. Two vessels at opposite ends of a large warehouse room might have to be
- Last published:
-
Should tank capacity be considered when determining thresholds?
When determining whether a threshold amount of a regulated substance is present in a process (e.g., a tank), must the owner or operator of a stationary source consider the total capacity of the process, or the actual amount of regulated substance contained in the process? The threshold determination
- Last published:
-
Updating RMP if EPA lists a new substance
What if EPA lists a new substance? You will have three years from the date on which the new listing is effective to come into compliance for any process that is covered because EPA has listed a new substance.
- Last published:
-
What if the quantity in the process fluctuates?
What if the quantity in the process fluctuates? I may not have a threshold quantity now, but I will intermittently exceed the threshold quantity. You do not need to comply with the rule and file an RMP unless you have more than threshold quantity in a process; however, once you have more than
- Last published:
-
What does "same industrial group" mean?
Operations at a site that belong to the same three-digit North American Industry Classification System (NAICS) code prefix (which has replaced the old SIC codes) belong to the “same industrial group. In addition, where one or more operations at the site serve primarily as support facilities for the
- Last published:
-
Why are industries exempt under OSHA's PSM subject to RMP?
The Program 3 prevention program requirements under 40 CFR Part 68 are almost identical to the requirements of OSHA's process safety management (PSM) standard. OSHA exempts certain industries from the PSM standard. Why does EPA not exempt those same industries from the CAA §112(r) risk management
- Last published: