We've made some changes to EPA.gov. If the information you are looking for is not here, you may be able to find it on the EPA Web Archive or the January 19, 2017 Web Snapshot.

Fact Sheet No. 11 Pilot Study at Grenada Stamping

EPA directed Grenada Manufacturing, LLC (Facility) to install a long-term treatment system to further reduce levels of trichloroethene (TCE) inside the manufacturing building (commonly known as Grenada Stamping and currently operated by Ice Industries). TCE contamination is believed to be present beneath the Facility as a result of spills from prior operations. Sampling since October 2016 shows TCE vapors from beneath the slab are rising into the building and may pose a risk to workers.

You may need Adobe Reader to view files on this page. See EPA’s About PDF page to learn more.