PA IROQUOIS PIPELINE CO. TO PAY SECOND LARGEST ENV. PEN. EVER
Release Date:  5/24/96
Contact Information:  
PA IROQUOIS PIPELINE CO.  TO PAY SECOND LARGEST ENV.  PEN.  EVER 
FOR RELEASE: THURSDAY, MAY 23, 1996 
IROQUOIS PIPELINE CO.  TO PAY SECOND-LARGEST ENVIRONMENTAL PENALTY EVE= R=20
-- $22 MILLION FOR CLEAN WATER ACT VIOLATIONS=20 
In one of the largest environmental criminal investigations in= =20
U.S.  history, the U.S.  Environmental Protection Agency and the U.S.= =20
Department of Justice announced today that the Iroquois Pipeline=20 Operating Co.  and four of its top corporate officials and field=20 supervisors have pleaded guilty to violations of the Clean Water Act= =20
(CWA).  The case, involving construction of a natural gas pipeline= =20
=66rom Ontario to Long Island, is the second largest environmental= =20
prosecution and enforcement action conducted by the United States,= =20
exceeded only by the $1 billion Exxon Valdez settlement.  Among other= =20
violations, the company degraded scores of wetlands and streams durin= g=20
construction activities. 
Under the terms of the settlement, the company will be required= =20
to clean up 30 wetlands and streams damaged during the construction o= f=20
a gas pipeline that runs underground from Ontario to Long Island, and= =20
pay a total of $22 million in criminal fines and civil penalties for= =20
knowingly violating a number of environmental and safety provisions o= f=20
the pipeline construction permit, $2.5 million of which will be used= =20
to create additional wetlands.
=20
"This criminal prosection shows that the Clinton Administration = -
- ° and the public it serves -- will not tolerate those who try to gain= =20
an economic advantage through pollution," said Carol M. Browner, EPA= =20
Administrator. "The company illegally cut corners in disregard of= =20
the potential harm to both the environment and public safety. They=
=20
U.S. District Court for the Northern District of New York, in=20 Syracuse. Iroquois will pay a $15 million CWA criminal fine, a $5= =20
million civil CWA penalty, and an additional $2 million in restitutio= n=20
to the state of New York for violating the state permit. In addition= ,=20
due to its criminal admissions, the company will be unable to pass on= =20
to consumers in the form of higher rates another $20 million directly= =20
or indirectly related to the construction of the pipeline.
The four company officials and supervisors, who individually=20 pleaded guilty to various counts of negligently violating the CWA, ar= e=20
subject to a maximum of one year in jail and a $100,000 fine.=20 Depending on the extent of their cooperation in the continuing=20 investigation, the federal government will ask the Court to sentence= =20
cooperating defendants to six months of incarceration to be served in= =20
home confinement.
One of the felony counts to which the company pleaded guilty = =20
involved its failure to clean up or otherwise restore 188 streams and= =20
wetlands. The construction permit issued by the U.S. Army Corps of= =20
Engineers required Iroquois to backfill soil excavated during the= =20
laying of the pipeline and restore all adversely affected wetlands= =20
=0C=00
along the right-of-way. However, the company left many mounds of soi= l=20
standing within the wetlands. This not only interrupted the overall= =20
circulation of waters within those wetlands, but also reduced their= =20
size, damaged aquatic life, and eliminated stream bottom habitat. = =20
After the company learned that it was the object of a federal crimina= l=20
investigation, it went back and began to restore a number of those= =20
affected streams and wetlands.=20
=20
The company also pleaded guilty to having failed to construct= =20
safety devices called "trench breakers" at regular intervals along th= e=20
pipeline ditch and at the edge of wetlands. These devices control soi= l=20
erosion and corrosion of the pipeline by stopping water from migratin= g=20
along the pipeline, especially where the terrain slopes. The failure= =20
to install the required number of breakers within the trench could= =20
have washed out the soil which holds the pipeline securely in place. = =20
The absence of the breakers adjacent to wetlands could cause=20 significant ecological damage by reducing their ability to retain= =20
water.=20
=20
In addition to the restoration of the 30 damaged wetlands, $2.5= =20
million of the fines paid by the company will go to the National Fish= =20
and Wildlife Foundation to create additional wetlands in the vicinity= =20
of the pipeline. The company also will be required to continually= =20
monitor the pipeline to make sure that no safety or related problems= =20
result from the improper placement of large rocks inside the trench= =20
when the pipeline was buried. Rocks greater than 18 inches in=20 diameter, discovered in the pipeline trench during the criminal=20 investigation, could dent the pipeline and eventually cause it to= =20
rupture.=20
Construction of the 370 mile long pipeline, which crossed more= =20
than 500 rivers, streams and wetlands, took place between=20 May 1991 and January 1992. The two-year federal investigation was= =20
conducted by the Criminal Investigation Division of the U.S.=20 Environmental Protection Agency, the Federal Bureau of Investigation,= =20
the U.S. Army, the U.S. Department of Energy, and the Federal Energy= =20
Regulatory Commission, the U.S. Department of Transportation, and the= =20
New York State Public Service Commission and Department of=20 Environmental Conservation.=20
(A fact sheet on the investigation and prosecution is attached.)
R-72 ###
FACT SHEET
UNITED STATES v. THE IROQUOIS PIPELINE OPERATING COMPANY
=20
The EPA investigation was headed by EPA Special Agent Paul E. B= ouffard of the Syracuse Domicile Office of=20 the Criminal Investigation Division's New York Area Office. For furt= her information, contact William V. Lometti,=20 Special Agent in Charge, New York Area Office at 212-637-3610.=20 =0C=00
I. THE DEFENDANTS:
-   1. Iroquois Pipeline Operating Company: A company who on behal= f of Iroquois Gas =20 Transmission System LP constructed a natural gas pipeline which exten= ded =20 approximately 370 miles from Ontario, Canada, to Long Island, NY. 
2. Robert Reid: Former President of Iroquois Pipeline Operatin= g Company.
3. John Mackenzie: Former Manager of Engineering and Construct= ion at Iroquois =20 Pipeline Operating Company.
4. Michael Saley: Former Spread One construction Supervisor at= Iroquois Pipeline =20 Operating Company.
5. Carl Addison: Former Spread two Construction Supervisor at = Iroquois Pipeline =20 Operating Company. II. LOCATION OF THE CRIME/VIOLATIONS
In June, 1991, Iroquois commenced construction of a 370 mile pip= eline for the purposes of transporting=20 natural gas from Ontario, Canada to Long Island, NY. The pipeline c= rossed well in excess of 500 rivers, streams=20 and wetlands throughout New York and Connecticut with construction pe= rmits being issued by the U.S. Army Corps of=20 Engineers and the Federal Energy Regulatory Commission.
It should be noted that said permits mandated specific steps to = avoid damage to the environment and to=20 foster prompt and proper clean-up of he pipeline right-of-way upon th= e immediate culmination of construction=20 activities. The pipeline was completed in its entirety in January, 1= 992 and the gas began to flow to respective=20 buyers, however it was discovered that construction had not proceeded= pursuant to the permits/law.
As an overview, the four felony violations of the Clean Water Ac= t to which Iroquois plead guilty=20
encompasses three categories of violations:
=09 1) The failure to clean up or otherwise restore numerous = streams and wetlands (188 in total);
=09 2) The failure to install innumerable trench breakers (a = construction device preventing water=20 from migrating down the pipe trench on slopes and wash= ing out soil support; and
=09 3) The failure to install trench breakers at the edges of= wetlands (to insure construction=20
activities did not upset the natural aquatic containme= nt commonly found in wetlands.
The criminal investigation substantiated 188 streams and wetland= s which Iroquois is acknowledging through=20 its plea that it failed to restore. It should be noted however that = an additional 30 wetlands have been identified=20 via investigation/search warrants and these sites were also improperl= y restored as required by the COE permit.
III. MONETARY SANCTIONS AND REQUIRED REMEDIAL ACTIVITY
A. Iroquois Pipeline Operating Company
Financial Penalties
The Company will pay a total of $22 Million in criminal fines and ci= vil penalties. Of that total, $18 million=20 will go to the Federal Government and $4 million will go to the State= of New York as follows:
=20
-   1. $15 million dollars will be paid to the United States = as a criminal fine; $1.5 million of this sum=20 =0C=00
will be suspended on the condition that it is pled as restitution to = the State of New York; =20
2. Iroquois will pay to the United States a civil penalty = of $2.5 million dollars with an additional=20 $2.5 million going the National Fish and Wildlife Foundation for the = creation of wetlands in the vicinity of the=20 pipeline; $500,000.00 of these sums will also be suspended on the co= ndition that it is paid to New York State as=20 restitution; and
=20
3. Iroquois will pay to New York $ 4 million dollars ($2 m= illion of which of comes from the Federal=20 fines and penalties) for restitution of violations of Iroquois' state= permit.
=20
In addition to the criminal fines and civil penalties, the Unite= d State anticipates that Iroquois will be=20 unable to pass on to consumers another approximately $20 million doll= ars directly or indirectly related to the=20 construction of the pipeline. Environmental and Safety Remedial Measures
The criminal, civil and administrative dispositions require Iroqu= ois to take specific steps to correct the=20 problems uncovered during the criminal investigation . The company wi= ll be required to cleanup 30 streams and=20 wetlands damaged during the construction of the pipeline. (The compan= y had already restored a number of steams and=20 wetlands after having learned that it was the object of a criminal in= vestigation)..
The Company also must conduct continual monitoring of the pipelin= e to insure that there are no safety or=20 related problems caused by the improper placement of large rocks in t= he pipeline trench and the failure to install=20 numerous trench breakers.
=20
B. Individuals
Plea agreements have been negotiated with four individuals, spec= ifically the former IGTS Manager of=20
Engineering, former IGTS President, and two former IGTS Construction = Supervisors. The IGTS Managers have each=20 agreed to plead guilty to a three (3) count information charging each= with negligent violations of the Clean Water=20 Act (33 U.S.C. =A71319 (c) (1)) with sentences of home confinement fo= r a period of six months. The Construction=20 Supervisors have each plead guilty to one count of negligently violat= ing the Clean Water Act with a six-month home=20 confinement being ordered. Such home confinement is contingent on th= eir cooperation in the prosecution of any=20 other persons charged in connection with this investigation.
It should be noted that the above referenced pleas draw a conclu= sion to a portion of this investigation.
IV. SUMMARY OF EVENTS:
May, 1992: U.S. Attorney's Office, Northern District of New York open= s a criminal investigation of Iroquois=20 Gas Transmission System in response to knowing violations o= f 404 permit within upstate, NY. =20
Initial allegations provided by a NY State DEC Officer.
June 11-12: Simultaneous search warrants were executed at 1992 offi=
ces of Iroquois Gas =20
Transmission System at Shelton, Connecticut and Utica, NY. =
A voluminous =20
amount of records were seized by FBI and EPA-CID agents.
1993: =09 Investigators from EPA-CID and the FBI initiate interviews= of witnesses, review documents and=20
permits and serve Grand Jury subpoenas in an effort to dete= rmine the full scope and magnitude of=20 the criminal allegations/violations at hand. =0C=00
Sept/Oct: The U.S. Attorney's Office, N.D.NY requests/receives 1994= investigative support =20 from other law enforcement agencies (U.S. Army-CID and Departm=
ent of =20
Energy-OIG) to fully support further anticipated search warrants and =
the =20
voluminous document review of seized records from Utica, NY and Shelt=
on, =20
Connecticut.
October 17-21: During this time period the second Iroquois search =
warrant was =20
executed by Federal Investigators. Included in the s=
earch were 22 selected =20
wetland sites were visited in an effort to substantiate th=
e non-existence of trench =20
breakers and clay plugs at the edges of wetlands. The warrant=
allowed for =20
digging in close proximity to the pipeline at the edges of wetlands =
and said =20
action fully demonstrated a pattern of non-compliance with the COE pe=
rmit due to the=20
lack of the mandated plugs/breakers. It should be noted that the exe=
cution of this=20
warrant lead to the initial discovery of large rocks in the pipeline = trench.
Oct. 31-
Nov 3, 1994: During this time period the third Iroquois search warra=
nt was executed by Federal =20
investigators. Numerous wetlands/streams were appropriately docu=
mented as not being=20
properly restored after the construction of the pipeline. The specif=
ic details of=20
Iroquois' inappropriate wetlands restoration was fully documented by =
COE wetlands=20
enforcement personnel.
Early 1995: Joint IGTS Investigative Task Force established.
Summer/
Fall: Iroquois is ordered by the N.Y. State Public Ser=
vice Commission to initiate =20
numerous excavations along the pipeline in response t=
- ° safety concerns that large =20 rocks were backfilled in the trench.  Federal investigators a= ccompany IGTS staff =20 on these digs and documented numerous violations of large rocks in th= e backfill some=20 of which were in direct contact with this "hot" pipeline. 
=09 =09 =09 ###
 Search this collection of releases | or search all news releases
Search this collection of releases | or search all news releases
 
 View selected historical press releases from 1970 to 1998 in the EPA History website.
View selected historical press releases from 1970 to 1998 in the EPA History website.

 
 