Laws & Regulations
-
Report: Report of Investigation: Whistleblower Reprisal Investigation
Report of Investigation: Whistleblower Reprisal Investigation
-
Water Quality Standards Regulations: Virginia
Information related to Water Quality Standards for Virginia.
-
Building Codes and Standards for Radon-Resistant New Construction (RRNC)
This page provides a variety of building codes that address RRNC and helps you identify the appropriate codes for each state.
-
Action Letter to Illinois EPA on Chicago Area Waterway Water Quality Standards - November 2011
EPA approved the State of Illinois' new and revised water quality standards for five segments of the Chicago and Calumet Rivers.
-
When I replace windows, I set up interior vertical containment barriers that extend from floor to ceiling and completely enclose the interior area in which I physically work. If these barriers are set up at a distance less than six feet from the perimeter of the work surface, must I still extend the containment on the floor beyond the vertical barrier to meet the six-foot requirement?
Answer: No, provided that the vertical containment system consists of impermeable barriers that extend from the floor to the ceiling and are tightly sealed at joints with the floor, ceiling and walls (40 CFR § 745.85(a)(2)(i)(D)). This type of vertical containment acts as the functional equivalent of a wall for…
-
When installing a roof, my firm does not create dust by directly sanding or cutting painted surfaces, but we do hammer the unpainted side of the lumber from above. Does the RRP Rule apply to this work?
The Lead Renovation, Repair, and Painting (RRP) Rule applies to work that disturbs painted surfaces. If hammering painted components, even on the unpainted side, disturbs paint, creating dust or chips, the RRP Rule applies. Question Number: 23002-23787 Find a printable PDF copy of all frequent questions pertaining to lead .
-
What, if any, additional requirements or liabilities exist if a homeowner independently removes the protective barriers and containment measures implemented by the firm during a renovation?
Before a firm begins a renovation, they are required to comply with all information distribution requirements under the Lead Renovation, Repair and Painting (RRP) Rule and to post signs that clearly define the work area and warn occupants and other persons not involved in renovation activities to remain outside of…
-
When multiple contractors are involved in a single renovation, must every contractor provide pre-renovation education? Can a certified firm assign its responsibility to a property management company?
All firms performing, offering or claiming to perform renovations are responsible for ensuring compliance with the pre-renovation education requirements of the RRP Rule. However, it is unnecessary for the same notifications and information to be given out repeatedly during a single renovation. Accordingly, a firm may discharge the task by…
-
When must scaffolding and vertical shrouding be used on an exterior renovation when other buildings are in close proximity to the work area?
The certified renovator or a worker under the direction of the certified renovator must contain the work area so that dust or debris does not leave the work area while the renovation is being performed. The certified renovator must be on site while the containment is established and is responsible…
-
When renovating a common area in an apartment building, must my firm provide pre-renovation education to all tenants?
Yes. Firms performing renovations in common areas of multi-unit housing must comply with the information distribution requirements before beginning renovation activities. The firm must provide the owner of the common area being renovated (generally the building owner) with the "Renovate Right" pamphlet and obtain a written acknowledgement of receipt. The…
-
When renovating the exterior of a high-rise building, does the requirement to close and seal doors and windows within 20 feet of the renovation include closing those openings two-plus floors above the floor where work is to be performed?
Not necessarily. When establishing containment for an exterior renovation on a multi-story building, you must close all doors and windows within 20 feet of the renovation on the same floor as the renovation, and close all doors and windows on all floors below that are the same horizontal distance from…
-
When repainting rental housing, if the landlord supplies the paint and materials, and the tenant does the labor without receiving money, credit toward rent, or other compensation, does the RRP Rule apply?
No. The Lead Renovation, Repair, and Painting (RRP) Rule only applies to renovations performed for compensation. Question Number: 23002-23856 Find a printable PDF copy of all frequent questions pertaining to lead .
-
Under the Lead Renovation, Repair and Painting (RRP) Rule, how should I dispose of contaminated water used in two-bucket mopping?
EPA recommends contacting your local water treatment authority and asking about local requirements for handling and disposing of waste water. Question Number: 23002-20756 Find a printable PDF copy of all frequent questions pertaining to lead .
-
Under the Pre-Renovation Education Rule, I have the option of using a certificate of mailing to notify the owner or occupant. What is the difference between a certificate of mailing and certified mail?
A certificate of mailing is a receipt showing evidence of mailing, while certified mail provides proof of mailing and delivery of mail. When using the certificate of mailing option, no record is kept at the mailing office and a receipt is not obtained when mail is delivered to the addressee…
-
To avoid harming the homeowner's grass and landscaping, may my firm fold up the plastic sheeting used for containment at night and re-use it the next day?
Yes, as long as your firm does so in a way that contains any dust and debris on the plastic. One way to accomplish this is to collect and remove the paint chips and debris from the plastic sheeting at the end of each day, mist the sheeting and fold…
-
The Lead Renovation, Repair and Painting (RRP) Rule provisions require exterior containment. At what point is the wind too strong to allow work to continue?
The work practices for exterior projects are based on a performance standard -- the certified renovator or a worker under the direction of the certified renovator must contain the work area so that dust or debris does not leave the work area while the renovation is being performed. The certified…
-
The Renovation, Repair, and Painting (RRP) Rule requires HEPA vacuums to be used for cleaning up the dust created by renovations. What should I look for when purchasing a HEPA vacuum?
According to the definition in 40 CFR 745.83 : " HEPA vacuum means a vacuum cleaner which has been designed with a high-efficiency particulate air (HEPA) filter as the last filtration stage. A HEPA filter is a filter that is capable of capturing particulates of 0.3 microns with 99.97% efficiency…
-
The certified renovator is required to have proof of their certification at the work site. If the certified renovator provides on-the-job training to workers, does there need to be documentation of that training at the work site too?
Answer: No. Certified renovators must have with them at the work site copies of their initial course completion certificate and their most recent refresher course completion certificate. Certified renovators are also responsible for providing training to non-certified workers on the work practices they will be using in performing their assigned…
-
My non-profit organization receives grants to arrange renovations in older housing. My organization is responsible for locating eligible properties and hiring firms to perform the renovations. Must my organization become an RRP-certified firm?
My non-profit organization receives grants to arrange for renovations in older housing, such as weatherization projects or general modernization. Typically, these grants come with eligibility conditions for properties and/or property owners and tenants, but specific properties or projects are not identified. My organization is responsible for locating eligible properties and…
-
Coal Combustion Residuals (CCR) Part B Implementation
Facilities have until November 30, 2020 to submit applications to EPA for approval. EPA is updating this webpage with the current status of the demonstrations received in the table below.