OHD004253225 Documents, Photos and Graphics
- EPA Fact Sheet - EPA Announces Proposed Cleanup and Final Remedy (pdf) March 2022
- Statement of Basis: Proposed Remedy (pdf) March 2022
- U.S. EPA RCRA Corrective Action Corrective Measures Proposal (pdf) December 2016
- Environmental Indicator Determination, CA 725 Current Human Exposures under Control (pdf) September 2016
- Environmental Indicator Determination, CA 750 Migration of Contaminated Groundwater under Control (pdf) September 2016
- Ecological Risk Assessment, Revised (pdf) March 2016
- Sampling and Analysis Plan No. 4 for Supplemental RFI (pdf) June 2014
- Quality Assurance Project Plan (pdf) November 2008
- Sampling and Analysis Plan No. 4 for Supplemental RFI (pdf) June 2014
- Sampling and Analysis Plan No. 3 Surface Water, Sediment, Sediment Pore Water, and Shallow Soil Investigation (pdf) August 2008
- Sampling and Analysis Plan No. 2 Direct Push Soil Investigation (pdf) June 2008
- Statement of Work No. 1 Former Process Wastewater Sewer (AOI B) Investigation and Former Scrap Building Underground Storage Tank (AOI I) Integrity Test (pdf) June 2008
- RCRA 3008(h) Administrative Order On Consent (pdf) September 2007
- Historic Conditions Complied Report 1977-2003 (pdf) November 2003