Skip to main content
U.S. flag

An official website of the United States government

Here’s how you know

Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

HTTPS

Secure .gov websites use HTTPS
A lock (LockA locked padlock) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

    • Environmental Topics
    • Air
    • Bed Bugs
    • Cancer
    • Chemicals, Toxics, and Pesticide
    • Emergency Response
    • Environmental Information by Location
    • Health
    • Land, Waste, and Cleanup
    • Lead
    • Mold
    • Radon
    • Research
    • Science Topics
    • Water Topics
    • A-Z Topic Index
    • Laws & Regulations
    • By Business Sector
    • By Topic
    • Compliance
    • Enforcement
    • Laws and Executive Orders
    • Regulations
    • Report a Violation
    • Environmental Violations
    • Fraud, Waste or Abuse
    • About EPA
    • Our Mission and What We Do
    • Headquarters Offices
    • Regional Offices
    • Labs and Research Centers
    • Planning, Budget, and Results
    • Organization Chart
    • EPA History

Breadcrumb

  1. Home
  2. News Releases

Interim Water Treatment Plant in Gladstone, Colorado is fully operational

March 16, 2019

Contact Information
Richard Mylott (Region8Media@epa.gov)
303-312-6654

DENVER  -- Today, the U.S. Environmental Protection Agency restored power to the Interim Water Treatment Plant (IWTP) at the Bonita Peak Superfund site in Gladstone, Colorado and resumed normal operations.  The facility had been offline since the evening of March 14 due to extreme weather conditions resulting in a loss of power. Crews were able to safely access the plant this morning, and the plant is now operating normally.

During the temporary closure of the IWTP, the additional metals loading into the Animas River was not significantly different from conditions that existed prior to the initiation of treatment of the Gold King Mine discharge when the plant was constructed in 2015. At this time, EPA expects no impacts to downstream drinking water or agricultural users associated with the short-term shutdown of the plant. Any impacts will be localized in nature and will be largely limited to aquatic life in the Animas River Canyon south of Silverton.

While the Gold King Mine is a significant source of metals contamination, and one of EPA's priority sites in the Bonita Peak Superfund site, it is one of dozens of mines in the Mining District.  When the water treatment plant is operational, it typically removes about 500-600 pounds of metals/day during March.  While data for metals loading in winter months are unavailable, EPA estimates that the Gold King discharge, prior to treatment, represents 15% - 25%, of the total metals load leaving the mining district during low-flow conditions. The majority of these metals are iron and aluminum.

Water samples were taken along the Animas River, near Silverton, Colorado, and results are expected early next week.

Related Links

  • Region 08
  • Read other EPA News Releases about Superfund and Brownfields
Contact Us about News Releases
Contact Us to ask a question, provide feedback, or report a problem.
Last updated on January 9, 2023
  • Assistance
  • Spanish
  • Arabic
  • Chinese (simplified)
  • Chinese (traditional)
  • French
  • Haitian Creole
  • Korean
  • Portuguese
  • Russian
  • Tagalog
  • Vietnamese
United States Environmental Protection Agency

Discover.

  • Accessibility Statement
  • Budget & Performance
  • Contracting
  • EPA www Web Snapshot
  • Grants
  • No FEAR Act Data
  • Plain Writing
  • Privacy
  • Privacy and Security Notice

Connect.

  • Data
  • Inspector General
  • Jobs
  • Newsroom
  • Regulations.gov
  • Subscribe
  • USA.gov
  • White House

Ask.

  • Contact EPA
  • EPA Disclaimers
  • Hotlines
  • FOIA Requests
  • Frequent Questions
  • Site Feedback

Follow.