Collections and Lists
-
Region 2 2012 Title V Operating Permits Database
Region 2 2013 Title V Permits Database
-
Region 2 2014 Title V Operating Permits Database
Region 2 2014 Title V Permits Database
-
Hazardous Waste Cleanup: DuPont Facility - East Chicago, Indiana
RCRA Corrective Action Site, DuPont Facility - East Chicago, Indiana IND005174354
-
BASF Corporation Current Documents, Photos and Graphics
Documents, Reports and Graphics for BASF Corporation - Cleveland Ohio
-
Niagara River BUI Removal of Fish Tumors or Other Deformities
This 2007 Progress Report of the Niagara River Toxics Management Plan (NRTMP) summarizes progress made by the four parties in dealing with the 18 “Priority Toxics” through reductions in point and non-point sources to the Niagara River.
-
EPA in the Pacific Southwest Videos (2025)
Videos highlighting projects, events and environmental issues in or related to the EPA's Pacific Southwest (Region 9).
-
SAM 2017 Appendix D: Selected Biotoxin Methods
This appendix lists the usability tiers assigned to biotoxin methods in EPA’s Selected Analytical Methods for Environmental Remediation and Recovery (SAM).
-
SAM 2017 Appendix A: Selected Chemical Methods
This appendix lists the usability tiers assigned to chemical methods in EPA’s Selected Analytical Methods for Environmental Remediation and Recovery (SAM).
-
Summaries of Dockets Related to OAR's Implementation of the Inflation Reduction Act
Questions to be used in public comment on non-regulatory dockets regarding the Inflation Reduction Act.
-
Superfund: Construction Completion Search
Search for Superfund sites that have achieved the Construction Completion milestone.
-
Manistique River AOC 1987 Remedial Action Plan
The purpose of this remedial action plan is to gather data that focuses to find a solution to the primary problems which impair the AOC's BUIs
-
The answer provided in the updated FAQ section says, “Per Section 6 of the NOFO, References can be included as part of the 30-page limit of the Project Narrative. Applications must adhere to the page limit requirements” but in checking that section of the NOFO there is no reference to “References Cited” or “References” at all. It is not mentioned anywhere in the NOFO that we can find. It is also not listed as one of the required sections of the Project Narrative. In that section they also specifically mention that “Maps, charts, pictures, and other figures must be included in the Project Narrative file.” But no mention at all is made of a “References Cited” section.
However, also in Section 4 in Part “A” (Application Forms) there is mention of the “Other Attachments” form. Is this where we should be uploading the Curriculum Vitae for the Principal Investigators and other staff? In our submission, this is where we uploaded those CV documents as well as the References Cited pages, as well as the other additional files considered necessary to the proposal including the following:
Detailed list of legacy compounds to be analyzed for
Letters of Collaboration (2)
Should any of these documents be included as a part of the Project Narrative and subject to the 30-page limit?References are not a required part of the “Project Narrative” portion of the application. However, if you choose to submit supporting materials such as references cited, curriculum vitae, or letters of collaboration, then you should submit them as an optional document or as part of the “Other Attachments Form.” These…
-
Did we include all the information in the application in the appropriate place?
If you wish to revise your submission, you should submit a new application package. The review panel will be provided the version submitted nearest to the application due date.
-
We would like to include references as part of our proposal, but we aren’t sure if this is part of the 30-page limit or if this is allowed to be outside the thirty pages.
The “Project Narrative” is limited to 30-pages. Pages exceeding the limit will not be reviewed. However, references may be included as part of the “Other Attachments Form”.
-
We are also hoping you can clarify if the budget justification has to be part of the 30-page limit or if its outside of this limit and loaded in its own section. (Seems like there is some conflicting information in the call)
As stated in the NOFO on page 12. 29. Budget 30. Detailed budget narrative Expeditious spending and sufficient progress in the use of GLRI funds. Applicants are advised that readability is of paramount importance and should take precedence in application format, including selecting a legible font type and size for…
-
Abandoned Mine Lands: Mineral Processing Sectors
The most common hardrock minerals mined and processed and the resulting waste generated for each mineral type.
-
Clean Air Act Guidelines and Standards for Waste Management
This page contains the stationary sources of air pollution for the waste management industries, and their corresponding air pollution regulations. To learn more about the regulations for each industry, just click on the links below.
-
Remedy Resilience: Vulnerability Assessment
Learn about Superfund Vulnerability Assessments, efforts that seek to evaluate a site remedy's exposure and sensitivity to hazards of concern.
-
What If We Kept Our Cars Parked for Trips Less Than One Mile?
Thought starter about walking or biking for trips less than one mile.
-
Permit Fees
This site will provide basic information on clean air permitting under the title V operating permits program, provide access to state and regional permitting programs, and maintain access to proposed and final regulatory requirements.