Collections and Lists
-
Hovensa, LLC Christiansted, VI (FCCU)
A new resource recovery facility capable of generating 77 MW
-
Hovensa, LLC Christiansted, VI (Lower NOx Emissions Project)
A new resource recovery facility capable of generating 77 MW
-
Hovensa St. Croix, VI
A new resource recovery facility capable of generating 77 MW
-
American Re-Fuel Company of Hempstead Westbury, NY
A new resource recovery facility capable of generating 77 MW
-
Previously Published PACE Survey Data (1973 - 1993)
The PACE survey collects facility-level data on pollution abatement capital expenditures and operating costs associated with compliance to local, state, and federal regulations and voluntary or market-driven pollution abatement activities.
-
Virgin Islands Water and Power Authority - Units 16, 17, 19 and 20
A new resource recovery facility capable of generating 77 MW
-
Water and Wastewater Sector Power Resilience Case Studies
Water Sector Power Resilience Case studies
-
PSD Permit Program Delegation to New Jersey
A listing of federal air regulations that have been delegated to states in Region 2.
-
1997 and 2006 Fine Particulate Matter National Ambient Air Quality Standards (NAAQS) Nonattainment Actions
Read about the relevant nonattainment actions pertaining to the implementation of the 2006 PM NAAQS. Find the text of the rules, fact sheets, docket folders, and supporting documents.
-
EcoElectrica, L.P. Peñuelas, PR
A new resource recovery facility capable of generating 77 MW
-
Puerto Rico Electric and Power Authority (PREPA) Cambalache Plant San Juan, PR
A new resource recovery facility capable of generating 77 MW
-
Philadelphia Furniture, LLC Salamanca (Tribal Area), NY
A new resource recovery facility capable of generating 77 MW
-
Sources Registered Under the FIP for New and Modified True Minor Oil and Natural Gas Sources in Region 8 Indian Country
The sources on Indian country reservation lands in Region 8 that are registered under the Federal Implementation Plan (FIP) for New and Modified True Minor Oil and Natural Gas Sources.
-
Virgin Islands Water and Power Authority - Unit 23, at the Krum Bay St. Thomas, VI
39 MW simple cycle oil fired combustion turbine
-
Tribal Minor NSR Facility Closure Form in Region 8
This form should be used to notify the EPA Region 8 Federal Minor NSR Permit Program that an existing True Minor NSR or Synthetic Minor NSR Facility has been closed and decommissioned.
-
Tribal Minor NSR Existing Source Registration Form in Region 8
This Tribal Minor NSR application form should be used to register an existing true minor source with the EPA Region 8 Tribal NSR Permitting Program.
-
Tribal Minor NSR Change in Ownership Form in Region 8
This Tribal Minor NSR application form should be used to notify the Region 8 Tribal Minor NSR Program of any changes in ownership of an existing facility.
-
Nucor Steel Auburn, Inc. Auburn, NY
A new resource recovery facility capable of generating 77 MW
-
Puerto Rico Electric and Power Authority- San Juan Combined Cycle Project San Juan, PR (Combined Cycle Project)
A new resource recovery facility capable of generating 77 MW
-
Tribal Minor NSR Facility Location Change Form in Region 8
This form should be used to notify the EPA Region 8 Federal Minor NSR Permit Program that the location of an existing True Minor NSR or Synthetic Minor NSR source has changed.