EPA-Approved Arkansas Source-Specific Requirements
Link to Arkansas Source-Specific Standards in 40 CFR Part 52 Subpart E, §52.170(d) (eCFR).
# | Name of source | Permit or Order No. | State approval/ effective date |
EPA approval date | Comments | Status |
---|---|---|---|---|---|---|
1 | Arkansas Electric Cooperative Corporation Carl E. Bailey Generating Station | Administrative Order LIS No. 18-071 | 8/7/2018 | 9/27/2019, 84 FR 51033, ARd34 |
Unit 1. | Regs.gov Document: EPA-R06-OAR-2015-0189-0274, Attach #1 – 18-071. Link to Download EPA-R06-OAR-2015-0189-0274 Attachment 1 (pdf)(1.5 KB). |
2 | Arkansas Electric Cooperative Corporation John L. McClellan Generating Station | Administrative Order LIS No. 18-071 | 8/7/2018 | 9/27/2019, 84 FR 51033, ARd34 |
Unit 1. | Regs.gov Document: EPA-R06-OAR-2015-0189-0274, Attach #1 – 18-071. Link to Download EPA-R06-OAR-2015-0189-0274 Attachment 1 (pdf)(1.5 KB). |
3 | Southwestern Electric Power Company Flint Creek Power Plant | Administrative Order LIS No. 18-072 |
8/7/2018 | 9/27/2019, 84 FR 51033, ARd34 |
Unit 1. | Regs.gov Document: EPA-R06-OAR-2015-0189-0274, Attach #3 – 18-072. Link to Download EPA-R06-OAR-2015-0189-0274 Attachment 3 (pdf)(2.0 KB). |
4 | Entergy Arkansas, Inc. Lake Catherine Plant | Administrative Order LIS No. 18-073 | 8/7/2018 | 9/27/2019, 84 FR 51033, ARd34 |
Unit 4. | Regs.gov Document: EPA-R06-OAR-2015-0189-0274, Attach #2 – 18-073. Link to Download EPA-R06-OAR-2015-0189-0274 Attachment 2 (pdf)(2.1 MB). |
5 | Entergy Arkansas, Inc. White Bluff Plant | Administrative Order LIS No. 18-073 | 8/7/2018 | 9/27/2019, 84 FR 51033, ARd34 |
Units 1, 2, and Auxiliary Boiler. | Regs.gov Document: EPA-R06-OAR-2015-0189-0274, Attach #2 – 18-073. Link to Download EPA-R06-OAR-2015-0189-0274 Attachment 2 (pdf)(2.1 MB). |
6 | Entergy Arkansas, Inc. Independence Plant | Administrative Order LIS No. 18-073 | 8/7/2018 | 9/27/2019, 84 FR 51033, ARd34 |
Units 1 and 2. | Regs.gov Document: EPA-R06-OAR-2015-0189-0274, Attach #2 – 18-073. Link to Download EPA-R06-OAR-2015-0189-0274 Attachment 2 (pdf)(2.1 MB). |
7 | Domtar Ashdown Mill | Permit #0287-AOP-R22 | 8/1/2019 | 3/22/2021, 86 FR 15101, ARd40 |
Approval of plantwide conditions 32 to 43 of section VI from the permit, addressing emission limits for SO 2, NO X, and PM 10 and conditions for implementing the BART alternative for Power Boilers No. 1 and 2. | Regs.gov document: EPA-R06-OAR-2015-0189-0300, Permit #0287-AOP-R22. Link to Download EPA-R06-OAR-2015-0189-0300 (pdf)(6.7 MB). |