Skip to main content
U.S. flag

An official website of the United States government

Here’s how you know

Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

HTTPS

Secure .gov websites use HTTPS
A lock (LockA locked padlock) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

    • Environmental Topics
    • Air
    • Bed Bugs
    • Chemicals, Toxics, and Pesticide
    • Emergency Response
    • Environmental Information by Location
    • Health
    • Land, Waste, and Cleanup
    • Lead
    • Mold
    • Radon
    • Research
    • Science Topics
    • Water Topics
    • A-Z Topic Index
    • Laws & Regulations
    • By Business Sector
    • By Topic
    • Compliance
    • Enforcement
    • Guidance
    • Laws and Executive Orders
    • Regulations
    • Report a Violation
    • Environmental Violations
    • Fraud, Waste or Abuse
    • About EPA
    • Our Mission and What We Do
    • Headquarters Offices
    • Regional Offices
    • Labs and Research Centers
    • Planning, Budget, and Results
    • Organization Chart
    • EPA History

Breadcrumb

  1. Home
  2. Air Quality Implementation Plans

EPA Approved Nonregulatory Provisions and Quasi-Regulatory Measures in the Mississippi SIP

About this website: This website does not necessarily represent the current version of the SIPs, TIPs, or FIPs.  The official SIPs, TIPs, and FIPs are contained in regulations promulgated in the Federal Register and codified in the U.S. Code of Federal Regulations (CFR).  While we make every effort to maintain the accuracy of the files accessible here, inconsistencies may occur.  Please contact us using the link below if you find any errors in these files. 

Updated as of: May 27, 2026.

EPA Contact: EPA Region 4: Jia Shi (404-562-9448)

EPA Approved Mississippi Non-Regulatory Provisions

Name of non-regulatory SIP provision Applicable geographic or nonattainment area State Submittal or State Effective DateEPA Approval DateFR CitationExplanation
110(a)(1) and (2) Infrastructure Requirements for the 1997 8-Hour Ozone National Ambient Air Quality StandardsMississippi12/7/20077/13/201176 FR 41123For the 1997 8-hour ozone NAAQS.
Regional Haze PlanStatewide9/22/20086/27/201277 FR 38191 
Regional Haze Plan Update—E. I. Dupont Reasonable Progress and Mississippi Phosphates BART DeterminationsStatewide5/9/20116/27/201277 FR 38191 
110(a)(1) and (2) Infrastructure Requirements for 1997 Fine Particulate Matter National Ambient Air Quality StandardsMississippi12/7/200710/9/201277 FR 61276With the exception of sections 110(a)(2)(D)(i), 110(a)(2)(E)(ii) and 110(a)(2)(G).
110(a)(1) and (2) Infrastructure Requirements for 2006 Fine Particulate Matter National Ambient Air Quality StandardsMississippi10/6/200910/9/201277 FR 61276With the exception of sections 110(a)(2)(D)(i), 110(a)(2)(E)(ii) and 110(a)(2)(G).
110(a)(2)(G) Infrastructure Requirement for the 1997 and 2006 Fine Particulate Matter National Ambient Air Quality StandardsMississippi7/26/201210/9/201277 FR 61279 
110(a)(2)(D)(i)(I) Infrastructure Requirements for the 2006 24-hour PM2.5 NAAQSMississippi10/6/200910/11/201277 FR 61727EPA partially disapproved this SIP submission to the extent that it relied on the Clean Air Interstate Rule to meet the 110(a)(2)(D)(i)(I) requirements for the 2006 24-hour PM2.5 NAAQS.
110(a)(2)(E)(ii) Infrastructure Requirement for the 1997 and 2006 Fine Particulate Matter National Ambient Air Quality StandardsMississippi10/11/20124/8/201378 FR 20793EPA disapproved the State's 110(a)(2)(E)(ii) as it relates to section 128(a)(2), the significant portion of income requirement.
110(a)(1) and (2) Infrastructure Requirements for 1997 Fine Particulate Matter National Ambient Air Quality StandardsMississippi12/7/20074/12/201378 FR 21841Addressing element 110(a)(2)(D)(i)(II) prong 3 only
110(a)(1) and (2) Infrastructure Requirements for 2006 Fine Particulate Matter National Ambient Air Quality StandardsMississippi10/6/20094/12/201378 FR 21841Addressing element 110(a)(2)(D)(i)(II) prong 3 only
Transportation Conformity Interagency Consultation And General ProvisionsDeSoto County portion of Memphis, TN-AR-MS 2008 8-hour Ozone Nonattainment Area5/31/201311/13/201378 FR 67952 
110(a)(1) and (2) Infrastructure Requirements for 1997 Fine Particulate Matter National Ambient Air Quality StandardsMississippi12/7/20075/7/201479 FR 26143Addressing prong 4 of section 110(a)(2)(D)(i) only.
110(a)(1) and (2) Infrastructure Requirements for 2006 Fine Particulate Matter National Ambient Air Quality StandardsMississippi10/6/20095/7/201479 FR 26143Addressing prong 4 of section 110(a)(2)(D)(i) only.
110(a)(1) and (2) Infrastructure Requirements for the 2008 8-Hour Ozone National Ambient Air Quality StandardsMississippi7/26/20123/2/201580 FR 11131With the exception of sections:
110(a)(2)(C) and (J) concerning PSD permitting requirements;
110(a)(2)(D)(i)(I) and (II) (prongs 1 through 4) concerning interstate transport requirements;
110(a)(2)(E)(ii) concerning state board majority requirements respecting significant portion of income; and
110(a)(2)(J) concerning visibility requirements.
110(a)(1) and (2) Infrastructure Requirements for the 2008 Lead NAAQSMississippi11/17/20113/18/201580 FR 14019Addressing the PSD permitting requirements of sections 110(a)(2)(C), 110(a)(2)(D)(i)(II) (prong 3) and 110(a)(2)(J) only.
110(a)(1) and (2) Infrastructure Requirements for the 2008 Ozone NAAQSMississippi5/29/2012 and amended on 7/26/20123/18/201580 FR 14019Addressing the PSD permitting requirements of sections 110(a)(2)(C), 110(a)(2)(D)(i)(II) (prong 3) and 110(a)(2)(J) only.
110(a)(1) and (2) Infrastructure Requirements for the 2010 NO2 NAAQSMississippi2/28/20133/18/201580 FR 14019Addressing the PSD permitting requirements of sections 110(a)(2)(C), 110(a)(2)(D)(i)(II) (prong 3) and 110(a)(2)(J) only.
110(a)(1) and (2) Infrastructure Requirements for the 2008 Lead National Ambient Air Quality Standards 110(a)(2)(E)(ii) Infrastructure Requirement for 2008 Lead National Ambient Air Quality Standards 11/4/20113/30/201580 FR 16568With the exception of provisions pertaining to PSD permitting requirements in sections 110(a)(2)(C), prong 3 of D(i) and (J) and the majority of requirements respecting significant portion of income of section 110(a)(2)(E)(ii) (related to section 128(a)(2)).
2011 Base Year Emissions Inventory for the Mississippi portion of the Memphis, TN-MS-AR 2008 Ozone NAAQS Nonattainment AreaDeSoto County portion of Memphis, TN-AR-MS 2008 8-hour Ozone Nonattainment Area1/14/20157/2/201580 FR 37985 
110(a)(1) and (2) Infrastructure Requirements for the 2008 Ozone NAAQSMississippi7/26/20128/12/201580 FR 48255Addressing the visibility requirements of 110(a)(2)(J) only.
2008 8-hour ozone Maintenance Plan for the DeSoto County portion of Memphis, TN-AR-MS Nonattainment AreaDeSoto County portion of Memphis, TN-AR-MS Nonattainment Area12/2/20154/8/201681 FR 20543 
110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour NO2 National Ambient Air Quality StandardMississippi2/28/20139/16/201681 FR 67305With the exception of sections: 110(a)(2)(C) and (J) concerning PSD permitting requirements; 110(a)(2)(D)(i)(I) and (II) (prongs 1 through 4) concerning interstate transport requirements and the state board majority requirements respecting significant portion of income of section 110(a)(2)(E)(ii).
110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour SO2 NAAQSMississippi6/20/20139/30/201681 FR 67178With the exception of the interstate transport requirements of section 110(a)(2)(D)(i)(I) and (II) (prongs 1, 2, and 4) and the state board majority requirements respecting significant portion of income of section 110(a)(2)(E)(ii).
110(a)(1) and (2) Infrastructure Requirements for the 2012 Annual PM2.5 NAAQSMississippi12/11/201512/12/201681 FR 89393With the exception of sections: 110(a)(2)(C) and (J) concerning PSD permitting requirements; 110(a)(2)(D)(i)(I) and (II) (prongs 1 through 4) concerning interstate transport requirements and the state board majority requirements respecting significant portion of income of section 110(a)(2)(E)(ii).
Good Neighbor Provisions (Section 110(a)(2)(D)(i)(I) for the 2010 1-hour NO2 NAAQSMississippi5/23/201612/22/201681 FR 93824 
110(a)(1) and (2) Infrastructure Requirements for the 2012 Annual PM2.5 NAAQSMississippi12/8/20159/25/201883 FR 48387Addressing Prongs 1 and 2 of section 110(a)(2)(D)(i)(I) only.
110(a)(1) and (2) Infrastructure Requirements for the 1997 Annual PM2.5 NAAQSMississippi6/25/201810/4/201883 FR 50014Addressing the state board requirements of sections 128 and 110(a)(2)(E)(ii) only.
110(a)(1) and (2) Infrastructure Requirements for the 2006 24-hour PM2.5 NAAQSMississippi6/25/201810/4/201883 FR 50014Addressing the state board requirements of sections 128 and 110(a)(2)(E)(ii) only.
110(a)(1) and (2) Infrastructure Requirements for the 2012 24-hour PM2.5 NAAQSMississippi6/25/201810/4/201883 FR 50014Addressing the state board requirements of sections 128 and 110(a)(2)(E)(ii) only.
110(a)(1) and (2) Infrastructure Requirements for the 2008 Lead NAAQSMississippi6/25/201810/4/201883 FR 50014Addressing the state board requirements of sections 128 and 110(a)(2)(E)(ii) only.
110(a)(1) and (2) Infrastructure Requirements for the 2008 8-hour Ozone NAAQSMississippi6/25/201810/4/201883 FR 50014Addressing the state board requirements of sections 128 and 110(a)(2)(E)(ii) only.
110(a)(1) and (2) Infrastructure Requirements for the 2010 NO2 NAAQSMississippi6/25/201810/4/201883 FR 50014Addressing the state board requirements of sections 128 and 110(a)(2)(E)(ii) only.
110(a)(1) and (2) Infrastructure Requirements for the 2010 SO2 NAAQSMississippi6/25/201810/4/201883 FR 50014Addressing the state board requirements of sections 128 and 110(a)(2)(E)(ii) only.
110(a)(1) and (2) Infrastructure Requirements for the 2012 Annual PM2.5 NAAQSMississippi12/11/201512/18/201883 FR 64746Addressing the PSD permitting requirements of sections 110(a)(2)(C), 110(a)(2)(D)(i)(II) (prong 3) and 110(a)(2)(J) only
Regional Haze Progress ReportMississippi10/4/201810/6/2021 86 FR 55501 
BARTMississippi8/13/202010/6/2021 86 FR 55501 
110(a)(1) and (2) Infrastructure Requirements for the 2015 8-hour ozone NAAQSMississippi1/25/20219/22/202287 FR 57832 
110(a)(1) and (2) Infrastructure Requirements for the 2015 8-hour Ozone NAAQSMississippi1/25/20213/1/202388 FR 12833 

Air Quality Implementation Plans

  • About Air Quality Implementation Plans
  • Approved Air Quality Implementation Plans
  • Develop an Air Quality SIP
  • Find a Regional Contact for Air Quality SIPs/FIPS/TIPs
  • Tools for SIP Status
Contact Us about Air Quality Implementation Plans
Contact Us about Air Quality Implementation Plans to ask a question, provide feedback, or report a problem.
Last updated on May 27, 2026
  • Assistance
  • Spanish
  • Arabic
  • Chinese (simplified)
  • Chinese (traditional)
  • French
  • Haitian Creole
  • Korean
  • Portuguese
  • Russian
  • Tagalog
  • Vietnamese
United States Environmental Protection Agency

Discover.

  • Accessibility Statement
  • Budget & Performance
  • Contracting
  • EPA www Web Snapshot
  • Grants
  • No FEAR Act Data
  • Plain Writing
  • Privacy and Security Notice

Connect.

  • Data
  • Inspector General
  • Jobs
  • Newsroom
  • Regulations.gov
  • Subscribe
  • USA.gov
  • White House

Ask.

  • Contact EPA
  • EPA Disclaimers
  • Hotlines
  • FOIA Requests
  • Frequent Questions
  • Site Feedback

Follow.