Texas SIP: 30 TAC 117.3000-117.3056: Utility Electric Generation in East and Central Texas; SIP effective 2009-01-02 (TXd97)
Regulatory Text:
Texas Chapter 117 - Control of Air Pollution From Nitrogen Compounds
SUBCHAPTER E: MULTI-REGION COMBUSTION CONTROL
DIVISION 1: UTILITY ELECTRIC GENERATION IN EAST AND CENTRAL TEXAS
Adopted by TCEQ May 23, 2007 effective June 14, 2007 (7-27).
Submitted to EPA May 30, 2007.
Approved by EPA December 3, 2008 (73 FR 73562) effective January 2, 2009 (TXd97).
Outline:
§117.3000. Applicability. 7-27 (page 394), TXd97
§117.3003. Exemptions. 7-27 (page 395), TXd97
§117.3005. Gas-Fired Steam Generation. 7-27 (page 396), TXd97
§117.3010. Emission Specifications. 7-27 (page 397), TXd97
NOT in SIP: Subsection 117.3010(2)
§117.3020. System Cap. 7-27 (page 398), TXd97
§117.3035. Initial Demonstration of Compliance. 7-27 (page 401), TXd97
§117.3040. Continuous Demonstration of Compliance. 7-27 (page 402), TXd97
§117.3045. Notification, Recordkeeping, and Reporting Requirements. 7-27 (page 406), TXd97
§117.3054. Final Control Plan Procedures. 7-27 (page 410), TXd97
§117.3056. Revision of Final Control Plan. 7-27 (page 411), TXd97
**********************************end outline tx7E1d097***************************mxe***