Skip to main content
U.S. flag

An official website of the United States government

Here’s how you know

Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

HTTPS

Secure .gov websites use HTTPS
A lock (LockA locked padlock) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

    • Environmental Topics
    • Air
    • Bed Bugs
    • Cancer
    • Chemicals, Toxics, and Pesticide
    • Emergency Response
    • Environmental Information by Location
    • Health
    • Land, Waste, and Cleanup
    • Lead
    • Mold
    • Radon
    • Research
    • Science Topics
    • Water Topics
    • A-Z Topic Index
    • Laws & Regulations
    • By Business Sector
    • By Topic
    • Compliance
    • Enforcement
    • Laws and Executive Orders
    • Regulations
    • Report a Violation
    • Environmental Violations
    • Fraud, Waste or Abuse
    • About EPA
    • Our Mission and What We Do
    • Headquarters Offices
    • Regional Offices
    • Labs and Research Centers
    • Planning, Budget, and Results
    • Organization Chart
    • EPA History

Breadcrumb

  1. Home
  2. Climate Change Adaptation Resource Center (ARC-X)

Blue Plains Wastewater Facility in Washington DC Reinforces Facility Against Floods

Blue Plains Wastewater Facility
View of Blue Plains Wastewater Facility along the Potomac River.

The District of Columbia’s Blue Plains Wastewater Facility in Washington, DC, serves most of the national capital area, including parts of Maryland and Virginia. The service area of Blue Plains covers over 725 square miles.

This facility is vulnerable to flooding because of its location adjacent to the Potomac River. The facility has historically been protected from flooding by a seawall built to withstand a 1–100-year flood.

However, understanding that storms may become more frequent and intense, the DC Water and Sewer Authority decided to implement an adaptation action to prepare for more flooding due to climate change. This action included investing in a $113 million construction project to build a 17.2 ft high sea wall, with the first phase (Segment C), completed in June 2021. The new sea wall at the Blue Plains facility will surpass the recommended 500-year storm level by including 3 feet of freeboard to protect against higher river elevation or wave action.

Blue Plains has selected this standard as a proxy to adapt the facility to expected higher river elevation and storm surge inundation. This will help protect the facility against higher river levels and storm surges and reduce threats of Clean Water Act violations. Blue Plains took this action to promote resilience to current conditions and adapt to expected climate changes.


How Did They Do It?

  • Blue Plains Identified Facility Vulnerability and Appropriate Adaptation Options -Blue Plains acknowledged the scientific uncertainty of how climate change would impact water levels in the Potomac River. As a major facility with a large investment along the riverfront, building a seawall to protect against flooding was deemed a preferable strategy rather than moving the entire facility to higher ground.
  • Blue Plains Chose an Adaptation Action That Exceeded Current Best Practices to Account for Future Changes in Climate - Blue Plains utilized a proxy measurement to design the sea wall to account for uncertainty regarding how climate change would impact Potomac River levels. The sea wall was designed to account for a currently expected 500-year flood and includes 3 feet of freeboard. This design exceeds FEMA’s flood risk standards for federally funded projects.
    • Flood map resources from FEMA, NOAA, & USGS


Similar Cases and More Information

Several other communities have adapted to protect their water and wastewater service from flooding and sea level rise.

  • To see how another northeastern community analyzed the impact of sea level rise on a water utility, view Manchester-by-the-Sea.
  • For a community that recognized the prohibitive cost of protecting a highly vulnerable facility and decided to move to a safer facility, see Iowa City.
  • Protecting the Blue Plains facility is only one of several strategies Washington, D.C. has taken to reduce the threat of flooding on the community. To see how Washington, D.C. is using green infrastructure to reduce stormwater impacts and combined sewer overflows view the DC Consent Decree.

References

  • DC Water Seawall Improvement Project (PDF) (3 pp, 1.10 MB, About PDF)
  • DC Water's Publications and Budgets
  • Clean Rivers Project

Climate Change Adaptation Resource Center (ARC-X)

  • Your Climate Adaptation Search
  • Implications of Climate Change
  • Adaptation Planning
  • Adaptation Strategies
  • Case Studies
  • Tools
  • Training
  • Federal Funding & Technical Assistance
  • Library
  • Underlying Science
  • EPA Contacts & State Websites
Contact Us About Climate Change Adaptation Resource Center
Contact Us to ask a question, provide feedback, or report a problem.
Last updated on April 18, 2025
  • Assistance
  • Spanish
  • Arabic
  • Chinese (simplified)
  • Chinese (traditional)
  • French
  • Haitian Creole
  • Korean
  • Portuguese
  • Russian
  • Tagalog
  • Vietnamese
United States Environmental Protection Agency

Discover.

  • Accessibility Statement
  • Budget & Performance
  • Contracting
  • EPA www Web Snapshot
  • Grants
  • No FEAR Act Data
  • Plain Writing
  • Privacy
  • Privacy and Security Notice

Connect.

  • Data
  • Inspector General
  • Jobs
  • Newsroom
  • Regulations.gov
  • Subscribe
  • USA.gov
  • White House

Ask.

  • Contact EPA
  • EPA Disclaimers
  • Hotlines
  • FOIA Requests
  • Frequent Questions
  • Site Feedback

Follow.