Laws & Regulations
-
Pesticide Registration Manual: Chapter 7 - Notifications and Minor Formulation Amendments
This chapter provides information about preparing and submitting a notification for a pesticide product
-
Pesticide Registration Manual: Appendix B - Examples of Registrant Documents
Examples of Registrant Documents
-
TSCA Environmental Release Application (TERA) for Pseudomonas putida (P. putida)
TERA submitted by Oak Ridge National Laboratory and given the tracking designations of R-01-0002.The microorganism will be tested to determine whether it will produce light in the presence of trinitrotoluene (TNT) as a means of detecting TNT in soil.
-
ECM for Bicyclopyrone & Degradate SYN503780 in Soil - MRID 47841949
Environmental Chemistry Methods for Bicyclopyrone & Degradate SYN503780 in soil
-
Pesticide Labels: Guidance on Warranty Statements
Learn about use of warranty disclaimer statements and their use on pesticide labels.
-
Label Review Training: Module 3: Special Issues, Page 12
This module further describes and provides strategies for reviewing some of the label parts introduced in Module 2 of the pesticide label training, such as precautionary statements, directions for use, worker protection labeling, and more.
-
Class I Underground Injection Wells in Region 5
Class I Underground Injection Wells in Region 5, Indiana and michigan
-
Builder and Contractor Resources for Radon-Resistant New Construction (RRNC)
For builders new to radon-resistant new construction techniques, EPA provides a set of Architectural Drawings for three foundation types.
-
EPA Makes Findings of Failure to Submit State Implementation Plans (SIPs) - 1999 Regional Haze Program
EPA Makes Findings of Failure to Submit State Implementation Plans (SIPs) - 1999 Regional Haze Program
-
Informational Webinars on EPA’s Proposal: Clarifying the Scope of “Applicable Requirements” Under State and Federal Operating Permit Programs
Learn about upcoming webinars about a title V operating permit proposal on applicable requirements.
-
Six-Year Review 4 Frequent Questions and Answers
These are frequently asked questions and their answers related to the Six-Year Review 4.
-
Six-Year Review 4 of Drinking Water Standards (Information Collection Request)
This page describes the information collection request to the Office of Management and Budget to support the fourth Six-Year Review of National Primary Drinking Water Regulations.
-
Six-Year Review 3 of Drinking Water Standards
Read the summary of EPA's Six-Year Review 2 of existing drinking water standards and learn about the four regulatory revision candidates
-
2020 Order Denying a Petition on Title V Operating Permit for Bullseye Glass
This document is part of the Title V Petition Database.
-
2020 Petition on Title V Permit for Bullseye Glass
This document is part of the Title V Petition Database.
-
2020 Petition Requesting the Administrator Object to Title V Permit for Otter Tail Power Coyote Station
This document is part of the Title V Petition Database.
-
2018 Order Granting Petition for Objection to Title V Operating Permit for Hanford
This document is part of the title V petition database.
-
Are JCL and Ameresco Under Common Control
This document is part of the Title V Policy and Guidance Database and the NSR Policy and Guidance Database
-
2016 Order Responding to Claim V of a 2014 Petition to Object to Alon Operating Permit
This document is part of the Title V Petition Database.
-
2016 Petition Requesting the Administrator Object to Title V Permit for Waupaca - Plants 2 and 3
This document is part of the Title V Petition Database.