Laws & Regulations
-
UIC-09-2019-0032: Detroit Diesel Corporation Freightliners of Hawaii, Kapolei, HI; Consent Agreement and Final Order
Consent Agreement and Final Order ("CAFO") between the U.S. Environmental Protection Agency, Region 9 (“EPA”) and Detroit Diesel Corporation, 91-265 Kalaeoloa Boulevard Kapolei, HI 96707. Docket No. UIC-09-2019-0032.
-
UIC-AO-2005-0007: U.S. Army Hawaii Pohakuloa Training Area; Consent Agreement and Final Order
Consent Agreement and Final Order ("CAFO") between the U.S. Environmental Protection Agency, Region 9 (“EPA”) and U.S. Army, Hawaii, 25th Infantry Division (Light), Pohakuloa Training Area. Docket No. UIC-AO-2005-0007.
-
UIC-AO-2005-0006: County of Kauai, Lihu'e, HI; Consent Agreement and Final Order
Consent Agreement and Final Order ("CAFO") between the U.S. Environmental Protection Agency, Region 9 (“EPA”) and County of Kauai, a Political Subdivision of the State of Hawaii, Lihu'e, Hawaii. Docket No. UIC-AO-2005-0006.
-
UIC-AO-2005-0009: Kailua Palms, Kailua, HI; Consent Agreement and Final Order
Consent Agreement and Final Order ("CAFO") between the U.S. Environmental Protection Agency, Region 9 (“EPA”) and Kailua Palms, Kailua, Hawaii. Docket No. UIC-AO-2005-0009.
-
SDWA-UIC-AOC-2021-0001: David Basque Trust, Kealakekua, HI; Administrative Order on Consent
Proposed Administrative Order on Consent (“Proposed Consent Order”), between the U.S. Environmental Protection Agency Region IX (“EPA”) and the David Basque Trust, Kealakekua, HI. Docket No. SDWA-UIC-AOC-2021-0001.
-
Approval for Managing PCB Wastes at US Ecology Idaho, Inc.
TSCA approval for commercial disposal of PCBs at the US Ecology Idaho, Inc. facility near Grand View, Idaho.
-
Approval for Managing PCB Wastes at Chemical Waste Management of the Northwest in Oregon
TSCA approval for commercial disposal of PCBs at the Chemical Waste Management of the Northwest, Inc., facility in Arlington, Oregon.
-
My firm is not certified and does not employ a certified renovator. If we are asked to perform a renovation in a pre-1978 home, we test for lead using an EPA-recognized lead test kit. Can we perform these lead tests without being a certified renovator?
No. When performing a renovation in a pre-1978 home, a firm is exempted from the requirements of the Lead Renovation, Repair, and Painting (RRP) Rule if a determination has been made that the surfaces affected by the renovation are free of paint or other surface coatings that contain lead equal…
-
My firm acts as a general contractor - we subcontract the entire renovation job to other companies rather than using our own employees. Does my firm need to be a certified firm under the RRP Rule?
Yes. Firms may not perform, offer, or claim to perform renovations covered by the RRP Rule without certification from EPA. A general contractor that subcontracts the entire renovation job to other firms must be certified as a firm for two reasons. First, the contractual agreement between the general contractor and…
-
GUS040000: Department of the Navy, Naval Base Guam MS4
Authorization to Discharge Under National Pollutant Discharge Elimination System (NPDES) Permit No. GUS040000 for Department of the Navy Naval Base Guam (NBG) Municipal Separate Storm Sewer System (MS4).
-
Program and Funding Resources
Review resources to help you learn more about the Brownfields Program and navigate grants and funding opportunities.
-
Lead Designations - Where You Live
Lead Designations Where You Live
-
System Documentation and Guidance for Production Volume Reporting
This page provides system documentation and guidance for production volume reporting for heavy-duty engines.
-
Timber Products Processing Effluent Guidelines Documents for 1974-1976 Rules
Federal Register notices and support documents for Timber Products Processing Effluent Guidelines (40 CFR Part 429)
-
Plastics Molding and Forming Effluent Guidelines Documents
Supporting documents for Plastics Molding and Forming Effluent Guidelines regulation (40 CFR Part 463)
-
Plastics Molding and Forming Effluent Guidelines
Overview and documents for the Plastics Molding and Forming Effluent Guidelines regulation (40 CFR Part 463)
-
Village of Maxwell - Draft NPDES Permit No. NM0029149
Village of Maxwell - Draft NPDES Permit No. NM0029149
-
Is a health care facility or hospital covered under the RRP Rule if it meets the definition of a child-occupied facility?
Yes. The Lead Renovation, Repair, and Painting (RRP) Rule defines a child-occupied facility as a building, or portion of a building, constructed prior to 1978, visited regularly by the same child, under six years of age, on at least two different days within any week (Sunday through Saturday period), provided…
-
I am a contractor a couple years from retirement and I am closing down my business. I do not plan to become certified under the RRP Rule. My understanding is that I can continue working on homes built after 1978?
The Lead Renovation, Repair, and Painting (RRP) Rule does not apply to renovations in housing built in 1978 or later. Question Number: 23002-17978 Find a printable PDF copy of all frequent questions pertaining to lead.
-
My company has two stores in different states. Must each store be a separate certified firm?
Answer: It depends on the company's structure. If each store is a separate legal entity, then each store must be a certified firm. If the parent company retains liability for the actions of each store, the parent company's firm certification covers both stores. Question Number: 23002-19722 Find a printable PDF…