Final Groundwater Interim Measures Sampling and Analysis Plan
Final Groundwater Interim Measures Sampling and Analysis Plan. Revision 1.0; October 9, 2012. This document serves as the quality assurance and quality control document for the groundwater sampling performed during the Interim Measure, both for the area of the former chemical plant located on the site and for the off-site area east.