Groudwater Interim Measures Work Plan Addendum for the Former Chemical Plant, Walter Coke, Birmingham, Alabama
Groudwater Interim Measures Work Plan Addendum for the Former Chemical Plant, Walter Coke, Birmingham, Alabama. February 11, 2011.
This Addendum presents minor modification to the well locations proposed in the original Interim Measures Work Plan and proposes performance monitoring. This Addendum also addressed EPA's comments.