Skip to main content
U.S. flag

An official website of the United States government

Here’s how you know

Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

HTTPS

Secure .gov websites use HTTPS
A lock (LockA locked padlock) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

    • Environmental Topics
    • Air
    • Bed Bugs
    • Chemicals, Toxics, and Pesticide
    • Emergency Response
    • Environmental Information by Location
    • Health
    • Land, Waste, and Cleanup
    • Lead
    • Mold
    • Radon
    • Research
    • Science Topics
    • Water Topics
    • A-Z Topic Index
    • Laws & Regulations
    • By Business Sector
    • By Topic
    • Compliance
    • Enforcement
    • Guidance
    • Laws and Executive Orders
    • Regulations
    • Report a Violation
    • Environmental Violations
    • Fraud, Waste or Abuse
    • About EPA
    • Our Mission and What We Do
    • Headquarters Offices
    • Regional Offices
    • Labs and Research Centers
    • Newsroom
    • Planning, Budget, and Results
    • Organization Chart
    • EPA History

Breadcrumb

  1. Home
  2. Air Quality Implementation Plans

EPA Approved New Hampshire Source-Specific Requirements

EPA-Approved New Hampshire Source-Specific Requirements
Name of sourcePermit No.State effective dateEPA approval date2Additional explanations/§52.1535 citation
The James River—Berlin/Gorham, Inc. Berlin, NHLetter (pdf) (147 KB)05/02/198409/27/1984
49 FR 38104
See 52.1535(c)(33). Administrative order issued May 2, 1984 to the James River Corporation.
Operating limits for boilers at Dartmouth CollegePermit Number PO-B-1501, condition 5 (pdf) (123 KB)01/06/198602/02/1987
52 FR 3117
See 52.1535(c)(35).
Operating limits for boilers at Dartmouth CollegePermit Number PO-B-1502, condition 5 (pdf) (127 KB)01/06/198602/02/1987
52 FR 3117
See 52.1535(c)(35).
Operating limits for boilers at Dartmouth CollegePermit No. PO-B-1503, condition 5 (pdf) (131 KB)01/06/198602/02/1987
52 FR 3117
See 52.1535(c)(35).
Operating limits for boilers at Dartmouth CollegeTemporary Permit TP-B-150, condition 2, 3 and 4 (pdf) (106 KB)01/06/198602/02/1987
52 FR 3117
See 52.1535(c)(35).
The James River Corporation, Groveton, NHPermit Number PO-B-1550, Conditions 5B, 5C, and 5D (pdf) (136 KB)09/06/198512/14/1987
52 FR 47392
See 52.1535(c)(38). The air permit conditions limit sulfur-in-fuel content to 2.2% sulfur by weight at the James River Corporation, Groveton, NH.
The James River Corporation, Groveton, NHPermit Number PO-B-213, Conditions 2 and 5A (pdf) (108 KB)09/06/198512/14/1987
52 FR 47392
See 52.1535(c)(38). The air permit conditions limit sulfur-in-fuel content to 2.2% sulfur by weight at the James River Corporation, Groveton, NH.
The James River Corporation, Groveton, NHPermit No. PO-B-214, Conditions 2 and 5A (pdf) (107 KB)09/06/198512/14/1987
52 FR 47392
See 52.1535(c)(38). The air permit conditions limit sulfur-in-fuel content to 2.2% sulfur by weight at the James River Corporation, Groveton, NH.
The James River Corporation, Groveton, NHPermit No. PO-B-215, Conditions 2 and 5A (pdf) (109 KB)09/06/198512/14/1987
52 FR 47392
See 52.1535(c)(38). The air permit conditions limit sulfur-in-fuel content to 2.2% sulfur by weight at the James River Corporation, Groveton, NH.
The James River Corporation, Groveton, NHPermit No. PO-BP-2240, Condition 5B (pdf) (112 KB)09/06/198512/14/1987
52 FR 47392
See 52.1535(c)(38). The air permit conditions limit sulfur-in-fuel content to 2.2% sulfur by weight at the James River Corporation, Groveton, NH.
VOC RACT for Textile Tapes Corporation, Gonic, NHOrder ARD-96-001 (pdf) (1.3 MB)10/04/199603/10/1998
63 FR 11600
See 52.1535(c)(51).
Source specific NOX RACT order for Public Service of New Hampshire, Bow, NHOrder ARD-97-001 (pdf) (2 MB)04/14/199705/13/1998
63 FR 26455
See 52.1535(c)(54).
Source specific NOX RACT order for Crown Vantage, Berlin, NHOrder ARD-97-003 (pdf) (238 KB)09/24/199705/13/1998
63 FR 26455
See 52.1535(c)(54).
Source-specific NOX RACT order and discrete emission reduction protocols for Public Service of New HampshireOrder ARD-98-001 (pdf) (1.2 MB)07/17/199811/14/2000
65 FR 68078
See 52.1535(c)(64).
VOC RACT for Anheuser-Busch, Merrimack, NHOrder ARD-00-001 (pdf) (7.2 MB)04/15/200207/23/2002
67 FR 48033
See 52.1535(c)(68).
PSNH Merrimack StationTP-0008 (pdf) (4.7 MB)07/08/201108/22/2012
77 FR 50602
Flue Gas Desulfurization System. Portions of this permit have been superseded by TP-0189 for PSNH d/b/a Eversource Energy Merrimack Station.
Hitchiner ManufacturingARD-02-001 (pdf) (3.5 MB)06/21/200211/05/2012
77 FR 66388
Single source VOC RACT order for facility in Milford, NH.
Hutchinson Sealing SystemsARD-11-001 (pdf) (257 KB)1/24/20253/23/2026
91 FR 13771
Revised single source VOC RACT Order for facility in Newfields, NH and replaces previously approved single source VOC RACT order from 2012 (77 FR 66388).
TFX Medical IncorporatedARD-07-002 (pdf) (72 KB)08/7/200711/05/2012
77 FR 66388
Single source VOC RACT order for facility in Jaffrey, NH.
Newington Energy, LLCARD-04-001 (pdf) (55 KB)06/20/200711/05/2012
77 FR 66388
Single source NOX RACT order for facility in Newington, NH.
Waste ManagementARD-01-001 (pdf) (75 KB)04/27/201211/05/2012
77 FR 66388
Single source NOX RACT order for facility in Rochester, NH.
Gorham Paper and TissueOrder No. ARD-97-003 (pdf) (7.2 MB)10/19/201208/21/2014
79 FR 49462
NOX RACT order.
Parker-Hannifin CorporationARD 03-001A (pdf) (3.5 MB)10/22/201408/29/2016
81 FR 59141
VOC RACT Order.
Textile Tapes CorporationARD-96-001 (pdf) (600 KB)07/30/201508/29/2016
81 FR 59141
VOC RACT Order.
Watts Regulator CompanyARD 07-001 (pdf) (8.5 MB)08/21/201508/29/2016
81 FR 59141
VOC RACT Order.
Sturm Ruger & CompanyARD-03-001 (pdf) (11.6 MB)02/02/201703/30/2018
83 FR 13668
VOC RACT Order, as amended February 2, 2017, except sections D.1, and introductory clauses to sections D.2, D.3.b, D.5.a.i and b.i.
PSNH d/b/a Eversource Energy Merrimack StationTP-0189 (pdf) (555 KB)09/01/20166/5/2018
83 FR 25922
Items 1, 2, and 3 in Table 4 "Operating and Emission Limits"; items 1 and 2 in Table 5 "Monitoring and Testing Requirements"; items 1 and 2 in Table 6 "Recordkeeping Requirements"; items 1 and 2 in Table 7 "Reporting Requirements".
Diacom CorporationRACT Order RO-0002 (pdf) (4.5 MB)06/28/201709/07/2018
83 FR 45356
VOC RACT Order.
Schiller StationNOx RACT Order RO-003 (pdf) (3.6 MB)09/06/201809/12/2019
84 FR 48068
Order contains NOx emission limits for emission units SR4 and SR6.
Anheuser BuschNOx RACT Order ARD-05-001 (pdf) (7 MB)01/17/201809/12/2019
84 FR 48068
Revisions made to testing requirements for two boilers.
Metal WorksVOC RACT Order ARD-05-001 (pdf) (5.6 MB)08/16/201809/12/2019
84 FR 48068
Order allows for compliance via purchase of emission reduction credits.
PolyonicsVOC RACT Order ARD07-004 (pdf) (7.4 MB)08/28/201809/12/2019
84 FR 48068
Order allows facility to generate emission reduction credits.
Complete Coverage WoodprimingVOC RACT Order RO-0004 (pdf) (481 KB)03/14/201909/12/2019
84 FR 48068
Order provides a VOC content limit for stain blocker used by the facility.
PSI Molded PlasticsRO-0005 (pdf) (1.7 MB)11/20/201907/01/2020
85 FR 39489
VOC RACT Order.
Fujifilm Dimatix IncorporatedRO-0006 (pdf) (318 KB)07/08/202102/14/2023
88 FR 9401 (pdf) (224 KB)
VOC RACT Order.
PAK Solutions LLC.RACT Order RO–0007 (pdf) (402 KB)12/14/202203/11/2024
89 FR 17285 (pdf) (223 KB)
VOC RACT Order.

2In order to determine the EPA effective date for a specific provision listed in this table, consult the Federal Register notice cited in this column for the particular provision.

[74 FR 50120, Sept. 30, 2009, as amended at 76 FR 40257, July 8, 2011; 76 FR 49672, Aug. 11, 2011; 77 FR 5702, Feb. 6, 2012; 77 FR 50607, 50610, Aug. 22, 2012; 77 FR 63233, Oct. 16, 2012; 77 FR 63233, Oct. 16, 2012; 77 FR 66395, Nov. 5, 2012; 77 FR 66926, Nov. 8, 2012; 78 FR 5302, Jan. 25, 2013; 78 FR 71507, Nov. 29, 2013; 79 FR 20099, Apr. 11, 2014; 79 FR 30736, May 29, 2014; 79 FR 35699, June 24, 2014; 79 FR 49462, Aug. 21, 2014; 80 FR 57724, Sept. 25, 2015; 80 FR 78139, Dec. 16, 2015; 81 FR 44553, July 8, 2016; 81 FR 53928, Aug. 15, 2016]; 81 FR 59141, Aug. 29, 2016; 81 FR 70361, Oct. 12, 2016; 81 FR 70632, Oct. 13, 2016; 81 FR 78054, Nov. 7, 2016]

Editorial Note: At 81 FR 44553, July 8, 2016, §52.1520 (e) table was amended; however, the amendment could not be incorporated due to inaccurate amendatory instruction.

Air Quality Implementation Plans

  • About Air Quality Implementation Plans
  • Approved Air Quality Implementation Plans
  • Develop an Air Quality SIP
  • Find a Regional Contact for Air Quality SIPs/FIPS/TIPs
  • Tools for SIP Status
Contact Us about Air Quality Implementation Plans
Contact Us about Air Quality Implementation Plans to ask a question, provide feedback, or report a problem.
Last updated on October 1, 2026
  • Assistance
  • Spanish
  • Arabic
  • Chinese (simplified)
  • Chinese (traditional)
  • French
  • Haitian Creole
  • Korean
  • Portuguese
  • Russian
  • Tagalog
  • Vietnamese
United States Environmental Protection Agency

Discover.

  • Accessibility Statement
  • Budget & Performance
  • Contracting
  • EPA www Web Snapshot
  • Grants
  • No FEAR Act Data
  • Plain Writing
  • Privacy and Security Notice

Connect.

  • Data
  • Inspector General
  • Jobs
  • Newsroom
  • Regulations.gov
  • Subscribe
  • USA.gov
  • White House

Ask.

  • Contact EPA
  • EPA Disclaimers
  • Hotlines
  • FOIA Requests
  • Frequent Questions
  • Site Feedback

Follow.