Skip to main content
U.S. flag

An official website of the United States government

Here’s how you know

Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

HTTPS

Secure .gov websites use HTTPS
A lock (LockA locked padlock) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

    • Environmental Topics
    • Air
    • Bed Bugs
    • Cancer
    • Chemicals, Toxics, and Pesticide
    • Emergency Response
    • Environmental Information by Location
    • Health
    • Land, Waste, and Cleanup
    • Lead
    • Mold
    • Radon
    • Research
    • Science Topics
    • Water Topics
    • A-Z Topic Index
    • Laws & Regulations
    • By Business Sector
    • By Topic
    • Compliance
    • Enforcement
    • Laws and Executive Orders
    • Regulations
    • Report a Violation
    • Environmental Violations
    • Fraud, Waste or Abuse
    • About EPA
    • Our Mission and What We Do
    • Headquarters Offices
    • Regional Offices
    • Labs and Research Centers
    • Planning, Budget, and Results
    • Organization Chart
    • EPA History

Breadcrumb

  1. Home
  2. EPA in New Jersey

Pompton Lakes Photo Gallery

This gallery provides representative photographs of the soil removal and dredging operations within the Pompton Lake Study Area (PLSA) performed starting in 2016 through the present.  It will be periodically updated in conjunction with the progress of the work.

Double click the images to enlarge or hover over to view photo captions.

Anchor Movement for Hydraulic Dredge October  2017
Bag Filter Change-out October  2017
Cleaning the Filter Press - November 2017
Cleaning the Filter Press - November 2017
Equipment Cleaning - November 2017
Equipment Decon During Demobilization - December 2017
Equipment Disassembly - November 2017
Equipment Loading During Demobilization - December 2017
Fast Feed Pump Operation October 2017
Filter Press Demobilization - December 2017
Managing Material on Load-out Pad October  2017
Mechanical Dredging and Rock Screening Vibration Bucket October 2017
Truck Cleaning Prior to Exiting Site - October 2017
Preparation of Work Area – August 2016
Preparation of Work Area Including View of Installed Sheet Pile – August 2016
Preparation of Work Area (Asphalt Pad Installed) – August 2016
Turbidity Curtain Installation for Access Channel Dredging – August 2016
Truck Decontamination Prior to Hauling Dredged/Processed Sediment Off-site – September 2016
Traffic Control for Haul Trucks Moving Off-site – September 2016
Covering Pile of Dredged/Processed Sediment in Staging Area – September 2016
Installation of Island Area Turbidity Curtain – October 2016
Off Loading Cement Bags to Stabilize Dredged Sediment – October 2016
Routine Equipment Maintenance – October 2016
Mechanical Dredging of Sediment from Island Area – October 2016
Unloading Scow for Dredged Sediment Processing – October 2016.jpg
Island Area Sediment Dredging – Loading Scow – November 2016
Transporting Scow with Dredged Sediment – November 2016
Truck Loading Processed Sediment in Staging Area – November 2016.jpg
Mechanical Dredging of Sediment in Island Area Near Shoreline – November 2016
Truck Loading Processed Sediment in Staging Area – November 2016
Mixing Portland Cement into Dredged Sediment and Associated Dust Control – November 2016
Mechanical Dredge on Barge in Icy Waters on Pompton Lake – December 2016
Bubblers in Pompton Lake to Reduce Icing Near Stored Equipment – December 2016
Crane Utilized for Lifts of Heavy Equipment (e.g. Hydraulic Dredge, Filter Presses) – April 2017
Crane Lift of Hydraulic Dredge for Placement in Pompton Lake – April 2017
Crane Lift of Hydraulic Dredge for Placement in Pompton Lake – April 2017
Crane Lift to Install Filter Press Used in Dredged Sediment Processing – April 2017
Granulated Activated Carbon Units Used in Processing of Water from Dredged Sediment – April 2017
Crane Lift to Install Conveyor Used to Transfer Processed Sediment to Staging Area for Load-out and Off-site Disposal – May 2017
Assembly of Canopy Used to Protect Filter Presses – May 2017
Crane Lift to Install Canopy Over Filter Presses to Protect the Equipment – May 2017
Transformer Wiring that will Provide Power to Sediment Processing Operation – May 2017
Electrical Wiring that will Provide Power to Sediment Processing Operation – May 2017
Electrical Hook-up that will Provide Power to Sediment Processing Operation – May 2017
Backwash Tank Utilized in Sediment Processing – May 2017
Loading Carbon into Granulated Activated Carbon Unit – May 2017
Crane Lift to Install Conveyor Used to Transfer Processed Sediment to Staging Area for Load-out and Off-site Disposal – May 2017
Assembly of Filter Press Used in Sediment Processing – May 2017
Installation of Filter Bags Used in Processing of Water from Dredged Sediment – May 2017
Integrity Testing of Filtrate Tank with Potable Water –May 2017
Conveyor Transferring Processed Sediment onto Staging Area in Conjunction with Management of Sediment Pile – June 2017
Hydraulic Dredge Unit – June 2017
De-sanding Unit that Separates Coarse from Fine Grained Sediment for Further Processing – June 2017
Truck Decontamination Prior to Hauling Processed Sediment Off-site for Disposal – June 2017
De-watered Sediment (i.e. Filter Cake) in Filter Press – June 2017
Filter Cake on Conveyor Being Transferred onto Staging Area for Subsequent Off-site Disposal – June 2017
Dredged Sediment Water Being Transferred from Filter Press to Filtrate Tank for Further Processing – June 2017
Dredged Sediment Being Processed Through De-sanding Unit Separating Coarse From Fine Grained Material – June 2017
Movement of Hydraulic Dredge (via Lifting of Dredge Anchor) to Another Dredging Location within the Acid Brook Delta – June 2017
Covering of Processed Dredge Sediment Pile at Completion of Work Day – June 2017
Equipment Maintenance – Filter Bag Change-out – June 2017
On-site Routine Dust Control with Water Truck – June 2017
Hydraulic Dredge Unit with Turbidity Curtain in Background – July 2017
Processed Dredged Sediment Being Loaded for Off-site Disposal – July 2017
De-sanding Unit Operation – July 2017
Coarse Dredged Sediment Leaving De-sanding Unit to be Conveyed to Staging Area – July 2017
Debris Which Inhibits Hydraulic Dredging Operations – July 2017
Debris Which Inhibits Hydraulic Dredging Operations Seen on Dredge Cutter Head – July 2017
Mechanical Dredging of Shoreline to Facilitate Subsequent Hydraulic Dredging – July 2017
Rainwater Management within Contained Sediment Processing Area – July 2017
Covering of Processed Dredge Sediment Pile at Completion of Work Day – July 2017
Filling of Tote with Polymer Utilized in Sediment Processing – July 2017
Equipment Maintenance – Filter Bag Being Changed-out – July 2017
Hydraulic and Mechanical Dredge Units on the Water – July 2017
Water view of Sediment Processing Area, Specifically the Granulated Activated Carbon Units – July 2017
Chemours
Chemours
Pompton Lakes, September 2017
Pompton Lakes, September 2017
Filter Cloth Wash Process, September 2017
Water View of Dewatering Process September 2017
Debris with Rock Loaded into Trucks - September 2017
Mechanical Excavation of Shoreline - September 2017

Public Meeting

No public meetings scheduled at this time
https://www.epa.gov/nj/chemours-pompton-lakes-works-site-pompton-lakes-nj

Homeowner Selection of Sampling Contractor

What you need to know and the forms to complete.

More Information

  • Home
  • DuPont E.I. De Nemours & Company Pompton Lakes
  • Additional Documents
  • Community Advisory Group News
  • News
  • EPA's Pompton Lakes/DuPont Group 
  • Public Library Repository Index 
  • Photo Gallery

Related Websites

The following links exit the site

  • New Jersey Dept of Environmental Protection

Your EPA Contact

Patricia Seppi (646) 369-0068
seppi.pat@epa.gov

Perry Katz (212) 637-4426
katz.ira-perry@epa.gov

Mailing List

Join our Mailing List to receive updates on EPA's activities at this site! Sign Up Today!

Contact Us to ask a question, provide feedback, or report a problem.
Last updated on March 3, 2025
  • Assistance
  • Spanish
  • Arabic
  • Chinese (simplified)
  • Chinese (traditional)
  • French
  • Haitian Creole
  • Korean
  • Portuguese
  • Russian
  • Tagalog
  • Vietnamese
United States Environmental Protection Agency

Discover.

  • Accessibility Statement
  • Budget & Performance
  • Contracting
  • EPA www Web Snapshot
  • Grants
  • No FEAR Act Data
  • Plain Writing
  • Privacy
  • Privacy and Security Notice

Connect.

  • Data
  • Inspector General
  • Jobs
  • Newsroom
  • Regulations.gov
  • Subscribe
  • USA.gov
  • White House

Ask.

  • Contact EPA
  • EPA Disclaimers
  • Hotlines
  • FOIA Requests
  • Frequent Questions
  • Site Feedback

Follow.