Revisions to the Risk Assessment Work Plan (Revision 1.1) for the Walter Coke site
Revisions to the Risk Assessment Work Plan (Revision 1.1) for the Walter Coke site submitted by Terracon Consultants Inc on March 6, 2013. These revisions have been prepared in response to Final Comments dated 2/8/13 for the Risk Assessment Work Plan (RAWP) from the EPA.