Skip to main content
U.S. flag

An official website of the United States government

Here’s how you know

Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

HTTPS

Secure .gov websites use HTTPS
A lock (LockA locked padlock) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

    • Environmental Topics
    • Air
    • Bed Bugs
    • Cancer
    • Chemicals, Toxics, and Pesticide
    • Emergency Response
    • Environmental Information by Location
    • Health
    • Land, Waste, and Cleanup
    • Lead
    • Mold
    • Radon
    • Research
    • Science Topics
    • Water Topics
    • A-Z Topic Index
    • Laws & Regulations
    • By Business Sector
    • By Topic
    • Compliance
    • Enforcement
    • Laws and Executive Orders
    • Regulations
    • Report a Violation
    • Environmental Violations
    • Fraud, Waste or Abuse
    • About EPA
    • Our Mission and What We Do
    • Headquarters Offices
    • Regional Offices
    • Labs and Research Centers
    • Planning, Budget, and Results
    • Organization Chart
    • EPA History

Breadcrumb

  1. Home
  2. Air Quality Implementation Plans

EPA Approved New Hampshire Source-Specific Requirements

EPA-Approved New Hampshire Source-Specific Requirements
Name of source Permit No. State effective date EPA approval date2 Additional explanations/§52.1535 citation
The James River—Berlin/Gorham, Inc. Berlin, NH Letter (pdf) (147 KB) 5/2/1984 9/27/1984
49 FR 38104
See 52.1535(c)(33). Administrative order issued May 2, 1984 to the James River Corporation.
Operating limits for boilers at Dartmouth College Permit Number PO-B-1501, condition 5 (pdf) (123 KB) 1/6/1986 2/2/1987
52 FR 3117
See 52.1535(c)(35).
Operating limits for boilers at Dartmouth College Permit Number PO-B-1502, condition 5 (pdf) (127 KB) 1/6/1986 2/2/1987
52 FR 3117
See 52.1535(c)(35).
Operating limits for boilers at Dartmouth College Permit No. PO-B-1503, condition 5 (pdf) (131 KB) 1/6/1986 2/2/1987
52 FR 3117
See 52.1535(c)(35).
Operating limits for boilers at Dartmouth College Temporary Permit TP-B-150, condition 2, 3 and 4 (pdf) (106 KB) 1/6/1986 2/2/1987
52 FR 3117
See 52.1535(c)(35).
The James River Corporation, Groveton, NH Permit Number PO-B-1550, Conditions 5B, 5C, and 5D (pdf) (136 KB) 9/6/1985 12/14/1987
52 FR 47392
See 52.1535(c)(38). The air permit conditions limit sulfur-in-fuel content to 2.2% sulfur by weight at the James River Corporation, Groveton, NH.
The James River Corporation, Groveton, NH Permit Number PO-B-213, Conditions 2 and 5A (pdf) (108 KB) 9/6/1985 12/14/1987
52 FR 47392
See 52.1535(c)(38). The air permit conditions limit sulfur-in-fuel content to 2.2% sulfur by weight at the James River Corporation, Groveton, NH.
The James River Corporation, Groveton, NH Permit No. PO-B-214, Conditions 2 and 5A (pdf) (107 KB) 9/6/1985 12/14/1987
52 FR 47392
See 52.1535(c)(38). The air permit conditions limit sulfur-in-fuel content to 2.2% sulfur by weight at the James River Corporation, Groveton, NH.
The James River Corporation, Groveton, NH Permit No. PO-B-215, Conditions 2 and 5A (pdf) (109 KB) 9/6/1985 12/14/1987
52 FR 47392
See 52.1535(c)(38). The air permit conditions limit sulfur-in-fuel content to 2.2% sulfur by weight at the James River Corporation, Groveton, NH.
The James River Corporation, Groveton, NH Permit No. PO-BP-2240, Condition 5B (pdf) (112 KB) 9/6/1985 12/14/1987
52 FR 47392
See 52.1535(c)(38). The air permit conditions limit sulfur-in-fuel content to 2.2% sulfur by weight at the James River Corporation, Groveton, NH.
VOC RACT for Textile Tapes Corporation, Gonic, NH Order ARD-96-001 (pdf) (1.3 MB) 10/4/1996 3/10/1998
63 FR 11600
See 52.1535(c)(51).
Source specific NOX RACT order for Public Service of New Hampshire, Bow, NH Order ARD-97-001 (pdf) (2 MB) 4/14/1997 5/13/1998
63 FR 26455
See 52.1535(c)(54).
Source specific NOX RACT order for Crown Vantage, Berlin, NH Order ARD-97-003 (pdf) (238 KB) 9/24/1997 5/13/1998
63 FR 26455
See 52.1535(c)(54).
Source-specific NOX RACT order and discrete emission reduction protocols for Public Service of New Hampshire Order ARD-98-001 (pdf) (1.2 MB) 7/17/1998 11/14/2000
65 FR 68078
See 52.1535(c)(64).
VOC RACT for Anheuser-Busch, Merrimack, NH Order ARD-00-001 (pdf) (7.2 MB) 4/15/2002 7/23/2002
67 FR 48033
See 52.1535(c)(68).
PSNH Merrimack Station TP-0008 (pdf) (4.7 MB) 7/8/2011 8/22/2012
77 FR 50602
Flue Gas Desulfurization System. Portions of this permit have been superseded by TP-0189 for PSNH d/b/a Eversource Energy Merrimack Station.
Hitchiner Manufacturing ARD-02-001 (pdf) (3.5 MB) 6/21/2002 11/5/2012
77 FR 66388
Single source VOC RACT order for facility in Milford, NH.
Hutchinson Sealing Systems ARD-01-002 (pdf) (77 KB) 8/8/2002 11/5/2012
77 FR 66388
Single source VOC RACT order for facility in Newfields, NH.
TFX Medical Incorporated ARD-07-002 (pdf) (72 KB) 8/7/2007 11/5/2012
77 FR 66388
Single source VOC RACT order for facility in Jaffrey, NH.
Newington Energy, LLC ARD-04-001 (pdf) (55 KB) 6/20/2007 11/5/2012
77 FR 66388
Single source NOX RACT order for facility in Newington, NH.
Waste Management ARD-01-001 (pdf) (75 KB) 4/27/2012 11/5/2012
77 FR 66388
Single source NOX RACT order for facility in Rochester, NH.
Gorham Paper and Tissue Order No. ARD-97-003 (pdf) (7.2 MB) 10/19/2012 08/21/2014
79 FR 49462
NOX RACT order.
Parker-Hannifin Corporation ARD 03-001A (pdf) (3.5 MB) 10/22/2014 8/29/2016
81 FR 59141
VOC RACT Order.
Textile Tapes Corporation ARD-96-001 (pdf) (600 KB) 7/30/2015 8/29/2016
81 FR 59141
VOC RACT Order.
Watts Regulator Company ARD 07-001 (pdf) (8.5 MB) 8/21/2015 8/29/2016
81 FR 59141
VOC RACT Order.
Sturm Ruger & Company

ARD-03-001 (pdf) (11.6 MB)

2/2/2017 3/30/2018
83 FR 13668
VOC RACT Order, as amended February 2, 2017, except sections D.1, and introductory clauses to sections D.2, D.3.b, D.5.a.i and b.i.
PSNH d/b/a Eversource Energy Merrimack Station

TP-0189 (pdf) (555 KB)

9/1/2016 6/5/2018
83 FR 25922
Items 1, 2, and 3 in Table 4 "Operating and Emission Limits"; items 1 and 2 in Table 5 "Monitoring and Testing Requirements"; items 1 and 2 in Table 6 "Recordkeeping Requirements"; items 1 and 2 in Table 7 "Reporting Requirements".
Diacom Corporation

RACT Order RO-0002 (pdf) (4.5 MB)

6/28/2017 9/7/2018
83 FR 45356
VOC RACT Order.
Schiller Station

NOx RACT Order RO-003 (pdf) (3.6 MB)

9/6/2018 9/12/2019
84 FR 48068
Order contains NOx emission limits for emission units SR4 and SR6.
Anheuser Busch

NOx RACT Order ARD-05-001 (pdf) (7 MB)

1/17/2018 9/12/2019
84 FR 48068
Revisions made to testing requirements for two boilers.
Metal Works

VOC RACT Order ARD-05-001 (pdf) (5.6 MB)

8/16/2018 9/12/2019
84 FR 48068
Order allows for compliance via purchase of emission reduction credits.
Polyonics

VOC RACT Order ARD07-004 (pdf) (7.4 MB)

8/28/2018 9/12/2019
84 FR 48068
Order allows facility to generate emission reduction credits.
Complete Coverage Woodpriming

VOC RACT Order RO-0004 (pdf) (481 KB)

3/14/2019 9/12/2019
84 FR 48068
Order provides a VOC content limit for stain blocker used by the facility.
PSI Molded Plastics

RO-0005 (pdf) (1.7 MB)

11/20/2019 7/1/2020
85 FR 39489
VOC RACT Order.
Fujifilm Dimatix Incorporated RO-0006 (pdf) (318 KB) 7/8/2021 2/14/2023
88 FR 9401 (pdf) (224 KB)
VOC RACT Order.

2In order to determine the EPA effective date for a specific provision listed in this table, consult the Federal Register notice cited in this column for the particular provision.

[74 FR 50120, Sept. 30, 2009, as amended at 76 FR 40257, July 8, 2011; 76 FR 49672, Aug. 11, 2011; 77 FR 5702, Feb. 6, 2012; 77 FR 50607, 50610, Aug. 22, 2012; 77 FR 63233, Oct. 16, 2012; 77 FR 63233, Oct. 16, 2012; 77 FR 66395, Nov. 5, 2012; 77 FR 66926, Nov. 8, 2012; 78 FR 5302, Jan. 25, 2013; 78 FR 71507, Nov. 29, 2013; 79 FR 20099, Apr. 11, 2014; 79 FR 30736, May 29, 2014; 79 FR 35699, June 24, 2014; 79 FR 49462, Aug. 21, 2014; 80 FR 57724, Sept. 25, 2015; 80 FR 78139, Dec. 16, 2015; 81 FR 44553, July 8, 2016; 81 FR 53928, Aug. 15, 2016]; 81 FR 59141, Aug. 29, 2016; 81 FR 70361, Oct. 12, 2016; 81 FR 70632, Oct. 13, 2016; 81 FR 78054, Nov. 7, 2016]

Editorial Note: At 81 FR 44553, July 8, 2016, §52.1520 (e) table was amended; however, the amendment could not be incorporated due to inaccurate amendatory instruction.

Air Quality Implementation Plans

  • About Air Quality Implementation Plans
  • Approved Air Quality Implementation Plans
  • Develop an Air Quality SIP
  • Find a Regional Contact for Air Quality SIPs/FIPS/TIPs
  • Tools for SIP Status
Contact Us about Air Quality Implementation Plans
Contact Us to ask a question, provide feedback, or report a problem.
Last updated on August 26, 2024
  • Assistance
  • Spanish
  • Arabic
  • Chinese (simplified)
  • Chinese (traditional)
  • French
  • Haitian Creole
  • Korean
  • Portuguese
  • Russian
  • Tagalog
  • Vietnamese
United States Environmental Protection Agency

Discover.

  • Accessibility Statement
  • Budget & Performance
  • Contracting
  • EPA www Web Snapshot
  • Grants
  • No FEAR Act Data
  • Plain Writing
  • Privacy
  • Privacy and Security Notice

Connect.

  • Data
  • Inspector General
  • Jobs
  • Newsroom
  • Regulations.gov
  • Subscribe
  • USA.gov
  • White House

Ask.

  • Contact EPA
  • EPA Disclaimers
  • Hotlines
  • FOIA Requests
  • Frequent Questions
  • Site Feedback

Follow.