Skip to main content
U.S. flag

An official website of the United States government

Here’s how you know

Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

HTTPS

Secure .gov websites use HTTPS
A lock (LockA locked padlock) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

    • Environmental Topics
    • Air
    • Bed Bugs
    • Cancer
    • Chemicals, Toxics, and Pesticide
    • Emergency Response
    • Environmental Information by Location
    • Health
    • Land, Waste, and Cleanup
    • Lead
    • Mold
    • Radon
    • Research
    • Science Topics
    • Water Topics
    • A-Z Topic Index
    • Laws & Regulations
    • By Business Sector
    • By Topic
    • Compliance
    • Enforcement
    • Laws and Executive Orders
    • Regulations
    • Report a Violation
    • Environmental Violations
    • Fraud, Waste or Abuse
    • About EPA
    • Our Mission and What We Do
    • Headquarters Offices
    • Regional Offices
    • Labs and Research Centers
    • Planning, Budget, and Results
    • Organization Chart
    • EPA History

Breadcrumb

  1. Home
  2. Air Quality Implementation Plans

Texas SIP: 30 TAC 116.141. Determination of Fees; SIP effective 1997.10.20 TXc102

Regulatory Text: 
NOTE TO READER: See See § 116.11 for rest of Regulation VI SIP-approved permit fees regulations.

                SUBCHAPTER B : NEW SOURCE REVIEW PERMITS

                      DIVISION 4 : PERMIT FEES

Outline:
   §116.141.  Determination of Fees.


§116.141.  Determination of Fees.

(Approved by EPA 08/19/97 (62 FR 44083) at 52.2270(c)(102) effective 10/20/97.)

102B  (a)  The estimated capital cost of the project is the estimated total cost of the equipment and services that would normally be capitalized according to standard and generally accepted corporate financing and accounting procedures.

102B  (b)  NOT in Texas SIP.  See 102B 

102B  (c)  If the estimated capital cost of the project is less than $50 million, the permit applicant shall include a certification that the estimated capital cost of the project is correct.  Certification of the estimated capital cost of the project may be spot checked and evaluated for reasonableness during permit processing.  The reasonableness of project capital cost estimates used as a basis for permit fees shall be determined by the extent to which such estimates include fair and reasonable estimates of the capital value of the direct and indirect costs listed as follows.

102B       (1)  Direct costs are as follows:

102B            (A)  process and control equipment not previously owned by the applicant and permitted in Texas;

102B            (B)  auxiliary equipment, including exhaust hoods, ducting, fans, pumps, piping, conveyors, stacks, storage tanks, waste-disposal facilities, and air pollution control equipment specifically needed to meet permit and regulation requirements;

102B            (C)  freight charges;

102B            (D)  site preparation (including demolition), construction of fences, outdoor lighting, road, and parking areas;

102B            (E)  installation (including foundations), erection of supporting structures, enclosures or weather protection, insulation and painting, utilities and connections, process integration, and process control equipment;

102B            (F)  auxiliary buildings, including materials storage, employee facilities, and changes to existing structures;

102B            (G)  ambient air monitoring network.

102B       (2)  Indirect costs are as follows:

102B            (A)  final engineering design and supervision, and administrative overhead;

102B            (B)  construction expense (including construction liaison), securing local building permits, insurance, temporary construction facilities, and construction clean-up;

102B            (C)  contractor's fee and overhead.

102B  (d)  A fee of $75,000 shall be required if no estimate of capital project cost is included with a permit application.

102B  (e)  An applicant for a permit or permit amendment not involving any capital expenditure shall be required to remit the minimum permit fee of $450.

As adopted by TACB August 16, 1993 effective September 13, 1993

********************* end 116.141 **********************87f**

Air Quality Implementation Plans

  • About Air Quality Implementation Plans
  • Approved Air Quality Implementation Plans
  • Develop an Air Quality SIP
  • Find a Regional Contact for Air Quality SIPs/FIPS/TIPs
  • Tools for SIP Status
Contact Us about Air Quality Implementation Plans
Contact Us to ask a question, provide feedback, or report a problem.
Last updated on February 11, 2025
  • Assistance
  • Spanish
  • Arabic
  • Chinese (simplified)
  • Chinese (traditional)
  • French
  • Haitian Creole
  • Korean
  • Portuguese
  • Russian
  • Tagalog
  • Vietnamese
United States Environmental Protection Agency

Discover.

  • Accessibility Statement
  • Budget & Performance
  • Contracting
  • EPA www Web Snapshot
  • Grants
  • No FEAR Act Data
  • Plain Writing
  • Privacy
  • Privacy and Security Notice

Connect.

  • Data
  • Inspector General
  • Jobs
  • Newsroom
  • Regulations.gov
  • Subscribe
  • USA.gov
  • White House

Ask.

  • Contact EPA
  • EPA Disclaimers
  • Hotlines
  • FOIA Requests
  • Frequent Questions
  • Site Feedback

Follow.